If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Licking_County,_Ohio|Licking]] | | County: [[Licking_County,_Ohio|Licking]] | ||
|- | |- | ||
− | | Municipality: [[Bowling_Green_Township,_Licking_County,_Ohio|Bowling | + | | Municipality: [[Bowling_Green_Township,_Licking_County,_Ohio|Bowling Green Township]] |
|- | |- | ||
| Operator Name: [[KNOX ENERGY INC.]] | | Operator Name: [[KNOX ENERGY INC.]] |
Well ID: 34-089-26147 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.94616143,"lon":-82.23586353,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Bowling Green Township | |
Operator Name: KNOX ENERGY INC. | |
Well Pad ID: | |
Farm/Lease Name: KROFFT J | |
License Status: Producing | |
License Date: 2014-04-25 | |
Spud Date: 2014-09-09 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2014-09-06 | |
Well Total Depth: 3137 ft | |
Configuration: Vertical | |
Latitude: 39.946161430 | |
Longitude: -82.23586353 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-04-25 | Proposed Formations:BERERA THRU CLINTON, Issued Date:4/25/2014, Expired Date:4/24/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-09-06 | |
Completion Report Received | 2014-12-12 | |
Construction Permit Expires | 2016-04-24 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-12-15 | 3002 | 3033 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-09-18 | H2O | 15 | 564236 Gal | 30000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | KNOX ENERGY INC. | 0 | 0 | 0 |
2015 | KNOX ENERGY INC. | 0 | 49 | 365 |
2016 | KNOX ENERGY INC. | 0 | 0 | 0 |
2017 | KNOX ENERGY INC. | 0 | 0 | 365 |
2018 | KNOX ENERGY INC. | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | KNOX ENERGY INC. | Brine | 70 | 0 |
2015 | KNOX ENERGY INC. | Brine | 44 | 365 |
2016 | KNOX ENERGY INC. | Brine | 0 | 0 |
2017 | KNOX ENERGY INC. | Brine | 0 | 365 |
2018 | KNOX ENERGY INC. | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0012978465 | 2014-09-03 | Casing String Witnessed | No Violations | I witnessed the cementing of the 8 inch surface casing on Kilbarger rig #5 for Knox Energy. Bill Mitton was on location. Petroset Cementing was contracted to cement casing. Petroset broke circulation and good cement returns were observed. The cement stayed at surface. A cement basket was not used. |
0208812346 | 2014-09-16 | Production Wells | No Violations | This inspection was conducted as a status check. Frac tanks were being hauled onto location during inspection. A service rig has moved onto well. The well will be fraced on 9/18/2014. |
1582202764 | 2015-07-20 | Preliminary Restoration | No Violations | Inspect well as part of a preliminary restoration status check. The well was equipped with a pumping unit and motor. The tank battery consists of (1) 100 barrel tank inside an earthen dike. Identification was posted on the tank. Restoration has been completed. No violations. Time of inspection: 12:30 PM. Weather: 82*F, Sunny |
1695992185 | 2014-09-09 | Drill / Deepen / Reopen | No Violations | This inspection was conducted as a status check. The well has been drilled and the rig has moved to a new location. The 4.5 inch casing was cemented on 9/6/2014. No activity during inspection. No violations. |
2103580301 | 2014-12-30 | Production Wells | No Violations | This inspection was conducted as a status check. The well was equipped with a pumping unit and motor. The tank battery consists of (1) 100 barrel tank inside an earthen dike. Identification was posted on the tank. The restoration is not complete. Vegetation was not established and a 300 barrel frac tank was on location. Restoration will be complete when tank is removed and vegetation is established. |
For data sources see[9]