If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Final Restoration | | License Status: Final Restoration | ||
|- | |- | ||
− | | License Date: | + | | License Date: 1997-07-07 |
|- | |- | ||
| Spud Date: 1982-04-06 | | Spud Date: 1982-04-06 |
Well ID: 34-127-24555 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.835794268,"lon":-82.25145161,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Perry | |
Municipality: Hopewell Township | |
Operator Name: R C POLING CO INC | |
Well Pad ID: | |
Farm/Lease Name: WINTHRUP L | |
License Status: Final Restoration | |
License Date: 1997-07-07 | |
Spud Date: 1982-04-06 | |
Spud Drilling Contractor: | |
Final Drill Date: 1982-07-26 | |
Well Total Depth: 3097 ft | |
Configuration: Vertical | |
Latitude: 39.835794268 | |
Longitude: -82.25145161 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-12-15 | 48 JADOIL INC D VERNAU GeoDate 12/15/81 |
Oil and Gas | 1981-12-15 | Issued Date 12/15/81 Expired Date 12/15/82 Acres 0000000 Tool Type Proposed Formation Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1982-04-06 | R.I. 7-31-80 |
Completed | 1982-07-26 | R.I. 7-31-80 |
Reached Total Depth | 1982-07-26 | R.I. 7-31-80 |
Construction Permit Expires | 1982-12-15 | R.I. 7-31-80 |
CO | 1992-01-29 | 4184 WESTAR PETROLEUM CORP, GeoDate 12/15/81 |
CO | 1996-06-18 | 236 POLING R C CO INC GeoDate 12/15/81 |
APP | 1997-07-07 | 236 POLING R C CO INC Proposed Formation CLINTON Issued Date 7/7/97 Expired Date 7/7/98 6:00:00 AM |
Plugged/Abandoned | 1997-09-16 | R.I. 7-31-80 |
Record Last Modified | 2013-03-14 | R.I. 7-31-80 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1400 Bbl | 15000 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | JADOIL INC D VERNAU | 1025 | 1224 | 0 |
1985 | JADOIL INC D VERNAU | 880 | 852 | 365 |
1986 | JADOIL INC D VERNAU | 155 | 464 | 365 |
1987 | JADOIL INC D VERNAU | 183 | 465 | 145 |
1988 | JADOIL INC D VERNAU | 1053 | 316 | 150 |
1990 | JADOIL INC D VERNAU | 13 | 52 | 53 |
1995 | WESTAR PETROLEUM CORP, | 0 | 0 | 120 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | JADOIL INC D VERNAU | Brine | 50 | 0 |
1985 | JADOIL INC D VERNAU | Brine | 104 | 365 |
1986 | JADOIL INC D VERNAU | Brine | 208 | 365 |
1987 | JADOIL INC D VERNAU | Brine | 72 | 145 |
1988 | JADOIL INC D VERNAU | Brine | 70 | 150 |
1990 | JADOIL INC D VERNAU | Brine | 0 | 53 |
1995 | WESTAR PETROLEUM CORP, | Brine | 0 | 120 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
iANGE00135 | 1998-06-03 | Final Restoration | No Violations |
For data sources see[8]