X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-46142"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-46142
 
| Well ID: 37-121-46142
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.383711, -79.773519 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.383711, -79.773519 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/06/2017
+
| Spud Date: 2017-07-06
 
|-
 
|-
| Permit Date: 3/9/2017
+
| Permit Date: 2017-03-09
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 451.24
 
| style="text-align: right;" | 451.24
 
| style="text-align: right;" | 150
 
| style="text-align: right;" | 150
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 42.52
 
| style="text-align: right;" | 42.52
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 93: Line 118:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,768.95 Bbl
 
| style="text-align: right;" | 1,768.95 Bbl
Line 99: Line 124:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 9.29 Bbl
 
| style="text-align: right;" | 9.29 Bbl
Line 105: Line 130:
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 274.29 Bbl
 
| style="text-align: right;" | 274.29 Bbl
Line 111: Line 136:
 
| PA0023213
 
| PA0023213
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 140.00 Bbl
 
| style="text-align: right;" | 140.00 Bbl
Line 117: Line 142:
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 52.86 Bbl
 
| style="text-align: right;" | 52.86 Bbl
Line 123: Line 148:
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 31.43 Bbl
 
| style="text-align: right;" | 31.43 Bbl
Line 129: Line 154:
 
|  
 
|  
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,017.38 Bbl
 
| style="text-align: right;" | 1,017.38 Bbl
Line 135: Line 160:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 523.57 Bbl
 
| style="text-align: right;" | 523.57 Bbl
Line 141: Line 166:
 
| 34-155-24079
 
| 34-155-24079
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.71 Bbl
 
| style="text-align: right;" | 15.71 Bbl
Line 147: Line 172:
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 167.86 Bbl
 
| style="text-align: right;" | 167.86 Bbl
Line 153: Line 178:
 
| PA0023213
 
| PA0023213
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.71 Bbl
 
| style="text-align: right;" | 15.71 Bbl
Line 332: Line 357:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 07:21, 1 August 2019

Well Details

Well ID: 37-121-46142
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Franklin City
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLLOW LOT 82 3491
License Status: Active
Spud Date: 2017-07-06
Permit Date: 2017-03-09
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.383711
Longitude: -79.773519

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CATALYST ENERGY INC 0.00 0 451.24 150 0.00 0
2018 CATALYST ENERGY INC 0.00 0 42.52 365 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2017-A00 Produced Fluid (in Barrels) RWC 802 1,768.95 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017-A00 Produced Fluid (in Barrels) RWC 802 9.29 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2017-A00 Produced Fluid (in Barrels) RWC 802 274.29 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017-A00 Produced Fluid (in Barrels) RWC 802 140.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017-A00 Produced Fluid (in Barrels) RWC 802 52.86 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-A00 Produced Fluid (in Barrels) RWC 802 31.43 Bbl ROAD SPREADING
2018-A00 Produced Fluid (in Barrels) RWC 802 1,017.38 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018-A00 Produced Fluid (in Barrels) RWC 802 523.57 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018-A00 Produced Fluid (in Barrels) RWC 802 15.71 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018-A00 Produced Fluid (in Barrels) RWC 802 167.86 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018-A00 Produced Fluid (in Barrels) RWC 802 15.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2600602 Primary Facility 2017-06-02 Routine/Complete Inspection No Violations Noted Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation.
2600604 Primary Facility 2017-06-02 Routine/Complete Inspection No Violations Noted Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation.
2600605 Primary Facility 2017-06-02 Routine/Complete Inspection No Violations Noted Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation.
2603569 Primary Facility 2017-06-12 Routine/Partial Inspection No Violations Noted
2606056 Primary Facility 2017-06-19 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site.
2606060 Primary Facility 2017-06-19 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site.
2606062 Primary Facility 2017-06-19 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site.
2606063 Primary Facility 2017-06-19 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site.
2612644 Primary Facility 2017-07-06 Drilling/Alteration No Violations Noted
2613789 Primary Facility 2017-07-06 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The rig is currently shut down waiting to cement the casing. The pit is lined with greater than two feet of freeboard. The site is stable, there are no E&S issues.
2613793 Primary Facility 2017-07-10 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is drilled, pit is lined with greater than two feet of freeboard. The site is stable there are no E&S issues.
2616683 Primary Facility 2017-07-13 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is drilled, pit lined with greater than two feet of freeboard. The site has been mulched and is stable. There are no E&S issues.
2621596 Primary Facility 2017-08-01 Drilling/Alteration No Violations Noted
2623607 Primary Facility 2017-07-31 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. Currently setting up to notch the well. A pit is not being utilized containment is setup. There are no E&S issues.
2623672 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site has been graded and mulched. There are no E&S issues.
2627700 Primary Facility 2017-08-22 Administrative/File Review No Violations Noted
2678127 Primary Facility 2018-01-03 Routine/Partial Inspection No Violations Noted Inspection shows well active and currently shut down due to the cold weather. Well equipped with rods, tubing, and pump jack with an electric motor. Label attached to the well head with annulus vented to the atmosphere.
2729839 Primary Facility 2018-05-14 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Vegetation is established onsite. There are no E&S issues.

For data sources see[6]

References