X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-23360"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-23360
 
| Well ID: 37-085-23360
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.446481, -80.385475 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.446481, -80.385475 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/26/2003
+
| Spud Date: 2003-07-26
 
|-
 
|-
| Permit Date: 7/21/2003
+
| Permit Date: 2003-07-21
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 67: Line 92:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 76: Line 101:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 85: Line 110:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 103: Line 128:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 112: Line 137:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 121: Line 146:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 137: Line 162:
 
| style="text-align: right;" | 87
 
| style="text-align: right;" | 87
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 165: Line 190:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2004-0
+
| 2004-A00
 
| Brine
 
| Brine
 
| style="text-align: right;" | 354.00 Bbl
 
| style="text-align: right;" | 354.00 Bbl
Line 171: Line 196:
 
|  
 
|  
 
|-
 
|-
| 2005-0
+
| 2005-A00
 
| Brine
 
| Brine
 
| style="text-align: right;" | 301.00 Bbl
 
| style="text-align: right;" | 301.00 Bbl
Line 177: Line 202:
 
|  
 
|  
 
|-
 
|-
| 2008-0
+
| 2008-A00
 
| Brine
 
| Brine
 
| style="text-align: right;" | 193.00 Bbl
 
| style="text-align: right;" | 193.00 Bbl
Line 183: Line 208:
 
|  
 
|  
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 135.00 Bbl
 
| style="text-align: right;" | 135.00 Bbl
Line 189: Line 214:
 
| 34-007-22038
 
| 34-007-22038
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 195: Line 220:
 
| 34-155-23584
 
| 34-155-23584
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 22.00 Bbl
 
| style="text-align: right;" | 22.00 Bbl
Line 201: Line 226:
 
| 34-099-23127
 
| 34-099-23127
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 36.00 Bbl
 
| style="text-align: right;" | 36.00 Bbl
Line 207: Line 232:
 
| 34-007-22038
 
| 34-007-22038
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 48.00 Bbl
 
| style="text-align: right;" | 48.00 Bbl
Line 213: Line 238:
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
Line 219: Line 244:
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 45.00 Bbl
 
| style="text-align: right;" | 45.00 Bbl
Line 225: Line 250:
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1.00 Bbl
 
| style="text-align: right;" | 1.00 Bbl
Line 250: Line 275:
 
| 1258764
 
| 1258764
 
| Primary Facility
 
| Primary Facility
| 07/29/2003
+
| 2003-07-29
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 257: Line 282:
 
| 1265538
 
| 1265538
 
| Primary Facility
 
| Primary Facility
| 08/29/2003
+
| 2003-08-29
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 264: Line 289:
 
| 1266061
 
| 1266061
 
| Primary Facility
 
| Primary Facility
| 09/02/2003
+
| 2003-09-02
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 271: Line 296:
 
| 1401193
 
| 1401193
 
| Primary Facility
 
| Primary Facility
| 12/08/2004
+
| 2004-12-08
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 306: Line 331:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 18:50, 1 August 2019

Well Details

Well ID: 37-085-23360
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Greene Township
Operator Name: BOBCAT WELL & PIPELINE LLC
Well Pad ID:
Farm/Lease Name: HEIM UNIT 1
License Status: Active
Spud Date: 2003-07-26
Permit Date: 2003-07-21
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.446481
Longitude: -80.385475

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 D & L ENERGY INC 17,915.00 366 149.52 366 0.00 0
2005 D & L ENERGY INC 25,873.00 365 146.67 365 0.00 0
2008 D & L ENERGY INC 9,974.00 366 46.00 365 0.00 0
2010 D & L ENERGY INC 8,229.80 365 0.00 0 0.00 0
2011 D & L ENERGY INC 5,372.90 365 46.73 365 0.00 0
2012 D & L ENERGY INC 3,860.40 365 38.47 365 0.00 0
2013 D & L ENERGY INC 3,576.85 365 50.79 365 0.00 0
2015 BOBCAT WELL & PIPELINE LLC 1,930.56 365 0.00 0 0.00 0
2016 BOBCAT WELL & PIPELINE LLC 509.58 87 0.00 0 0.00 0
2017 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2004-A00 Brine 354.00 Bbl Injection Disposal Well
2005-A00 Brine 301.00 Bbl Injection Disposal Well
2008-A00 Brine 193.00 Bbl
2010-A00 Produced Fluid (in Barrels) 135.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-22038
2010-A00 Produced Fluid (in Barrels) 20.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011-A00 Produced Fluid (in Barrels) 22.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2011-A00 Produced Fluid (in Barrels) 36.00 Bbl INJECTION DISPOSAL WELL 34-007-22038
2012-A00 Produced Fluid (in Barrels) 48.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2013-A00 Produced Fluid (in Barrels) 160.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2013-A00 Produced Fluid (in Barrels) 45.00 Bbl ROAD SPREADING
2017-A00 Produced Fluid (in Barrels) RWC 802 1.00 Bbl INJECTION DISPOSAL WELL 34-007-20919

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1258764 Primary Facility 2003-07-29 Drilling/Alteration No Violations Noted
1265538 Primary Facility 2003-08-29 Drilling/Alteration No Violations Noted
1266061 Primary Facility 2003-09-02 Administrative/File Review No Violations Noted well record review
1401193 Primary Facility 2004-12-08 Complaint Inspection No Violations Noted see CTS for full description of situation.

For data sources see[6]

References