If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-081-21504 | | Well ID: 37-081-21504 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.435072, -77.400772 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Plugged OG Well | | License Status: Plugged OG Well | ||
|- | |- | ||
− | | Spud Date: 01 | + | | Spud Date: 2015-01-16 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2014-08-05 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 98: | Line 123: | ||
| 2295879 | | 2295879 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2014-08-13 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 105: | Line 130: | ||
| 2302931 | | 2302931 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2014-09-04 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 112: | Line 137: | ||
| 2321430 | | 2321430 | ||
| Primary Facility | | Primary Facility | ||
− | | 11 | + | | 2014-11-07 |
| Preoperation Inspection | | Preoperation Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 119: | Line 144: | ||
| 2397419 | | 2397419 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2015-08-11 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 126: | Line 151: | ||
| 2433530 | | 2433530 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2015-12-03 |
| Plugging(Includes Plugged/Mined Through) | | Plugging(Includes Plugged/Mined Through) | ||
| No Violations Noted | | No Violations Noted | ||
Line 175: | Line 200: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-081-21504 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.435072,"lon":-77.400772,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: McHenry Township | |
Operator Name: PA GEN ENERGY CO LLC | |
Well Pad ID: 151614 | |
Farm/Lease Name: SGL 75 PAD A 2728 | |
License Status: Plugged OG Well | |
Spud Date: 2015-01-16 | |
Permit Date: 2014-08-05 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.435072 | |
Longitude: -77.400772 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | PA GEN ENERGY CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2295879 | Primary Facility | 2014-08-13 | Routine/Complete Inspection | No Violations Noted | The purpose of the inspection was to follow-up on a report from the operator that a coal seam was encountered. The access road has been constructed and previously disturbed soils have been seeded and stabilized. Some fair growth was noted at the time of the inspection. The pad site has been cleared and three sedimentation basins have been installed and are functioning properly. The sedimentation basins were essentially filled and were showing signs of erosion on the upslope side. The basins are functioning properly and no other erosion was noted on or downslope of the site. Please monitor the site and address potential E&S concerns as they arise, clearly the site was not designed to remain in this condition over an extended period of time. The construction remains suspended until an overburden analysis can be performed and additional options for construction and mitigation of potential acid-producing rock can be evaluated. In the meantime, the coal seam is not exposed and the site has been temporarily stabilized. |
2302931 | Primary Facility | 2014-09-04 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 9/4/2014. |
2321430 | Primary Facility | 2014-11-07 | Preoperation Inspection | No Violations Noted | Pre-Operational Inspection; 11/7/2014. |
2397419 | Primary Facility | 2015-08-11 | Routine/Complete Inspection | No Violations Noted | |
2433530 | Primary Facility | 2015-12-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Final Plugging Inspection. No Violations noted. |
2708063 | Primary Facility | 2018-03-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | A routine inspection of the SGL 075 Pad A was conducted March 15, 2018. At the time of inspection there were 5 wells on the pad; four are plugged conductors and one is an active conductor awaiting plug and abandonment. The operator has submitted a Notice of Intent to Plug this remaining conductor, the #2731 (081-21507). The four plugged wells all had 2" candy cane vent pipes installed on a conductor cap as the well monument. The remaining active conductor was capped. No obvious issues were observed during this inspection. |
2719881 | Primary Facility | 2018-04-13 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | A routine inspection on the SGL A pad was conducted April 13, 2018 following the plugging of the last remaining active well on the pad; the #2731 well (conductor only). At the time of inspection, the 2731 appeared to be plugged and covered with gravel. There were 4 previously plugged wells on the pad (conductors), all of which had vent monuments installed. No obvious issues were observed with these wells. |
For data sources see[5]