X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-053-27506"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-053-27506
 
| Well ID: 37-053-27506
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.614979, -79.123760 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.614979, -79.123760 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/11/2003
+
| Spud Date: 2003-07-11
 
|-
 
|-
| Permit Date: 2/20/2003
+
| Permit Date: 2003-02-20
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 67: Line 92:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 85: Line 110:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 103: Line 128:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 130: Line 155:
 
| style="text-align: right;" | 120
 
| style="text-align: right;" | 120
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 148: Line 173:
 
| style="text-align: right;" | 108
 
| style="text-align: right;" | 108
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 157: Line 182:
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 166: Line 191:
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 183: Line 208:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 65.29 Bbl
 
| style="text-align: right;" | 65.29 Bbl
Line 189: Line 214:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 11.71 Bbl
 
| style="text-align: right;" | 11.71 Bbl
Line 195: Line 220:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 13.21 Bbl
 
| style="text-align: right;" | 13.21 Bbl
Line 201: Line 226:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2016-0
+
| 2016-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 8.93 Bbl
 
| style="text-align: right;" | 8.93 Bbl
Line 207: Line 232:
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
Line 213: Line 238:
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.38 Bbl
 
| style="text-align: right;" | 15.38 Bbl
Line 219: Line 244:
 
|  
 
|  
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
Line 244: Line 269:
 
| 1222345
 
| 1222345
 
| Primary Facility
 
| Primary Facility
| 03/25/2003
+
| 2003-03-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 251: Line 276:
 
| 1230603
 
| 1230603
 
| Primary Facility
 
| Primary Facility
| 04/23/2003
+
| 2003-04-23
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 258: Line 283:
 
| 1230747
 
| 1230747
 
| Primary Facility
 
| Primary Facility
| 04/25/2003
+
| 2003-04-25
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 265: Line 290:
 
| 1237629
 
| 1237629
 
| Primary Facility
 
| Primary Facility
| 05/15/2003
+
| 2003-05-15
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 272: Line 297:
 
| 1242002
 
| 1242002
 
| Primary Facility
 
| Primary Facility
| 06/05/2003
+
| 2003-06-05
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 279: Line 304:
 
| 1255196
 
| 1255196
 
| Primary Facility
 
| Primary Facility
| 07/22/2003
+
| 2003-07-22
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 286: Line 311:
 
| 1280287
 
| 1280287
 
| Primary Facility
 
| Primary Facility
| 10/21/2003
+
| 2003-10-21
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 305: Line 330:
 
| 344497
 
| 344497
 
| 03/25/2003
 
| 03/25/2003
| 04/22/2003
+
| 2003-03-25
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 313: Line 338:
 
| 348343
 
| 348343
 
| 04/23/2003
 
| 04/23/2003
| 05/03/2004
+
| 2003-04-23
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 321: Line 346:
 
| 351299
 
| 351299
 
| 05/15/2003
 
| 05/15/2003
| 05/03/2004
+
| 2003-05-15
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 329: Line 354:
 
| 353077
 
| 353077
 
| 06/05/2003
 
| 06/05/2003
| 02/25/2013
+
| 2003-06-05
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 337: Line 362:
 
| 369406
 
| 369406
 
| 10/21/2003
 
| 10/21/2003
| 11/05/2003
+
| 2003-10-21
 
| 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution
 
| 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 358: Line 383:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 05/03/2004
+
| 2004-05-03
| 05/03/2004
+
| 2004-05-03
 
| style="text-align: right;" | $3,000.00
 
| style="text-align: right;" | $3,000.00
 
| style="text-align: right;" | $17,000.00
 
| style="text-align: right;" | $17,000.00
Line 367: Line 392:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 05/03/2004
+
| 2004-05-03
| 05/03/2004
+
| 2004-05-03
 
| style="text-align: right;" | $3,000.00
 
| style="text-align: right;" | $3,000.00
 
| style="text-align: right;" | $17,000.00
 
| style="text-align: right;" | $17,000.00
Line 376: Line 401:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 05/03/2004
+
| 2004-05-03
| 05/03/2004
+
| 2004-05-03
 
| style="text-align: right;" | $3,000.00
 
| style="text-align: right;" | $3,000.00
 
| style="text-align: right;" | $17,000.00
 
| style="text-align: right;" | $17,000.00
Line 386: Line 411:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 11/05/2003
+
| 2003-11-05
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 397: Line 422:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 19:35, 2 August 2019

Well Details

Well ID: 37-053-27506
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Howe Township
Operator Name: CAMERON ENERGY CO
Well Pad ID:
Farm/Lease Name: COLLINS 12
License Status: Active
Spud Date: 2003-07-11
Permit Date: 2003-02-20
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.614979
Longitude: -79.123760

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 SYND ENTERPRISES INC 405.79 365 120.50 365 0.00 0
2007 0.00 0 0.00 0 0.00 0
2008 CATALYST ENERGY INC 249.07 365 53.57 365 0.00 0
2009 0.00 0 0.00 0 0.00 0
2010 CATALYST ENERGY INC 657.00 365 43.43 365 0.00 0
2011 CATALYST ENERGY INC 179.50 365 0.00 0 0.00 0
2012 CATALYST ENERGY INC 396.43 366 21.64 366 21.07 366
2014 CATALYST ENERGY INC 16.93 120 9.07 120 0.00 0
2015 0.00 0 0.00 0 0.00 0
2016 CAMERON ENERGY CO 90.43 108 22.28 108 0.00 0
2017 CAMERON ENERGY CO 311.04 270 105.59 270 0.00 0
2018 CAMERON ENERGY CO 384.96 270 105.99 270 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A00 Produced Fluid (in Barrels) 65.29 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011-A00 Produced Fluid (in Barrels) 11.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014-A00 Produced Fluid (in Barrels) 13.21 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016-A00 Produced Fluid (in Barrels) RWC 802 8.93 Bbl REUSE OTHER THAN ROAD SPREADING
2017-A00 Produced Fluid (in Barrels) RWC 802 25.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-A00 Produced Fluid (in Barrels) RWC 802 15.38 Bbl ROAD SPREADING
2018-A00 Produced Fluid (in Barrels) RWC 802 25.00 Bbl REUSE OTHER THAN ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1222345 Primary Facility 2003-03-25 Routine/Complete Inspection Violation(s) Noted
1230603 Primary Facility 2003-04-23 Follow-up Inspection Violation(s) Noted
1230747 Primary Facility 2003-04-25 Compliance Evaluation No Violations Noted
1237629 Primary Facility 2003-05-15 Compliance Evaluation Violation(s) Noted
1242002 Primary Facility 2003-06-05 Compliance Evaluation Violation(s) Noted
1255196 Primary Facility 2003-07-22 Drilling/Alteration No Violations Noted
1280287 Primary Facility 2003-10-21 Routine/Complete Inspection Violation(s) Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1222345 344497 03/25/2003 2003-03-25 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety BMPs not installed
1230603 348343 04/23/2003 2003-04-23 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Inspected to check on condition of road.
1237629 351299 05/15/2003 2003-05-15 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety work suspended because of rain
1242002 353077 06/05/2003 2003-06-05 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety plan not implemented
1280287 369406 10/21/2003 2003-10-21 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution Environmental Health & Safety brine tank not diked

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
344497 120576 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-05-03 2004-05-03 $3,000.00 $17,000.00
348343 120576 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-05-03 2004-05-03 $3,000.00 $17,000.00
351299 120576 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-05-03 2004-05-03 $3,000.00 $17,000.00
369406 128857 NOV - Notice of Violation Comply/Closed 2003-11-05

For data sources see[6]

References