X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-23392"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-23392
 
| Well ID: 37-125-23392
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.236663, -80.411946 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.236663, -80.411946 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 01/03/2009
+
| Spud Date: 2009-01-03
 
|-
 
|-
| Permit Date: 10/24/2008
+
| Permit Date: 2008-10-24
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 174: Line 199:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-2
+
| 2010-A01
| Produced Fluid (in Barrels)
+
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 5,305.00 Bbl
+
| style="text-align: right;" | 55.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2010-A01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 16,940.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
| 34-167-29359
+
|  
 
|-
 
|-
| 2010-2
+
| 2010-A01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 465.00 Bbl
+
| style="text-align: right;" | 5,344.00 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| IDENTIFY METHOD IN COMMENTS
 
|  
 
|  
 
|-
 
|-
| 2010-2
+
| 2010-S01
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 365.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| 34-121-2-3995
 
|-
 
| 2010-3
 
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 55.00 Bbl
+
| style="text-align: right;" | 27.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 16,940.00 Bbl
+
| style="text-align: right;" | 8,470.00 Bbl
 +
| IDENTIFY METHOD IN COMMENTS
 +
|
 +
|-
 +
| 2010-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 2,672.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 
|  
 
|  
 
|-
 
|-
| 2010-3
+
| 2010-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 5,344.00 Bbl
+
| style="text-align: right;" | 5,305.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 +
| 34-167-29359
 +
|-
 +
| 2010-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 465.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2011-1
+
| 2010-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 365.00 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| 34-121-2-3995
 +
|-
 +
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 581.00 Bbl
 
| style="text-align: right;" | 581.00 Bbl
Line 216: Line 259:
 
|  
 
|  
 
|-
 
|-
| 2011-1
+
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,328.00 Bbl
 
| style="text-align: right;" | 1,328.00 Bbl
Line 222: Line 265:
 
| 34-167-29395
 
| 34-167-29395
 
|-
 
|-
| 2011-1
+
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 446.00 Bbl
 
| style="text-align: right;" | 446.00 Bbl
Line 228: Line 271:
 
| 34-121-2-3995
 
| 34-121-2-3995
 
|-
 
|-
| 2011-2
+
| 2011-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 687.00 Bbl
 
| style="text-align: right;" | 687.00 Bbl
Line 234: Line 277:
 
| 34-151-21198
 
| 34-151-21198
 
|-
 
|-
| 2012-1
+
| 2012-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 847.00 Bbl
 
| style="text-align: right;" | 847.00 Bbl
Line 259: Line 302:
 
| 1813444
 
| 1813444
 
| Primary Facility
 
| Primary Facility
| 07/16/2009
+
| 2009-07-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 266: Line 309:
 
| 1880922
 
| 1880922
 
| Primary Facility
 
| Primary Facility
| 03/31/2010
+
| 2010-03-31
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 273: Line 316:
 
| 1882533
 
| 1882533
 
| Primary Facility
 
| Primary Facility
| 04/13/2010
+
| 2010-04-13
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 280: Line 323:
 
| 1882539
 
| 1882539
 
| Primary Facility
 
| Primary Facility
| 04/13/2010
+
| 2010-04-13
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 287: Line 330:
 
| 1886553
 
| 1886553
 
| Primary Facility
 
| Primary Facility
| 04/14/2010
+
| 2010-04-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 294: Line 337:
 
| 1890072
 
| 1890072
 
| Primary Facility
 
| Primary Facility
| 06/02/2010
+
| 2010-06-02
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 301: Line 344:
 
| 1892849
 
| 1892849
 
| Primary Facility
 
| Primary Facility
| 06/09/2010
+
| 2010-06-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 308: Line 351:
 
| 1899828
 
| 1899828
 
| Primary Facility
 
| Primary Facility
| 07/20/2010
+
| 2010-07-20
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 315: Line 358:
 
| 1902088
 
| 1902088
 
| Primary Facility
 
| Primary Facility
| 04/06/2009
+
| 2009-04-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 322: Line 365:
 
| 1915220
 
| 1915220
 
| Primary Facility
 
| Primary Facility
| 08/16/2010
+
| 2010-08-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 329: Line 372:
 
| 2031038
 
| 2031038
 
| Primary Facility
 
| Primary Facility
| 11/01/2011
+
| 2011-11-01
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 336: Line 379:
 
| 2038826
 
| 2038826
 
| Primary Facility
 
| Primary Facility
| 01/12/2012
+
| 2012-01-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 343: Line 386:
 
| 2051420
 
| 2051420
 
| Primary Facility
 
| Primary Facility
| 03/12/2012
+
| 2012-03-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 350: Line 393:
 
| 2063578
 
| 2063578
 
| Primary Facility
 
| Primary Facility
| 03/22/2012
+
| 2012-03-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 357: Line 400:
 
| 2063702
 
| 2063702
 
| Primary Facility
 
| Primary Facility
| 04/04/2012
+
| 2012-04-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 364: Line 407:
 
| 2064380
 
| 2064380
 
| Primary Facility
 
| Primary Facility
| 04/05/2012
+
| 2012-04-05
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 371: Line 414:
 
| 2174719
 
| 2174719
 
| Primary Facility
 
| Primary Facility
| 05/22/2013
+
| 2013-05-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 399: Line 442:
 
| 586145
 
| 586145
 
| 03/31/2010
 
| 03/31/2010
| 07/20/2010
+
| 2010-03-31
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| Administrative
 
| Administrative
Line 407: Line 450:
 
| 586147
 
| 586147
 
| 03/31/2010
 
| 03/31/2010
| 07/20/2010
+
| 2010-03-31
 
| 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan
 
| 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan
 
| Administrative
 
| Administrative
Line 429: Line 472:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 07/20/2010
+
| 2010-07-20
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 437: Line 480:
 
| COA - Consent Order and Agreement
 
| COA - Consent Order and Agreement
 
| Comply/Closed
 
| Comply/Closed
| 11/09/2011
+
| 2011-11-09
| 11/09/2011
+
| 2011-11-09
 
| style="text-align: right;" | $80,000.00
 
| style="text-align: right;" | $80,000.00
 
| style="text-align: right;" | $80,000.00
 
| style="text-align: right;" | $80,000.00
Line 447: Line 490:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 07/20/2010
+
| 2010-07-20
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 455: Line 498:
 
| COA - Consent Order and Agreement
 
| COA - Consent Order and Agreement
 
| Comply/Closed
 
| Comply/Closed
| 11/09/2011
+
| 2011-11-09
| 11/09/2011
+
| 2011-11-09
 
| style="text-align: right;" | $80,000.00
 
| style="text-align: right;" | $80,000.00
 
| style="text-align: right;" | $80,000.00
 
| style="text-align: right;" | $80,000.00
Line 467: Line 510:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 08:41, 3 August 2019

Well Details

Well ID: 37-125-23392
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Hopewell Township
Operator Name: DIVERSIFIED OIL & GAS LLC
Well Pad ID: 148124
Farm/Lease Name: COWDEN 10H
License Status: Active
Spud Date: 2009-01-03
Permit Date: 2008-10-24
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.236663
Longitude: -80.411946

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 0.00 0 0.00 0 0.00 0
2009 0.00 0 0.00 0 0.00 0
2010 ATLAS RESOURCES LLC 248,176.50 231 13,955.50 231 0.00 0
2011 ATLAS RESOURCES LLC 272,257.00 358 8,700.00 358 14,226.17 358
2012 ATLAS RESOURCES LLC 209,028.00 117 3,814.00 117 12,501.00 117
2013 ATLAS RESOURCES LLC 21,790.00 89 0.00 0 22.00 90
2014 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2016 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2017 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2019 DIVERSIFIED OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A01 Fracing Fluid Waste (in Barrels) 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-A01 Fracing Fluid Waste (in Barrels) 16,940.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-A01 Produced Fluid (in Barrels) 5,344.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Fracing Fluid Waste (in Barrels) 27.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-S01 Fracing Fluid Waste (in Barrels) 8,470.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Produced Fluid (in Barrels) 2,672.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S02 Produced Fluid (in Barrels) 5,305.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2010-S02 Produced Fluid (in Barrels) 465.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010-S02 Produced Fluid (in Barrels) 365.00 Bbl STORAGE PENDING DISPOSAL OR REUSE 34-121-2-3995
2011-S01 Produced Fluid (in Barrels) 581.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011-S01 Produced Fluid (in Barrels) 1,328.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-29395
2011-S01 Produced Fluid (in Barrels) 446.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011-S02 Produced Fluid (in Barrels) 687.00 Bbl INJECTION DISPOSAL WELL 34-151-21198
2012-S01 Produced Fluid (in Barrels) 847.00 Bbl INJECTION DISPOSAL WELL 34-151-21198

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1813444 Primary Facility 2009-07-16 Routine/Complete Inspection No Violations Noted
1880922 Primary Facility 2010-03-31 Routine/Complete Inspection Violation(s) Noted 78.57a and 78.54 not in eFacts.
1882533 Primary Facility 2010-04-13 Complaint Inspection No Violations Noted
1882539 Primary Facility 2010-04-13 Complaint Inspection No Violations Noted
1886553 Primary Facility 2010-04-14 Routine/Complete Inspection No Violations Noted
1890072 Primary Facility 2010-06-02 Site Restoration No Violations Noted
1892849 Primary Facility 2010-06-09 Routine/Complete Inspection Outstanding Violations - No Viols Req'd OUTNO viols linked to inspection 1880922
1899828 Primary Facility 2010-07-20 Compliance Evaluation No Violations Noted
1902088 Primary Facility 2009-04-06 Routine/Complete Inspection Outstanding Violations - No Viols Req'd OUTNO viols linked to inspection 1880922, enf # 257309
1915220 Primary Facility 2010-08-16 Routine/Complete Inspection No Violations Noted
2031038 Primary Facility 2011-11-01 Complaint Inspection No Violations Noted
2038826 Primary Facility 2012-01-12 Routine/Complete Inspection No Violations Noted
2051420 Primary Facility 2012-03-12 Routine/Complete Inspection No Violations Noted
2063578 Primary Facility 2012-03-22 Routine/Complete Inspection No Violations Noted
2063702 Primary Facility 2012-04-04 Routine/Complete Inspection No Violations Noted
2064380 Primary Facility 2012-04-05 Routine/Complete Inspection No Violations Noted
2174719 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted
2593728 Primary Facility 2017-05-16 Routine/Complete Inspection No Violations Noted Today I conducted a routine inspection at the Cowden well pad and the following was observed.

Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed. The well heads were painted and maintained no leaks or fluids around well head. The production tanks were not on site. At this time it appears the wells are shut in and not producing.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1880922 586145 03/31/2010 2010-03-31 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative
1880922 586147 03/31/2010 2010-03-31 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
586145 257309 NOV - Notice of Violation Comply/Closed 2010-07-20
586145 276974 COA - Consent Order and Agreement Comply/Closed 2011-11-09 2011-11-09 $80,000.00 $80,000.00
586147 257309 NOV - Notice of Violation Comply/Closed 2010-07-20
586147 276974 COA - Consent Order and Agreement Comply/Closed 2011-11-09 2011-11-09 $80,000.00 $80,000.00

For data sources see[6]

References