X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-139-20764"

m
m
Line 11: Line 11:
 
| County: [[Richland_County,_Ohio|Richland]]
 
| County: [[Richland_County,_Ohio|Richland]]
 
|-
 
|-
| Municipality: [[Jefferson_Township,_Richland_County,_Ohio|Jefferson Township]]
+
| Municipality: [[Jefferson Township,_Richland_County,_Ohio|Jefferson Township]]
 
|-
 
|-
 
| Operator Name: [[BI JOE DEVELOPMENT INC]]
 
| Operator Name: [[BI JOE DEVELOPMENT INC]]

Revision as of 13:18, 12 August 2019

Well Details

Well ID: 34-139-20764
Loading map...
Country: United States
State: Ohio
County: Richland
Municipality: Jefferson Township
Operator Name: BI JOE DEVELOPMENT INC
Well Pad ID:
Farm/Lease Name: BLUE WING
License Status: Final Restoration
License Date: 2014-07-03
Spud Date: 2013-09-20
Spud Drilling Contractor: MARIC DRILLING CO.
Final Drill Date: 2013-09-29
Well Total Depth: 4573 ft
Configuration: Vertical
Latitude: 40.584204262
Longitude: -82.46131569

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-07 Proposed Formations:TRENTON THRU TREMPEALEAU, Issued Date:8/7/2013, Expired Date:8/7/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2013-08-16 CORRECTION TO FOOTAGE
Reached Total Depth 2013-09-29
Completion Report Received 2014-05-12
APP 2014-07-03 Proposed Formations:TREMPEALEAU, Issued Date:7/3/2014, Expired Date:7/2/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2014-07-18
Construction Permit Expires 2016-07-02
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-05-13 4450 4490 26

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-10-07 ACID 15 3150 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 BI JOE DEVELOPMENT INC 0 0 31
2014 BI JOE DEVELOPMENT INC 0 23 31
2015 BI JOE DEVELOPMENT INC 0 0 31
2016 BI JOE DEVELOPMENT INC 0 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 BI JOE DEVELOPMENT INC Brine 0 31
2014 BI JOE DEVELOPMENT INC Brine 345 31
2015 BI JOE DEVELOPMENT INC Brine 0 31
2016 BI JOE DEVELOPMENT INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0053483996 2014-07-16 Plug / Plug Back No Violations Requested by Bakerwell to witness setting the bottom plug in the well. See the plug report for details.
0292204375 2013-10-03 Preliminary Restoration No Violations R&B Enterprises personnel are restoring the well site. The mud pit is closed. Trees are being buried in the cutting pit. The pits were not solidified. Water was hauled out yesterday. There was rain overnight and site conditions are overall muddy.
0516046104 2013-09-21 Drill / Deepen / Reopen No Violations Requested by the operator to witness surface casing cement. See the casing ticket.
0707272165 2013-09-26 Drill / Deepen / Reopen No Violations The bit is being tripped back into the hole following intermediate casing cement. Depth is still at 2650.
1379610567 2013-09-18 Drill / Deepen / Reopen No Violations The site has been constructed. Pits are filled with water. Water checked OK, 112 ppm chloride which is within limits for surface hole drilling. Equipment is being moved from permit 2-0763. Drilling should start Friday, possibly Thursday.
1380117987 2013-09-25 Drill / Deepen / Reopen No Violations Requested by the operator to witness intermediate casing string cement.
1381264408 2013-10-08 Preliminary Restoration No Violations The cutting pit is still partially open. Trees have been piled in the pit and are being buried in the backfill. The well was being completed with rods, tubing, well head and pipe connections by Bakerwell.
1382108452 2013-10-18 Preliminary Restoration No Violations The pits have been closed, the site is graded and resoiled. The well is being pumped into a portable tank on location. The preliminary restoration is approved.
1400078506 2014-05-13 Production Wells No Violations There is a temporary tank at the well. There is a pump jack on the well. The well is being pumped to the temporary tank. No ID at the well. The lease road and well site are eroding. Vegetation failed to establish on portions of the site and the road has no surface material on it. The operator was contacted and stated they would take care of it.
1406059610 2014-07-18 Plug / Plug Back No Violations The operator requested inspection to witness plugging the well to surface. See the plug report for details.
1410530235 2014-09-11 Final Restoration No Violations The operator supplied a landowner waiver allowing the road and well pad to remain. The operator has established vegetation on the site and installed water bars on the access road. The final restoration is approved.
1459872067 2014-07-02 Production Wells No Violations The temporary tank has been removed from the location. The operator is going to plug the well.
1787106971 2013-09-24 Drill / Deepen / Reopen No Violations Drilling at 2410 feet. The intermediate string is anticipated to be set in 24 hours.
1840801381 2013-10-02 Preliminary Restoration No Violations Mac Oil water trucks are on site pumping pit water. Water is being hauled to one of Macs disposal wells. The cutting pit is nearly dewatered. The well has been equipped with a well head. R&B Enterprises has a hoe on site taking up the pad.
1880364626 2014-08-18 Final Restoration No Violations The operator submitted a landowner waiver for the location. The access road and well pad are to be left for the landowner. The operator is responsible for installing water controls on the access road and the landowner is going to seed the location. The landowner wants to remove additional trees from his property using the access road prior to constructing water bars.
1935650210 2013-09-30 Drill / Deepen / Reopen No Violations The 4.5 inch was cemented in the well on 9/29/13. The 7 inch above the cement is being pulled. Equipment is being removed from the location.

For data sources see[9]

References