If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Knox_County,_Ohio|Knox]] | | County: [[Knox_County,_Ohio|Knox]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Pleasant Township,_Knox_County,_Ohio|Pleasant Township]] |
|- | |- | ||
| Operator Name: [[MASON DRILLING INC]] | | Operator Name: [[MASON DRILLING INC]] |
Well ID: 34-083-24386 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.33926713,"lon":-82.43471655,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Pleasant Township | |
Operator Name: MASON DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: LITT | |
License Status: Producing | |
License Date: 2008-07-16 | |
Spud Date: 2008-11-01 | |
Spud Drilling Contractor: H & D DRILLING | |
Final Drill Date: 2008-11-13 | |
Well Total Depth: 2599 ft | |
Configuration: Vertical | |
Latitude: 40.339267130 | |
Longitude: -82.43471655 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-07-16 | Proposed Formations:CLINTON, Issued Date:7/16/2008, Expired Date:7/16/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-11-13 | |
Completion Report Received | 2009-02-26 | |
Construction Permit Expires | 2009-07-16 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-05-14 | 2500 | 2520 | 41 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 32000 Gal | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | MASON DRILLING INC | 3297 | 0 | 310 |
2010 | MASON DRILLING INC | 5677 | 0 | 365 |
2011 | MASON DRILLING INC | 5876 | 0 | 365 |
2012 | MASON DRILLING INC | 4402 | 0 | 366 |
2013 | MASON DRILLING INC | 2662 | 0 | 365 |
2014 | MASON DRILLING INC | 2469 | 0 | 365 |
2015 | MASON DRILLING INC | 1844 | 0 | 365 |
2016 | MASON DRILLING INC | 1987 | 0 | 365 |
2017 | MASON DRILLING INC | 1330 | 0 | 365 |
2018 | MASON DRILLING INC | 1178 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | MASON DRILLING INC | Brine | 205 | 310 |
2010 | MASON DRILLING INC | Brine | 70 | 365 |
2011 | MASON DRILLING INC | Brine | 65 | 365 |
2012 | MASON DRILLING INC | Brine | 0 | 366 |
2013 | MASON DRILLING INC | Brine | 0 | 365 |
2014 | MASON DRILLING INC | Brine | 85 | 365 |
2015 | MASON DRILLING INC | Brine | 0 | 365 |
2016 | MASON DRILLING INC | Brine | 0 | 365 |
2017 | MASON DRILLING INC | Brine | 0 | 365 |
2018 | MASON DRILLING INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0963880832 | 2013-07-11 | Preliminary Restoration | No Violations | Well is capable of production. Well is equipt with a motor and a pumping unit. All drilling equiptment has been removed and pits are filled. Vegetation from current crop season is present at well site. The tank battery consists of one 100 barrel tank surrounded by an earthen dike. Identification can be found at the tank battery. Restoration passes. |
1226089603 | 2008-11-07 | Drill / Deepen / Reopen | No Violations | Witnessed cementing of surface casing. Pits inspected and were properly lined. Spoke with landowner Mr. Litt while on site. |
For data sources see[9]