If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Lake_County,_Ohio|Lake]] | | County: [[Lake_County,_Ohio|Lake]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Eastlake City,_Lake_County,_Ohio|Eastlake City]] |
|- | |- | ||
| Operator Name: [[PETRO EVALUATION SERV INC]] | | Operator Name: [[PETRO EVALUATION SERV INC]] |
Well ID: 34-085-21297 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.669090863,"lon":-81.43189543,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Lake | |
Municipality: Eastlake City | |
Operator Name: PETRO EVALUATION SERV INC | |
Well Pad ID: | |
Farm/Lease Name: WILLOUGHBY WATER | |
License Status: Producing | |
License Date: 2009-05-28 | |
Spud Date: 2009-07-16 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2009-07-26 | |
Well Total Depth: 3090 ft | |
Configuration: Vertical | |
Latitude: 41.669090863 | |
Longitude: -81.43189543 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-05-28 | Proposed Formations:DEVONIAN SHALE THRU CLINTON, Issued Date:5/28/2009, Expired Date:5/28/2010 6:00:00 AM, Drilling unit acres:35.73, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-07-26 | |
Completion Report Received | 2010-02-17 | |
Construction Permit Expires | 2010-05-28 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-05-17 | 2914 | 2924 | 19 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1200 Bbl | 30000 | TREATMENT AND RESERVOIR PRESSURES WERE NOT REPORTED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | PETRO EVALUATION SERV INC | 1829 | 23 | 320 |
2010 | PETRO EVALUATION SERV INC | 10100 | 97 | 365 |
2011 | PETRO EVALUATION SERV INC | 4718 | 40 | 365 |
2012 | PETRO EVALUATION SERV INC | 3436 | 95 | 366 |
2013 | PETRO EVALUATION SERV INC | 2608 | 56 | 365 |
2014 | PETRO EVALUATION SERV INC | 1633 | 0 | 365 |
2015 | PETRO EVALUATION SERV INC | 950 | 63 | 365 |
2016 | PETRO EVALUATION SERV INC | 1593 | 0 | 365 |
2017 | PETRO EVALUATION SERV INC | 1991 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | PETRO EVALUATION SERV INC | Brine | 28 | 320 |
2010 | PETRO EVALUATION SERV INC | Brine | 559 | 365 |
2011 | PETRO EVALUATION SERV INC | Brine | 281 | 365 |
2012 | PETRO EVALUATION SERV INC | Brine | 283 | 366 |
2013 | PETRO EVALUATION SERV INC | Brine | 278 | 365 |
2014 | PETRO EVALUATION SERV INC | Brine | 210 | 365 |
2015 | PETRO EVALUATION SERV INC | Brine | 70 | 365 |
2016 | PETRO EVALUATION SERV INC | Brine | 0 | 365 |
2017 | PETRO EVALUATION SERV INC | Brine | 210 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0314999782 | 2009-07-22 | Drill / Deepen / Reopen | No Violations | rig drilling 1275 in complance. |
0414936960 | 2009-09-16 | Preliminary Restoration | No Violations | Pits were properly closed. Site conditions were satisfactory. |
0432469058 | 2009-07-23 | Drill / Deepen / Reopen | No Violations | inspected site no Violation. |
0832537890 | 2009-07-20 | Drill / Deepen / Reopen | No Violations | setting surface 8 5/8 |
0952082007 | 2015-02-25 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The wellhead and battery are located along the west banks of the Chagrin River in a mostly industrial area of Eastlake. The wellhead pump jack and battery are in separate board-on-board enclosures. The gates are locked. Load lines are secure. Fittings and connections at the wellhead and battery are secure. 12 to 15 inches of snow cover obscures some surficial features and areas. |
1023024896 | 2012-03-14 | UrbanProduction Wells | No Violations | The well is equipped with a pumping unitand the annulus needs opened or a pop-off valve installed. The tank battery is equipped with two 100 barrel production tanks, one poly brine tank and a mechanical separator. The load line needs a plug. The dike needs repaired where the flow line comes into it. The man doors were locked. |
1312289714 | 2011-08-02 | UrbanProduction Wells | Violations Noted | Fencing, dike, and spacing in compliance. Vent hatches installed and closed. Feed lines are bullplugged. Lightning arrestor and charcoal filter not installed. Gate at tank battery is not locked. Contacted John Braun of Petro Evaluation (440) 862-0492 regarding the issues. He stated he would contact the office and take care of the issues. |
1383074930 | 2013-10-29 | UrbanProduction Wells | No Violations | Addition of process safety equipment has been completed. No further problems or action needed at this time. |
1982727777 | 2010-01-21 | Production Wells | No Violations | There were no violations at the time of inspection. |
2132612348 | 2012-10-04 | UrbanProduction Wells | No Violations | The unit consists of a 2-tank battery with mechanical separator enclosed in a 8-foot board fence. The spacing is in accordance with the rule, and the valving and mechanicals are in good repair. I did not observe any signs of leaking product or gas vapors. The wellhead is fitted with a pump jack and is located in a separate gated 8-foot board enclosure. The gates on the enclosures are locked. The tank battery dike is adequate. No violations noted. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1312289714 | US-OH-108853 | 2011-08-02 | LOCKS | |
1312289714 | US-OH-108854 | 2011-08-02 | General Safety |
For data sources see[9]