X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24275"

m
m
Line 11: Line 11:
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
|-
 
|-
| Municipality: [[Wayne_Township,_Monroe_County,_Ohio|Wayne Township]]
+
| Municipality: [[Wayne Township,_Monroe_County,_Ohio|Wayne Township]]
 
|-
 
|-
 
| Operator Name: [[WEISS DRILLING INC]]
 
| Operator Name: [[WEISS DRILLING INC]]

Revision as of 05:07, 13 August 2019

Well Details

Well ID: 34-111-24275
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Wayne Township
Operator Name: WEISS DRILLING INC
Well Pad ID:
Farm/Lease Name: SMITH BERNARD C
License Status: Final Restoration
License Date: 2015-10-01
Spud Date: 2010-07-12
Spud Drilling Contractor: R WOLFE DRLG
Final Drill Date: 2010-07-14
Well Total Depth: 1999 ft
Configuration: Vertical
Latitude: 39.742120742
Longitude: -81.23623609

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-05-28 Proposed Formations:BEREA/KEENER, Issued Date:5/28/2010, Expired Date:5/28/2011 6:00:00 AM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-07-14
Completion Report Received 2010-10-12
APP 2015-10-01 Proposed Formations:BEREA & KEENER SAND, Issued Date:10/1/2015, Expired Date:9/30/2017 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2016-01-27
Construction Permit Expires 2017-09-30
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-12-10 1342 1375 20
2010-12-10 1916 1921 16

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-09-21 H2O 0 1250 Bbl 35000 Universal Well Services Inc. STAGE 1 OF 2
2010-09-21 ACID 15 850 Gal 0 Universal Well Services Inc. STAGE 2 OF 2..FRAC PLUG @ 1382'

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 WEISS DRILLING INC 567 182 99
2011 WEISS DRILLING INC 2203 295 365
2012 WEISS DRILLING INC 1676 163 366
2013 WEISS DRILLING INC 1222 80 365
2014 WEISS DRILLING INC 911 163 365
2015 WEISS DRILLING INC 643 82 365
2016 WEISS DRILLING INC 0 0 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 WEISS DRILLING INC Brine 1681 99
2011 WEISS DRILLING INC Brine 375 365
2012 WEISS DRILLING INC Brine 150 366
2013 WEISS DRILLING INC Brine 721 365
2014 WEISS DRILLING INC Brine 773 365
2015 WEISS DRILLING INC Brine 687 365
2016 WEISS DRILLING INC Brine 53 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0692732807 2010-09-21 Completion Testing No Violations On day of inspection met w/ Larry Weiss at site.Frac crew was just coming in .I did not witness this frac job.
0801554487 2010-07-13 Drill / Deepen / Reopen No Violations On day of inspection Wolfe was getting to run in production string for well. Universal was in to cement the casing in. There was 1999 of 6 1/4open hole. They than ran 1988 of 4.5 casing. The well was drilled to the Berea.
1282071229 2010-08-16 Drill / Deepen / Reopen No Violations Owner called me and wanted me to look at tanks before they plumbed the tanks in. Well still is not fractured.
1454018800 2016-01-27 Plug / Plug Back No Violations Honey Run Oil and Gas was the plugging contractor. Formation Cementing set a bottom hole plug from 1955 to 1700. Then, Formation placed a class A 1% gel plug from 1425 to 1225. Jet Wireline services cut the casing at 720. A 200 plug was placed from 700 to 500 covering the base of the surface casing. Finally, a 32 sack 15.2 pound per gallon 1.26 cubic foot per sack yield cement plug was placed to surface.
1971617258 2016-06-30 Final Restoration No Violations The well site meets ORC 1509.072.
2050360005 2010-07-12 Drill / Deepen / Reopen No Violations On day of inspection Wolfe drilling was in to drill well. They were running 7casing in for surface job. Good circulation.

For data sources see[9]

References