| County: [[Monroe_County,_Ohio|Monroe]] | | County: [[Monroe_County,_Ohio|Monroe]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Adams Township,_Monroe_County,_Ohio|Adams Township]] |
|- | |- | ||
| Operator Name: [[ECLIPSE RESOURCES I LP]] | | Operator Name: [[ECLIPSE RESOURCES I LP]] |
Well ID: 34-111-24799 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.745615456,"lon":-80.98962404,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Adams Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001512 | |
Farm/Lease Name: YELLOW ROSE A | |
License Status: Producing | |
License Date: 2017-10-24 | |
Spud Date: 2017-11-13 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2018-02-03 | |
Well Total Depth: 29744 ft | |
Configuration: Horizontal | |
Latitude: 39.745615456 | |
Longitude: -80.98962404 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-10-24 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/24/2017, Expired Date:10/24/2019 12:00:00 PM, Drilling unit acres:334.139, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2018-01-12 | CHANGE TO UNIT SIZE AND TARGET INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Reached Total Depth | 2018-02-03 | |
Correction to Well | 2018-03-30 | UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED PLAT |
Completion Report Received | 2018-10-31 | |
Record Last Modified | 2018-11-02 | |
Correction to Well | 2018-11-09 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Construction Permit Expires | 2019-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-11-01 | 10610 | 10760 | 0 |
2018-11-01 | 29472 | 29570 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/25/2018 | 08/02/2018 | 10452 | 42,496,000.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
PROP-CERAMIC-30/50, BULK (101297495) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2814 | One AquaSource Inc. | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2816 | One AquaSource Inc. | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
OILPERM A | Halliburton | Non-ionic Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-9601 | One AquaSource Inc. | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Crystalline silica, cristobalite | 14464-46-1 | 30 | 0.0703314 | 282450 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-, branched | 127087-87-0 | 5 | 0.00001781 | 72 | ||||
Mullite | 1302-93-8 | 100 | 0.234438 | 941500 | ||||
Organic phosphate copolymer | 71050-62-9 | 25 | 0.00314195 | 12619 | ||||
Methanol | 67-56-1 | 60 | 0.000210344 | 845 | ||||
Silica, amorphous - fumed | 7631-86-9 | 30 | 0.0703314 | 282450 | ||||
Naphthalene | 91-20-3 | 5 | 0.00001781 | 72 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.069689 | 279870 | ||||
Ammonium chloride | 12125-02-9 | 1.5 | 0.000801199 | 3218 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000105172 | 423 | ||||
Ethanol | 64-17-5 | 60 | 0.000213751 | 859 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000105172 | 423 | ||||
Citric acid | 77-92-9 | 60 | 0.00146617 | 5889 | ||||
Dazomet | 533-74-4 | 24 | 0.00536604 | 21550 | ||||
Oxyalkylated phenolic resin | Proprietary | 30 | 0.0001425 | 574 | ||||
Sodium hydroxide | 1310-62-9 | 4 | 0.00089434 | 3592 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000105172 | 423 | ||||
Ammonium persulfate | 7727-54-0 | 95 | 0.00125847 | 5054 | ||||
Aluminum Silicate | 1302-76-7 | 100 | 0.234438 | 941500 | ||||
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.000106875 | 430 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.4186 | 41,840,900.0 | ||||
Poly (oxy-1, 2-etanediyl), a-tridecyl-w-hydroxy-, branched | 69011-36-5 | 5 | 0.000935734 | 3758 | ||||
Distillates (petroleum, hydrotreated light) | 64742-47-8 | 20 | 0.0133573 | 53644 | ||||
Olefins | Proprietary | 5 | 0.00004207 | 172 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00003506 | 141 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000356 | 15 | ||||
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.466059 | 1,871,690.0 | |
HP-2220 | One AquaSource Inc. | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 80.3695 | 322,763,000.0 | |
Water | 7732-18-5 | 100 | 8.40137 | 33,739,800.0 | ||||
MB-7530 | One AquaSource Inc. | Biocide | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-05-25 | H2O | 15 | 425601 Gal | 449690 | Halliburton | STAGE 1/95
STAGES 2-94 SEE IMAGES |
2018-08-01 | H2O | 15 | 376289 Gal | 456535 | Halliburton | STAGE 95/95
STAGES 2-94 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | 4552617 | 0 | 112 |
2019 | ECLIPSE RESOURCES I LP | 2157554 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | Brine | 104697 | 112 |
2019 | ECLIPSE RESOURCES I LP | Brine | 35455 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0452752680 | 2018-07-30 | Completion Testing | No Violations | Status check inspection on the current well completion process found Halliburton pressure pumping service on location on location. Currently 94 out of 95 proposed stages to be completed have been stimulated. Nine Energy wireline service is on location. Annular pressure monitoring is in place between the 9.625 and 5.5 casing strings. All stimulation support equipment is situated on polymer liner. |
0700415222 | 2017-11-27 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness the cementing of the 20 inch diameter conductor and the 16 inch diameter mouse hole casing. A 24 inch diameter conductor cemented to surface was in place. During the process of drilling the 22 inch diameter mouse hole the auger bit punctured the side of the 24 inch diameter conductor at 64 feet in depth leaving a hole in the wall of the conductor. Precision Drilling ran a 20 inch diameter conductor to a depth of 104 feet within the 24 inch diameter conductor. A 16 inch diameter mouse hole casing was ran to 68 feet in depth. Pre-job safety meeting was held with all personnel on location including Precision Rathole, Stingray cement crew, and Eclipse. Stingray Cementing hooked up to the 20 inch conductor and pumped fresh water to circulate the hole and the fresh water reached the surface from the mouse hole and the conductor simultaneously indicating that there was a direct line of communication between the two boreholes. Stingray pumped 10 barrels of water, 243 sacks of Class A cement at 15.6ppg, and displaced with 34bbl fresh water. 18 barrels of cement returns were witnessed in the cellar. The annulus of the conductor and the mouse hole were both cemented to surface by pumping through the 20 inch diameter conductor. |
0902136439 | 2018-05-17 | Completion Testing | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. |
1332232794 | 2018-05-17 | Completion Testing | No Violations | Status check inspection found the well drilling process is complete and the well has the completion well head installed and has also had the 5.5 production string toe prep procedure and final pressure test conducted. The well is awaiting the start of the stimulation process in the next 10 days, Halliburton completion service will mobilize and begin. All completion equipment will be placed on polymer containment. All surface water created on the well pad due to the recent rain events is being removed by the means a vacuum truck. The perimeter drain valves are closed. |
1352261395 | 2018-11-28 | Production Wells | No Violations | Status check inspection found 4 wells are present on the pad and all 4 wells are now in production. The said well is equipped with a lower A and upper B section with annular pressure monitoring in place on both well head sections. No annular pressure was found on this day on the A or B well head section. The well is producing off the 5.5 diameter production casing through (2) 3.5 diameter flow lines with both flow line valves open. The 5.5 casing pressure is 5,263 pounds per square inch (psi) and the flow line pressures are 1,400 psi and 1,500 psi. There is one manual master 7.0625 completion valve still on the well head B section that the well is being produced through. Each of the (2) flow lines has a separate glycol heater and downstream from the Glycol heater is a contact tower and B-Tex Condenser followed by third party mid stream Eureka Hunter pipeline station point. Also on location is a production fluid facility that consists of (6) 400 barrel production tanks situated inside a polymer lined steel containment dike area. Proper well identification is posted and hazard warning labeling is present at the production facility. Signage is posted at the well pad entry point and the well pad perimeter is protected by an earthen berm. |
1422104840 | 2018-01-02 | Production Wells | No Violations | On site inspection to witness the surface casing cement job with H&P Drilling rig 608 on location and Schlumberger cement service. The rig has drilled a 17.5 diameter surface borehole to a measured depth of 1,797 off of a drilling rig Kelly Bushing heigth of 27 above ground level. The rig then cleaned the borehole up and pulled the drill string. They then proceeded to insert 1,747 of 13.375 diameter J- |
1516200261 | 2018-01-17 | Drill / Deepen / Reopen | No Violations | |
1566717453 | 2018-07-30 | Completion Testing | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. We are onsite witnessing Halliburton, 9 Energy, and S3 Pump Service conducting hydraulic fracturing operations. This particular well has 1 stage remaining, of 95 total stages. |
1690234680 | 2018-01-03 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness 1751 feet of 13.375 inch diameter surface casing being cemented into a 17.5 inch diameter. Schlumberger pressure tested their lines and pumped 280 barrels of fresh water, 20 barrels of 6% gel, 10 barrels of fresh water, and 286 barrels of class A cement weighing 15.6 pounds per gallon. A cement sampled was pulled and weighed in pressurized scales confirming the weight of 15.6 pounds per gallon. The top plug was dropped and 262 barrels of fresh water were pumped for displacement. At 200 barrels within displacement cement retuned to surface. |
1736874224 | 2018-08-16 | Completion Testing | No Violations | Status check inspection on the well completion process found the well drilling and completion process now complete and a tubing snubbing unit owned by Deep Well Services rigged up on the well drilling out the 98 completion plugs set in the well during stimulation. The well was stimulated in 99 stages and the snubbing unit is drilling out stage 28. The well head assembly consists of a lower A and upper B section with a production flow cross present. Atop the flow cross is 2 FMC manually operated 7.0625 diameter master valves. Atop the master valves is a completion blow out preventer (BOP) owned by KLX. Atop the BOP is the snubbing unit. All completion equipment working pressure is 15,000 pound per square inch rated. No production tubing will be hung in the well bore at this time. All completion and support equipment is situated on polymer containment. No wells are being produced while the completion plugs are being drilled out. All well pad perimeter drain valves are closed and any surface water created on the pad is being hauled off as precautionary measures. 4 wells are present on the pad and crews are on site completing the installation of the production equipment. |
For data sources see[10]