Difference between revisions of "34-111-24799"

m
m
Line 11: Line 11:
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
|-
 
|-
| Municipality: [[Adams_Township,_Monroe_County,_Ohio|Adams Township]]
+
| Municipality: [[Adams Township,_Monroe_County,_Ohio|Adams Township]]
 
|-
 
|-
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]

Revision as of 05:10, 13 August 2019

Well Details

Well ID: 34-111-24799
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Adams Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001512
Farm/Lease Name: YELLOW ROSE A
License Status: Producing
License Date: 2017-10-24
Spud Date: 2017-11-13
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-02-03
Well Total Depth: 29744 ft
Configuration: Horizontal
Latitude: 39.745615456
Longitude: -80.98962404

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-10-24 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/24/2017, Expired Date:10/24/2019 12:00:00 PM, Drilling unit acres:334.139, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2018-01-12 CHANGE TO UNIT SIZE AND TARGET INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Reached Total Depth 2018-02-03
Correction to Well 2018-03-30 UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED PLAT
Completion Report Received 2018-10-31
Record Last Modified 2018-11-02
Correction to Well 2018-11-09 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Construction Permit Expires 2019-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-11-01 10610 10760 0
2018-11-01 29472 29570 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/25/2018 08/02/2018 10452 42,496,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
PROP-CERAMIC-30/50, BULK (101297495) Halliburton Proppant Listed Below Listed Below 0 0 0
HP-2814 One AquaSource Inc. Friction Reducer Listed Below Listed Below 0 0 0
HP-2816 One AquaSource Inc. Friction Reducer Listed Below Listed Below 0 0 0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
HP-9601 One AquaSource Inc. Additive Listed Below Listed Below 0 0 0
Crystalline silica, cristobalite 14464-46-1 30 0.0703314 282450
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-, branched 127087-87-0 5 0.00001781 72
Mullite 1302-93-8 100 0.234438 941500
Organic phosphate copolymer 71050-62-9 25 0.00314195 12619
Methanol 67-56-1 60 0.000210344 845
Silica, amorphous - fumed 7631-86-9 30 0.0703314 282450
Naphthalene 91-20-3 5 0.00001781 72
Hydrochloric acid 7647-01-0 15 0.069689 279870
Ammonium chloride 12125-02-9 1.5 0.000801199 3218
Ethoxylated alcohols Proprietary 30 0.000105172 423
Ethanol 64-17-5 60 0.000213751 859
Fatty acids, tall oil Proprietary 30 0.000105172 423
Citric acid 77-92-9 60 0.00146617 5889
Dazomet 533-74-4 24 0.00536604 21550
Oxyalkylated phenolic resin Proprietary 30 0.0001425 574
Sodium hydroxide 1310-62-9 4 0.00089434 3592
Modified thiourea polymer Proprietary 30 0.000105172 423
Ammonium persulfate 7727-54-0 95 0.00125847 5054
Aluminum Silicate 1302-76-7 100 0.234438 941500
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000106875 430
Crystalline silica, quartz 14808-60-7 100 10.4186 41,840,900.0
Poly (oxy-1, 2-etanediyl), a-tridecyl-w-hydroxy-, branched 69011-36-5 5 0.000935734 3758
Distillates (petroleum, hydrotreated light) 64742-47-8 20 0.0133573 53644
Olefins Proprietary 5 0.00004207 172
Propargyl alcohol 107-19-7 10 0.00003506 141
1,2,4 Trimethylbenzene 95-63-6 1 0.00000356 15
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.466059 1,871,690.0
HP-2220 One AquaSource Inc. Scale Inhibitor Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 80.3695 322,763,000.0
Water 7732-18-5 100 8.40137 33,739,800.0
MB-7530 One AquaSource Inc. Biocide Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-05-25 H2O 15 425601 Gal 449690 Halliburton STAGE 1/95

STAGES 2-94 SEE IMAGES

2018-08-01 H2O 15 376289 Gal 456535 Halliburton STAGE 95/95

STAGES 2-94 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP 4552617 0 112
2019 ECLIPSE RESOURCES I LP 2157554 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP Brine 104697 112
2019 ECLIPSE RESOURCES I LP Brine 35455 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0452752680 2018-07-30 Completion Testing No Violations Status check inspection on the current well completion process found Halliburton pressure pumping service on location on location. Currently 94 out of 95 proposed stages to be completed have been stimulated. Nine Energy wireline service is on location. Annular pressure monitoring is in place between the 9.625 and 5.5 casing strings. All stimulation support equipment is situated on polymer liner.
0700415222 2017-11-27 Casing String Witnessed No Violations The purpose of my inspection was to witness the cementing of the 20 inch diameter conductor and the 16 inch diameter mouse hole casing. A 24 inch diameter conductor cemented to surface was in place. During the process of drilling the 22 inch diameter mouse hole the auger bit punctured the side of the 24 inch diameter conductor at 64 feet in depth leaving a hole in the wall of the conductor. Precision Drilling ran a 20 inch diameter conductor to a depth of 104 feet within the 24 inch diameter conductor. A 16 inch diameter mouse hole casing was ran to 68 feet in depth. Pre-job safety meeting was held with all personnel on location including Precision Rathole, Stingray cement crew, and Eclipse. Stingray Cementing hooked up to the 20 inch conductor and pumped fresh water to circulate the hole and the fresh water reached the surface from the mouse hole and the conductor simultaneously indicating that there was a direct line of communication between the two boreholes. Stingray pumped 10 barrels of water, 243 sacks of Class A cement at 15.6ppg, and displaced with 34bbl fresh water. 18 barrels of cement returns were witnessed in the cellar. The annulus of the conductor and the mouse hole were both cemented to surface by pumping through the 20 inch diameter conductor.
0902136439 2018-05-17 Completion Testing No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report.
1332232794 2018-05-17 Completion Testing No Violations Status check inspection found the well drilling process is complete and the well has the completion well head installed and has also had the 5.5 production string toe prep procedure and final pressure test conducted. The well is awaiting the start of the stimulation process in the next 10 days, Halliburton completion service will mobilize and begin. All completion equipment will be placed on polymer containment. All surface water created on the well pad due to the recent rain events is being removed by the means a vacuum truck. The perimeter drain valves are closed.
1352261395 2018-11-28 Production Wells No Violations Status check inspection found 4 wells are present on the pad and all 4 wells are now in production. The said well is equipped with a lower A and upper B section with annular pressure monitoring in place on both well head sections. No annular pressure was found on this day on the A or B well head section. The well is producing off the 5.5 diameter production casing through (2) 3.5 diameter flow lines with both flow line valves open. The 5.5 casing pressure is 5,263 pounds per square inch (psi) and the flow line pressures are 1,400 psi and 1,500 psi. There is one manual master 7.0625 completion valve still on the well head B section that the well is being produced through. Each of the (2) flow lines has a separate glycol heater and downstream from the Glycol heater is a contact tower and B-Tex Condenser followed by third party mid stream Eureka Hunter pipeline station point. Also on location is a production fluid facility that consists of (6) 400 barrel production tanks situated inside a polymer lined steel containment dike area. Proper well identification is posted and hazard warning labeling is present at the production facility. Signage is posted at the well pad entry point and the well pad perimeter is protected by an earthen berm.
1422104840 2018-01-02 Production Wells No Violations On site inspection to witness the surface casing cement job with H&P Drilling rig 608 on location and Schlumberger cement service. The rig has drilled a 17.5 diameter surface borehole to a measured depth of 1,797 off of a drilling rig Kelly Bushing heigth of 27 above ground level. The rig then cleaned the borehole up and pulled the drill string. They then proceeded to insert 1,747 of 13.375 diameter J-
1516200261 2018-01-17 Drill / Deepen / Reopen No Violations
1566717453 2018-07-30 Completion Testing No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. We are onsite witnessing Halliburton, 9 Energy, and S3 Pump Service conducting hydraulic fracturing operations. This particular well has 1 stage remaining, of 95 total stages.
1690234680 2018-01-03 Casing String Witnessed No Violations The purpose of my inspection was to witness 1751 feet of 13.375 inch diameter surface casing being cemented into a 17.5 inch diameter. Schlumberger pressure tested their lines and pumped 280 barrels of fresh water, 20 barrels of 6% gel, 10 barrels of fresh water, and 286 barrels of class A cement weighing 15.6 pounds per gallon. A cement sampled was pulled and weighed in pressurized scales confirming the weight of 15.6 pounds per gallon. The top plug was dropped and 262 barrels of fresh water were pumped for displacement. At 200 barrels within displacement cement retuned to surface.
1736874224 2018-08-16 Completion Testing No Violations Status check inspection on the well completion process found the well drilling and completion process now complete and a tubing snubbing unit owned by Deep Well Services rigged up on the well drilling out the 98 completion plugs set in the well during stimulation. The well was stimulated in 99 stages and the snubbing unit is drilling out stage 28. The well head assembly consists of a lower A and upper B section with a production flow cross present. Atop the flow cross is 2 FMC manually operated 7.0625 diameter master valves. Atop the master valves is a completion blow out preventer (BOP) owned by KLX. Atop the BOP is the snubbing unit. All completion equipment working pressure is 15,000 pound per square inch rated. No production tubing will be hung in the well bore at this time. All completion and support equipment is situated on polymer containment. No wells are being produced while the completion plugs are being drilled out. All well pad perimeter drain valves are closed and any surface water created on the pad is being hauled off as precautionary measures. 4 wells are present on the pad and crews are on site completing the installation of the production equipment.

For data sources see[10]