X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-151-25658"

m
m
Line 11: Line 11:
 
| County: [[Stark_County,_Ohio|Stark]]
 
| County: [[Stark_County,_Ohio|Stark]]
 
|-
 
|-
| Municipality: [[Washington_Township,_Stark_County,_Ohio|Washington Township]]
+
| Municipality: [[Washington Township,_Stark_County,_Ohio|Washington Township]]
 
|-
 
|-
 
| Operator Name: [[C & T ENERGY OF EAST CANTON IN]]
 
| Operator Name: [[C & T ENERGY OF EAST CANTON IN]]

Revision as of 08:50, 13 August 2019

Well Details

Well ID: 34-151-25658
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Washington Township
Operator Name: C & T ENERGY OF EAST CANTON IN
Well Pad ID:
Farm/Lease Name: WILLIAMSON UNIT
License Status: Producing
License Date: 2008-11-12
Spud Date: 2008-11-18
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 2008-11-23
Well Total Depth: 5422 ft
Configuration: Vertical
Latitude: 40.881906269
Longitude: -81.11330314

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-11-12 Proposed Formations:CLINTON, Issued Date:11/12/2008, Expired Date:11/12/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-11-23
Completion Report Received 2009-06-05
Construction Permit Expires 2009-11-12
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-09-22 5228 5299 50

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 206000 Gal 100000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 C & T ENERGY OF EAST CANTON IN 1489 121 184
2010 C & T ENERGY OF EAST CANTON IN 2890 178 365
2011 C & T ENERGY OF EAST CANTON IN 2488 90 0
2012 C & T ENERGY OF EAST CANTON IN 2455 0 366
2013 C & T ENERGY OF EAST CANTON IN 2180 100 365
2014 C & T ENERGY OF EAST CANTON IN 2514 0 365
2015 C & T ENERGY OF EAST CANTON IN 2546 105 365
2016 C & T ENERGY OF EAST CANTON IN 2754 41 365
2017 C & T ENERGY OF EAST CANTON IN 2514 59 365
2018 C & T ENERGY OF EAST CANTON IN 2891 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 C & T ENERGY OF EAST CANTON IN Brine 770 184
2010 C & T ENERGY OF EAST CANTON IN Brine 420 365
2011 C & T ENERGY OF EAST CANTON IN Brine 140
2012 C & T ENERGY OF EAST CANTON IN Brine 210 366
2013 C & T ENERGY OF EAST CANTON IN Brine 210 365
2014 C & T ENERGY OF EAST CANTON IN Brine 70 365
2015 C & T ENERGY OF EAST CANTON IN Brine 140 365
2016 C & T ENERGY OF EAST CANTON IN Brine 70 365
2017 C & T ENERGY OF EAST CANTON IN Brine 70 365
2018 C & T ENERGY OF EAST CANTON IN Brine 70 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0028567802 2009-07-29 Preliminary Restoration No Violations The location is in the process of being final graded. I did not pass the Preliminary Restoration at this time.
0686016208 2010-04-20 Preliminary Restoration No Violations The well is in production and the reclamation is completed at the site. The Preliminary Restoration is PASSED.
0781137865 2008-11-18 Drill / Deepen / Reopen No Violations Advent Drilling is moving on the location and rigging up.
1227281975 2008-11-20 Drill / Deepen / Reopen No Violations Cemented 8-5/8 dia casing. Pits and liners are intact.
1227732476 2008-11-26 Drill / Deepen / Reopen No Violations Advent is still on the location.
1228245648 2008-12-02 Drill / Deepen / Reopen No Violations Advent Drilling is on the location and is shut down for deer season.
1240513172 2009-04-23 Preliminary Restoration No Violations The drilling pits are open. The well has not been fraced. There has been no reclamation done to date. I called Greg New and he said that he is fracturing the well in the next couple of weeks and will have the pits closed in May.

For data sources see[9]

References