If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Summit_County,_Ohio|Summit]] | | County: [[Summit_County,_Ohio|Summit]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Coventry Township,_Summit_County,_Ohio|Coventry Township]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-153-22984 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.016869625,"lon":-81.55139884,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: COVENTRY HIGH SCHOOL UNIT | |
License Status: Producing | |
License Date: 2006-08-07 | |
Spud Date: 2006-09-26 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2006-10-01 | |
Well Total Depth: 4105 ft | |
Configuration: Vertical | |
Latitude: 41.016869625 | |
Longitude: -81.55139884 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-08-07 | Proposed Formations:CLINTON, Issued Date:8/7/2006, Expired Date:8/7/2007 6:00:00 AM, Drilling unit acres:24.547, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2006-10-01 | RBDMS Rec |
Reached Total Depth | 2006-10-01 | RBDMS Rec |
Completion Report Received | 2006-11-06 | RBDMS Rec |
Construction Permit Expires | 2007-08-07 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-01-10 | 3859 | 3889 | 61 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 2357 Bbl | 70000 | 750 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | EVERFLOW EASTERN PTNS L P | 0 | 0 | 0 |
2007 | EVERFLOW EASTERN PTNS L P | 15115 | 283 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | 10852 | 178 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | 5490 | 85 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | 4819 | 124 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | 3916 | 194 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | 3704 | 0 | 336 |
2013 | EVERFLOW EASTERN PTNS L P | 3686 | 65 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | 3198 | 65 | 365 |
2015 | EVERFLOW EASTERN PTNS L P | 4193 | 53 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | 1834 | 0 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | 2025 | 76 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | 2223 | 29 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | EVERFLOW EASTERN PTNS L P | Brine | 95 | 0 |
2007 | EVERFLOW EASTERN PTNS L P | Brine | 485 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | Brine | 227 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | Brine | 119 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | Brine | 80 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | Brine | 70 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | Brine | 102 | 336 |
2013 | EVERFLOW EASTERN PTNS L P | Brine | 95 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2015 | EVERFLOW EASTERN PTNS L P | Brine | 65 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | Brine | 75 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | Brine | 70 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | Brine | 42 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0845002543 | 2006-10-02 | Drill / Deepen / Reopen | No Violations | Drilling has been completed and the rig is running production casing. The pits are lined and in good condition. |
1161557070 | 2006-10-17 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and closed. No violations at this time. |
1264489997 | 2006-09-29 | Drill / Deepen / Reopen | No Violations | Completed the BOP test before drilling out from under surface casing. |
1510151906 | 2006-09-25 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is moving on the location and should spud in the next day. The pits are being dug and will be lined. |
1577006837 | 2018-09-04 | UrbanProduction Wells | No Violations | Access to the wellhead was gained through Coventry High School bus barns parking lot. The wellhead was surrounded with a locked, screened chain link fence with three (3) strands of barbed wire. I. D. signage was posted. The well was configured to operate as a plunger lift well. A riser from the 8.625 surface casing supplied pressure to power the motor valve. A domestic natural gas connection was attached to the 4.5 production casing. No leaks or contamination were identified during this inspection at the wellhead. The tank battery was located in the school bus parking lot. The tank battery was surrounded with a screened, locked chain link fence and earthen dike. I. D. signage was posted and legible. The tank battery was comprised of one (1) 140 barrel stock tank, one (1) 35 barrel poly brine tank , one (1) 2408 horizontal separator with orifice gas meter. The gas meter reflected the current production period. A Dominion / EOG master meter was also in the tank battery. The load lines were locked and plugged. The stock tank had a carbon filter, lightning arrestor and pressure hatch. No leaks were found at the tank battery during this inspection. |
1643289503 | 2007-01-08 | Production Wells | No Violations | The well has been completed and is in production. Preliminary restoration will be approved as soon as the site has been seeded and is growing. Preliminary restoration is not due until June. |
1681509902 | 2006-09-27 | Drill / Deepen / Reopen | No Violations | Drilling of the surface hole is continuing. Should be ready to run and cement casing later today. The pits are lined and in good condition. The location is fenced off and the required identification is posted. No violations at this time. |
1689048540 | 2007-05-23 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
For data sources see[9]