X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-155-23195"

m
m
Line 11: Line 11:
 
| County: [[Trumbull_County,_Ohio|Trumbull]]
 
| County: [[Trumbull_County,_Ohio|Trumbull]]
 
|-
 
|-
| Municipality: [[Weathersfield_Township,_Trumbull_County,_Ohio|Weathersfield Township]]
+
| Municipality: [[Weathersfield Township,_Trumbull_County,_Ohio|Weathersfield Township]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]

Revision as of 13:11, 14 August 2019

Well Details

Well ID: 34-155-23195
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Weathersfield Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: CERNI
License Status: Producing
License Date: 1990-03-12
Spud Date: 1990-03-13
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1990-03-17
Well Total Depth: 5056 ft
Configuration: Vertical
Latitude: 41.179796343
Longitude: -80.71292337

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1988-03-25 2651 D & L ENERGY INC GeoDate 3/25/88
Oil and Gas 1988-03-25 Issued Date 3/25/88 Expired Date 3/25/89 Acres 0040700 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
CO 1989-05-18 2651 D & L ENERGY INC GeoDate 5/18/89
Oil and Gas 1989-05-18 Issued Date 5/18/89 Expired Date 5/18/90 Acres 0040700 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
CO 1989-08-29 2651 D & L ENERGY INC GeoDate 8/29/89
Oil and Gas 1989-08-29 Issued Date 8/29/89 Expired Date 8/29/90 Acres 0040700 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
CO 1990-03-12 84 EVERFLOW EASTERN PTNS L P GeoDate 3/12/90
Oil and Gas 1990-03-12 Issued Date 3/12/90 Expired Date 3/12/91 Acres 0042928 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05056 Proposed Drill Depth 05056
Original Spud 1990-03-13 R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89
Completed 1990-03-17 R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89
Reached Total Depth 1990-03-17 R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89
Completion Report Received 1990-04-09 R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89
Construction Permit Expires 1991-03-12 R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89
Record Last Modified 2017-02-15 R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4764 4904 0
2006-09-11 4808 4856 35

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 101000 Gal 70000 FRAC:WATER&SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1990 EVERFLOW EASTERN PTNS L P 7201 584 97
1991 EVERFLOW EASTERN PTNS L P 15417 696 365
1992 EVERFLOW EASTERN PTNS L P 10316 312 365
1993 EVERFLOW EASTERN PTNS L P 7771 245 365
1994 EVERFLOW EASTERN PTNS L P 5514 241 365
1995 EVERFLOW EASTERN PTNS L P 3148 160 365
1996 EVERFLOW EASTERN PTNS L P 4110 237 365
1997 EVERFLOW EASTERN PTNS L P 4423 199 365
1998 EVERFLOW EASTERN PTNS L P 2957 75 365
1999 EVERFLOW EASTERN PTNS L P 2948 137 365
2000 EVERFLOW EASTERN PTNS L P 3300 151 365
2001 EVERFLOW EASTERN PTNS L P 2695 92 365
2002 EVERFLOW EASTERN PTNS L P 2325 125 365
2003 EVERFLOW EASTERN PTNS L P 2414 119 365
2004 EVERFLOW EASTERN PTNS L P 2966 68 365
2005 EVERFLOW EASTERN PTNS L P 2277 42 365
2006 EVERFLOW EASTERN PTNS L P 1709 51 365
2007 EVERFLOW EASTERN PTNS L P 2204 62 365
2008 EVERFLOW EASTERN PTNS L P 1664 53 365
2009 EVERFLOW EASTERN PTNS L P 1292 0 365
2010 EVERFLOW EASTERN PTNS L P 1238 0 365
2011 EVERFLOW EASTERN PTNS L P 1188 0 365
2012 EVERFLOW EASTERN PTNS L P 1169 52 366
2013 EVERFLOW EASTERN PTNS L P 1087 0 365
2014 EVERFLOW EASTERN PTNS L P 797 0 335
2015 EVERFLOW EASTERN PTNS L P 1054 0 365
2016 EVERFLOW EASTERN PTNS L P 1127 75 365
2017 EVERFLOW EASTERN PTNS L P 1303 63 365
2018 EVERFLOW EASTERN PTNS L P 1168 69 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1990 EVERFLOW EASTERN PTNS L P Brine 186 97
1991 EVERFLOW EASTERN PTNS L P Brine 69 365
1992 EVERFLOW EASTERN PTNS L P Brine 48 365
1993 EVERFLOW EASTERN PTNS L P Brine 0 365
1994 EVERFLOW EASTERN PTNS L P Brine 0 365
1995 EVERFLOW EASTERN PTNS L P Brine 0 365
1996 EVERFLOW EASTERN PTNS L P Brine 0 365
1997 EVERFLOW EASTERN PTNS L P Brine 39 365
1998 EVERFLOW EASTERN PTNS L P Brine 0 365
1999 EVERFLOW EASTERN PTNS L P Brine 0 365
2000 EVERFLOW EASTERN PTNS L P Brine 50 365
2001 EVERFLOW EASTERN PTNS L P Brine 0 365
2002 EVERFLOW EASTERN PTNS L P Brine 0 365
2003 EVERFLOW EASTERN PTNS L P Brine 66 365
2004 EVERFLOW EASTERN PTNS L P Brine 0 365
2005 EVERFLOW EASTERN PTNS L P Brine 0 365
2006 EVERFLOW EASTERN PTNS L P Brine 0 365
2007 EVERFLOW EASTERN PTNS L P Brine 0 365
2008 EVERFLOW EASTERN PTNS L P Brine 48 365
2009 EVERFLOW EASTERN PTNS L P Brine 0 365
2010 EVERFLOW EASTERN PTNS L P Brine 0 365
2011 EVERFLOW EASTERN PTNS L P Brine 0 365
2012 EVERFLOW EASTERN PTNS L P Brine 0 366
2013 EVERFLOW EASTERN PTNS L P Brine 0 365
2014 EVERFLOW EASTERN PTNS L P Brine 0 335
2015 EVERFLOW EASTERN PTNS L P Brine 0 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 0 365
2018 EVERFLOW EASTERN PTNS L P Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0308195879 2004-03-04 Preliminary Restoration No Violations Restoration approved ,
0309997859 2013-07-08 UrbanProduction Wells No Violations My inspection found the flow line buried and the trench graded per my request.
0530944197 2013-06-06 UrbanProduction Wells No Violations My inspection found the well in production. The well was equipped with a plunger lift unit. It was surrounded by concrete posts. The tank battery contained one, 100 barrel production tank, one, 100 barrel brine tank, and a separator. The dike was slightly weathered; however, it meets containment requirements. There were plugs on the load lines. I noticed a 1 black poly flow line lying on the ground from the well to the separator. The lease road was the businesss storage yard. I called Everflow Eastern at 330-537-3863. I told them to bury the flow line at the proper depth by July 8, 2013. This well was placed into production prior to House Bill 278.

For data sources see[9]

References