If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Trumbull_County,_Ohio|Trumbull]] | | County: [[Trumbull_County,_Ohio|Trumbull]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Weathersfield Township,_Trumbull_County,_Ohio|Weathersfield Township]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-155-23195 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.179796343,"lon":-80.71292337,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Weathersfield Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: CERNI | |
License Status: Producing | |
License Date: 1990-03-12 | |
Spud Date: 1990-03-13 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1990-03-17 | |
Well Total Depth: 5056 ft | |
Configuration: Vertical | |
Latitude: 41.179796343 | |
Longitude: -80.71292337 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1988-03-25 | 2651 D & L ENERGY INC GeoDate 3/25/88 |
Oil and Gas | 1988-03-25 | Issued Date 3/25/88 Expired Date 3/25/89 Acres 0040700 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1989-05-18 | 2651 D & L ENERGY INC GeoDate 5/18/89 |
Oil and Gas | 1989-05-18 | Issued Date 5/18/89 Expired Date 5/18/90 Acres 0040700 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1989-08-29 | 2651 D & L ENERGY INC GeoDate 8/29/89 |
Oil and Gas | 1989-08-29 | Issued Date 8/29/89 Expired Date 8/29/90 Acres 0040700 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1990-03-12 | 84 EVERFLOW EASTERN PTNS L P GeoDate 3/12/90 |
Oil and Gas | 1990-03-12 | Issued Date 3/12/90 Expired Date 3/12/91 Acres 0042928 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05056 Proposed Drill Depth 05056 |
Original Spud | 1990-03-13 | R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89 |
Completed | 1990-03-17 | R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89 |
Reached Total Depth | 1990-03-17 | R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89 |
Completion Report Received | 1990-04-09 | R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89 |
Construction Permit Expires | 1991-03-12 | R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89 |
Record Last Modified | 2017-02-15 | R.I. 6-20-89, R.I. 9-2-89, R.I./R.L.3-17-90, R.I. 5-20-89 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4764 | 4904 | 0 |
2006-09-11 | 4808 | 4856 | 35 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 101000 Gal | 70000 | FRAC:WATER&SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0308195879 | 2004-03-04 | Preliminary Restoration | No Violations | Restoration approved , |
0309997859 | 2013-07-08 | UrbanProduction Wells | No Violations | My inspection found the flow line buried and the trench graded per my request. |
0530944197 | 2013-06-06 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. It was surrounded by concrete posts. The tank battery contained one, 100 barrel production tank, one, 100 barrel brine tank, and a separator. The dike was slightly weathered; however, it meets containment requirements. There were plugs on the load lines. I noticed a 1 black poly flow line lying on the ground from the well to the separator. The lease road was the businesss storage yard. I called Everflow Eastern at 330-537-3863. I told them to bury the flow line at the proper depth by July 8, 2013. This well was placed into production prior to House Bill 278. |
For data sources see[9]