If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 9: | Line 9: | ||
| State: Ohio | | State: Ohio | ||
|- | |- | ||
− | | County: | + | | County: <County> |
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Milton Township,_Wayne_County,_Ohio|Milton Township]] |
|- | |- | ||
| Operator Name: [[GASSER RONALD & HOPE]] | | Operator Name: [[GASSER RONALD & HOPE]] |
Well ID: 34-169-23278 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.942623378,"lon":-81.83613587,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: Milton Township | |
Operator Name: GASSER RONALD & HOPE | |
Well Pad ID: | |
Farm/Lease Name: GASSER R& H | |
License Status: Producing | |
License Date: 1992-01-27 | |
Spud Date: 1982-06-10 | |
Spud Drilling Contractor: WOOSTER DRLG | |
Final Drill Date: 1982-07-24 | |
Well Total Depth: 3423 ft | |
Configuration: Vertical | |
Latitude: 40.942623378 | |
Longitude: -81.83613587 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-03-04 | Issued Date 3/5/82 Expired Date 9/1/82 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03423 Proposed Drill Depth 03423 |
Original Spud | 1982-07-08 | |
Completed | 1982-07-24 | |
Reached Total Depth | 1982-07-24 | |
Completion Report Received | 1982-08-09 | |
CO | 1982-08-21 | 627 KENOIL GeoDate 3/4/82 |
CO | 1992-01-27 | 627 KENOIL GeoDate 1/27/92 |
Unknown | 1992-01-27 | Issued Date 1/27/92 Expired Date 1/26/93 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
CO | 1992-09-29 | 2902 GASSER RONALD & HOPE GeoDate 1/27/92 |
Construction Permit Expires | 1993-01-26 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3300 | 3364 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2080 Bbl | 115000 | FRAC: 2080 BBL H2O, 115M SAND, 199M N2 | ||
N2 | 0 | 199 Mscf | 0 | N2=199,148 SCF |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | WENNER PETROLEUM CORP | 8749 | 1640 | 0 |
1985 | WENNER PETROLEUM CORP | 7113 | 795 | 0 |
1986 | WENNER PETROLEUM CORP | 3719 | 356 | 365 |
1988 | KENOIL LLC | 162 | 78 | 365 |
1989 | KENOIL LLC | 1934 | 10 | 365 |
1990 | KENOIL LLC | 711 | 76 | 365 |
1991 | KENOIL LLC | 538 | 0 | 365 |
2006 | GASSER RONALD & HOPE | 0 | 0 | 0 |
2007 | GASSER RONALD & HOPE | 0 | 0 | 0 |
2008 | GASSER RONALD & HOPE | 0 | 6 | 365 |
2009 | GASSER RONALD & HOPE | 0 | 0 | 120 |
2010 | GASSER RONALD & HOPE | 0 | 0 | 120 |
2011 | GASSER RONALD & HOPE | 0 | 0 | 30 |
2012 | GASSER RONALD & HOPE | 0 | 0 | 30 |
2013 | GASSER RONALD & HOPE | 0 | 0 | 365 |
2014 | GASSER RONALD & HOPE | 0 | 0 | 365 |
2015 | GASSER RONALD & HOPE | 0 | 0 | 365 |
2016 | GASSER RONALD & HOPE | 0 | 0 | 365 |
2017 | GASSER RONALD & HOPE | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | WENNER PETROLEUM CORP | Brine | 17 | 0 |
1985 | WENNER PETROLEUM CORP | Brine | 14 | 0 |
1986 | WENNER PETROLEUM CORP | Brine | 0 | 365 |
1988 | KENOIL LLC | Brine | 0 | 365 |
1989 | KENOIL LLC | Brine | 0 | 365 |
1990 | KENOIL LLC | Brine | 0 | 365 |
1991 | KENOIL LLC | Brine | 0 | 365 |
2006 | GASSER RONALD & HOPE | Brine | 0 | 0 |
2007 | GASSER RONALD & HOPE | Brine | 0 | 0 |
2008 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2009 | GASSER RONALD & HOPE | Brine | 0 | 120 |
2010 | GASSER RONALD & HOPE | Brine | 0 | 120 |
2011 | GASSER RONALD & HOPE | Brine | 0 | 30 |
2012 | GASSER RONALD & HOPE | Brine | 0 | 30 |
2013 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2014 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2015 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2016 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2017 | GASSER RONALD & HOPE | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL1004 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0203918913 | 2014-06-05 | Production Wells | No Violations | Well appears to be for house gas use only. No apparent problems at this time. |
0954690488 | 2017-08-29 | Production Wells | No Violations | Inspected production well on 08/29/2017. The well is equipped with a swedge with a valve, pressure gauge, and regulator. No well identification is posted at the wellhead. Mr. Ron Gasser was notified of this issue and will address it promptly. There are no tanks associated with this well. No other problems were noted at the time of the inspection. |
1596613142 | 2016-03-14 | Production Wells | No Violations | Inspected production well on 03/14/2016. The tank battery consists of 3-100 bbl steel tanks, 2-vertical separators, and 1-underground brine vault located within an earthen dike. The well is equipped with a swedge-top wellhead and pressure gauge. No well identification is posted at either the tank battery or the wellhead. Attempted to notify Mr. Gasser at the phone number listed in RBDMS, but was unable to reach anyone or to leave a voicemail. Will send the operator a copy of the inspection report and request a phone call back regarding correcting this issue. No other problems were noted at the time of the inspection. |
For data sources see[9]