X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-22380"

m
m
Line 11: Line 11:
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
|-
 
|-
| Municipality: [[Boardman_Township,_Mahoning_County,_Ohio|Boardman Township]]
+
| Municipality: [[Boardman Township,_Mahoning_County,_Ohio|Boardman Township]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]

Revision as of 18:31, 14 August 2019

Well Details

Well ID: 34-099-22380
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Boardman Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: DIXON-DEROSA UNIT
License Status: Producing
License Date: 1989-12-22
Spud Date: 1990-01-01
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1990-01-08
Well Total Depth: 5587 ft
Configuration: Vertical
Latitude: 41.023184405
Longitude: -80.68725561

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1989-12-22 84 EVERFLOW EASTERN PTNS L P GeoDate 12/22/89
Oil and Gas 1989-12-22 Issued Date 12/22/89 Expired Date 12/22/90 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05587 Proposed Drill Depth 05587
Original Spud 1990-01-01
Completed 1990-01-08
Reached Total Depth 1990-01-08
Completion Report Received 1990-04-30
Construction Permit Expires 1990-12-22
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 5304 5458 0
2006-09-11 5344 5414 50

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 120000 Gal 80000 FRAC:WATER/SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1990 EVERFLOW EASTERN PTNS L P 28411 0 176
1991 EVERFLOW EASTERN PTNS L P 41772 0 365
1992 EVERFLOW EASTERN PTNS L P 28430 24 365
1993 EVERFLOW EASTERN PTNS L P 19 17 365
1994 EVERFLOW EASTERN PTNS L P 14859 0 365
1996 EVERFLOW EASTERN PTNS L P 12868 0 365
1997 EVERFLOW EASTERN PTNS L P 10398 0 365
1998 EVERFLOW EASTERN PTNS L P 11567 0 365
1999 EVERFLOW EASTERN PTNS L P 10299 0 365
2000 EVERFLOW EASTERN PTNS L P 9731 16 365
2001 EVERFLOW EASTERN PTNS L P 9187 0 365
2002 EVERFLOW EASTERN PTNS L P 11091 0 365
2003 EVERFLOW EASTERN PTNS L P 9950 0 365
2004 EVERFLOW EASTERN PTNS L P 9362 0 365
2005 EVERFLOW EASTERN PTNS L P 7709 0 365
2006 EVERFLOW EASTERN PTNS L P 4796 0 365
2007 EVERFLOW EASTERN PTNS L P 4953 0 365
2008 EVERFLOW EASTERN PTNS L P 5694 0 365
2009 EVERFLOW EASTERN PTNS L P 3095 0 365
2010 EVERFLOW EASTERN PTNS L P 5381 0 365
2011 EVERFLOW EASTERN PTNS L P 3556 0 197
2012 EVERFLOW EASTERN PTNS L P 2138 0 156
2013 EVERFLOW EASTERN PTNS L P 3808 0 365
2014 EVERFLOW EASTERN PTNS L P 3629 0 305
2015 EVERFLOW EASTERN PTNS L P 705 0 365
2016 EVERFLOW EASTERN PTNS L P 337 0 365
2017 EVERFLOW EASTERN PTNS L P 3039 0 365
2018 EVERFLOW EASTERN PTNS L P 3520 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1990 EVERFLOW EASTERN PTNS L P Brine 142 176
1991 EVERFLOW EASTERN PTNS L P Brine 62 365
1992 EVERFLOW EASTERN PTNS L P Brine 366 365
1993 EVERFLOW EASTERN PTNS L P Brine 54 365
1994 EVERFLOW EASTERN PTNS L P Brine 70 365
1996 EVERFLOW EASTERN PTNS L P Brine 65 365
1997 EVERFLOW EASTERN PTNS L P Brine 22 365
1998 EVERFLOW EASTERN PTNS L P Brine 0 365
1999 EVERFLOW EASTERN PTNS L P Brine 0 365
2000 EVERFLOW EASTERN PTNS L P Brine 28 365
2001 EVERFLOW EASTERN PTNS L P Brine 24 365
2002 EVERFLOW EASTERN PTNS L P Brine 0 365
2003 EVERFLOW EASTERN PTNS L P Brine 0 365
2004 EVERFLOW EASTERN PTNS L P Brine 27 365
2005 EVERFLOW EASTERN PTNS L P Brine 16 365
2006 EVERFLOW EASTERN PTNS L P Brine 24 365
2007 EVERFLOW EASTERN PTNS L P Brine 0 365
2008 EVERFLOW EASTERN PTNS L P Brine 0 365
2009 EVERFLOW EASTERN PTNS L P Brine 0 365
2010 EVERFLOW EASTERN PTNS L P Brine 0 365
2011 EVERFLOW EASTERN PTNS L P Brine 0 197
2012 EVERFLOW EASTERN PTNS L P Brine 0 156
2013 EVERFLOW EASTERN PTNS L P Brine 0 365
2014 EVERFLOW EASTERN PTNS L P Brine 0 305
2015 EVERFLOW EASTERN PTNS L P Brine 0 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 0 365
2018 EVERFLOW EASTERN PTNS L P Brine 19 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
000PL12467 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0988228322 2004-05-26 Production Wells No Violations The tank battery is shared with permits 2490 and 2516 and consists of 1-100 bbl storage tank, 1-50 bbl salt water tank, 2-separators a dike and a fence.
1106897785 2010-09-30 Production Wells No Violations I performed a random field inspection. I GPSd both the tank battery and the wellhead. I continued to walk around both the wellhead and the tank battery. This inspection satisfies 1501:9-9-05. There were no violations at this time.
2014212480 2017-12-13 Production Wells No Violations The purpose of my inspection was to conduct a status check on well #2-2380. Inspector John Fleming was present during the inspection. A review of RBDMS indicated production reporting was current. Access to the well was through a residential yard. The well head and tank battery were enclosed by a locked chain-link fence enclosures obscured by landscaping. Correct identification was present. The 8.625 well head was at grade. The 4.5 production casing was equipped with a plunger lift assembly. Production valves were in the open position. No leaks were observed. The tank battery was shared with #2-2516 and #2-2490. All equipment was within a locked chain-link fence enclosure obscured by landscaping. Correct identification was present. A stable earthen dike that was free of fluid was present around the equipment. Equipment within the dike consisted of one (1) horizontal separator, one (1) common 140 bbl production tank and one (1) common 50 bbl brine tank. The separator remained in good repair and contained a current 7 day chart. The production tank remained in good repair. Valves were closed and plugged. The brine tank remained in good repair. Valves were closed and plugged. No violations were observed during this inspection.

For data sources see[9]

References