If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Mahoning_County,_Ohio|Mahoning]] | | County: [[Mahoning_County,_Ohio|Mahoning]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Goshen Township,_Mahoning_County,_Ohio|Goshen Township]] |
|- | |- | ||
| Operator Name: [[ERIC PETROLEUM CORP]] | | Operator Name: [[ERIC PETROLEUM CORP]] |
Well ID: 34-099-22438 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.962289813,"lon":-80.8843055,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Goshen Township | |
Operator Name: ERIC PETROLEUM CORP | |
Well Pad ID: | |
Farm/Lease Name: TRUITT | |
License Status: Producing | |
License Date: 1990-09-17 | |
Spud Date: 1990-11-29 | |
Spud Drilling Contractor: GRIM DRILLING | |
Final Drill Date: 1991-01-26 | |
Well Total Depth: 631 ft | |
Configuration: Vertical | |
Latitude: 40.962289813 | |
Longitude: -80.88430550 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1990-09-17 | 3069 MURNANE JOSEPH M GeoDate 9/17/90 |
Oil and Gas | 1990-09-17 | Issued Date 9/17/90 Expired Date 9/17/91 Acres 0002000 Tool Type CT Proposed Formation BEREA Proposed Depth 00631 Proposed Drill Depth 00631 |
Original Spud | 1990-12-14 | |
Completed | 1991-01-26 | |
Reached Total Depth | 1991-01-26 | |
Construction Permit Expires | 1991-09-17 | |
Completion Report Received | 1991-09-23 | |
CO | 1992-12-28 | 213 LOMAK OPERATING CO GeoDate 9/17/90 |
Change of Owner | 1999-10-19 | Operator changed from 213, RANGE OPERATING COMPANY to 5054, ERIC PETROLEUM CORP |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 620 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | NOT TREATED |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | COLUMBUS OILFIELD EXPL. CO. | Brine | 0 | 365 |
1993 | RANGE OPERATING COMPANY | Brine | 0 | 334 |
1994 | RANGE OPERATING COMPANY | Brine | 0 | 365 |
1995 | RANGE OPERATING COMPANY | Brine | 0 | 365 |
1996 | RANGE OPERATING COMPANY | Brine | 0 | 365 |
1997 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
1998 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
1999 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2000 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2001 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2002 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2003 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2004 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2005 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2006 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2007 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2008 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2009 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2010 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2011 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2012 | ERIC PETROLEUM CORP | Brine | 0 | 366 |
2013 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2014 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2015 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2016 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2017 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
2018 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000002187 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 8/5/91 INSPECTOR KEITH WHITE DATE 08/0519/91 DATA FROM OLD VAX INFO | |
0409489613 | 2018-01-30 | Production Wells | No Violations | The purpose of my inspection was to document the status of identification at well #2-2438. At the time of my inspection identification was posted at the well head. No further action is necessary. |
1516195039 | 2018-01-16 | Production Wells | No Violations | The purpose of my inspection was to document the posting of identification at well #2-2438. ODNR-DOGRM Northeast District Supervisor Stephen Ochs was present during the inspection. The owner had posted identification at the tank battery that identified all wells produced into the tank battery. No identification was present at the well head. Snow cover prevented determining if the location was on the ground. I spoke with Eric Petroleum Superintendent Rick Huffman on 01/17/2018. Mr. Huffman stated that identification was posted and he would communicate with lease operator as to the status of identification. |
1989718119 | 2017-12-19 | Production Wells | No Violations | The purpose of my inspection was to conduct a status check on well #2-2438. A review of RBDMS indicated the owner was current with reported production. Access to the well and tank battery was through a farm driveway. No identification was present at the well head. The 8.625 well head was below grade. The 4.5 production casing was equipped with a 4.5 X 2.5 swage and produced open flow. A stainless band clamp was present on the flow line. No leaks were observed. The tank battery was shared with 2-2412, 2-2459, and 2-2457. A stable earthen dike that was free of fluid was present around the equipment. Equipment within the dike consisted of one (1) vertical separator and one (1) 140 bbl production tank. The separator remained in good repair. No leaks were observed. A current 7 day production chart was in the meter house and identified Truitt 2,3,4. Truitt #1 was marked on the door. The production tank remained in good repair. No identification was present. Valves were closed and plugged. I spoke with Rick Huffman at Eric Petroleum on 12/29/2017. Mr. Huffman reported that the production tank had been replace recently and was due to have identification posted. He continued that identification would be posted at the well head as well. I will schedule a follow-up inspection to confirm identification was posted dependent on weather. |
2009140756 | 2018-01-10 | Production Wells | No Violations | The purpose of my inspection was to document the status of identification at well #2-2438. At the time of my inspection, correct identification was not present. I called and spoke with Eric Petroleum representative Rick Huffman concerning the situation. Mr. Huffman reported that weather conditions prevented the identification from being installed and that the lease operator was scheduled to install the identification on 01/11/2018. On 01/11/2018 I received a voicemail message from Mr. Huffman reporting that identification was installed. I will schedule a follow-up inspection to document the status of identification. |
For data sources see[9]