If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Mahoning_County,_Ohio|Mahoning]] | | County: [[Mahoning_County,_Ohio|Mahoning]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Poland Township,_Mahoning_County,_Ohio|Poland Township]] |
|- | |- | ||
| Operator Name: [[HILCORP ENERGY COMPANY]] | | Operator Name: [[HILCORP ENERGY COMPANY]] |
Well ID: 34-099-23196 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01363987,"lon":-80.5365114,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Poland Township | |
Operator Name: HILCORP ENERGY COMPANY | |
Well Pad ID: US-OH-000748 | |
Farm/Lease Name: POLAND-CLL2 | |
License Status: Producing | |
License Date: 2013-07-17 | |
Spud Date: 2013-09-22 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2013-11-27 | |
Well Total Depth: 17509 ft | |
Configuration: Horizontal | |
Latitude: 41.013639870 | |
Longitude: -80.53651140 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-17 | Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:2417.17, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-11-27 | |
Completion Report Received | 2014-05-16 | |
Construction Permit Expires | 2014-07-17 | |
Correction to Well | 2015-02-13 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-02-15 | H2O | 8 | 9147 Bbl | 449600 | Universal Well Services Inc. | STAGE 8
48 SHOTS |
2014-02-21 | H2O | 8 | 8907 Bbl | 4494 | Universal Well Services Inc. | STAGE 19
48 SHOTS |
2014-02-17 | H2O | 8 | 8691 Bbl | 450900 | Universal Well Services Inc. | STAGE 14
48 SHOTS |
2014-02-21 | H2O | 8 | 8870 Bbl | 4528 | Universal Well Services Inc. | STAGE 17
48 SHOTS |
2014-02-16 | H2O | 8 | 8904 Bbl | 4499 | Universal Well Services Inc. | STAGE 11
48 SHOTS |
2014-02-16 | H2O | 8 | 9523 Bbl | 451200 | Universal Well Services Inc. | STAGE 10
48 SHOTS |
2013-02-22 | H2O | 8 | 8829 Bbl | 449500 | Universal Well Services Inc. | STAGE 20
48 SHOTS |
2014-02-15 | H2O | 8 | 9519 Bbl | 4505 | Universal Well Services Inc. | STAGE 9
48 SHOTS |
2014-02-20 | H2O | 8 | 8810 Bbl | 450800 | Universal Well Services Inc. | STAGE 15
48 SHOTS |
2014-02-13 | H2O | 8 | 9434 Bbl | 456200 | Universal Well Services Inc. | STAGE 4
48 SHOTS |
2014-02-21 | H2O | 8 | 9811 Bbl | 454800 | Universal Well Services Inc. | STAGE 18
48 SHOTS |
2014-02-14 | H2O | 8 | 9133 Bbl | 451900 | Universal Well Services Inc. | STAGE 6
48 SHOTS |
2014-02-17 | H2O | 8 | 8866 Bbl | 450600 | Universal Well Services Inc. | STAGE 13
48 SHOTS |
2014-02-13 | H2O | 8 | 9841 Bbl | 453500 | Universal Well Services Inc. | STAGE 2
48 SHOTS |
2014-02-14 | H2O | 8 | 9640 Bbl | 454600 | Universal Well Services Inc. | STAGE 7
48 SHOTS |
2014-02-14 | H2O | 8 | 9121 Bbl | 451100 | Universal Well Services Inc. | STAGE 5
48 SHOTS |
2014-02-13 | H2O | 8 | 9259 Bbl | 453100 | Universal Well Services Inc. | STAGE 3
48 SHOTS |
2014-02-20 | H2O | 8 | 8638 Bbl | 445800 | Universal Well Services Inc. | STAGE 16
48 SHOTS |
2014-02-12 | H2O | 8 | 9218 Bbl | 452900 | Universal Well Services Inc. | STAGE 1
32 SHOTS |
2014-02-16 | H2O | 8 | 8680 Bbl | 455200 | Universal Well Services Inc. | STAGE 12
48 SHOTS |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | 739315 | 0 | 206 |
2015 | HILCORP ENERGY COMPANY | 892375 | 0 | 330 |
2016 | HILCORP ENERGY COMPANY | 573315 | 0 | 362 |
2017 | HILCORP ENERGY COMPANY | 380707 | 0 | 363 |
2018 | HILCORP ENERGY COMPANY | 229901 | 0 | 364 |
2019 | HILCORP ENERGY COMPANY | 44924 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | Brine | 12613 | 206 |
2015 | HILCORP ENERGY COMPANY | Brine | 5307 | 330 |
2016 | HILCORP ENERGY COMPANY | Brine | 7983 | 362 |
2017 | HILCORP ENERGY COMPANY | Brine | 3099 | 363 |
2018 | HILCORP ENERGY COMPANY | Brine | 1675 | 364 |
2019 | HILCORP ENERGY COMPANY | Brine | 414 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0031526714 | 2014-04-16 | Drill / Deepen / Reopen | No Violations | C.L Forbes Service Rig is on location running 2 7/8 tubing. Rig is setting on containment fire extinguishers are at various locations and safety lanes are marked. Wellheads are protected with steel cages over them. No violations were noted at this time. |
0044659069 | 2016-01-20 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
0340863311 | 2018-06-27 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
0466460688 | 2014-03-05 | Drill / Deepen / Reopen | No Violations | Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time. |
0523152728 | 2014-02-12 | Drill / Deepen / Reopen | No Violations | Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time. |
0523258778 | 2013-09-27 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig 18 drilled a 12.25 well bore to a total depth of 2500 and ran 2500 of 36# J-55 casing. Baker Hughes pumped 234 barrels of water ahead followed by 35 barrels of Gel with Fed Seal and Cello flake follow by 10 barrels of fresh water spacer. They pumped 873 sacks of A+.05S+2CACL+.5%BA10 cement. Displaced with 190 barrels of fresh water. Bumped plug floats held. There was 40 barrels of cement returned to surface. Good circulation throughout job. |
0700629866 | 2015-08-21 | Production Wells | No Violations | I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
0835583192 | 2013-07-20 | Drill / Deepen / Reopen | No Violations | I was on location for the cementing of the conductor pipe. The 20 casing was set at 90. Express Energy was the company on location for drilling the conductor and cementing it. Circulation was established and Class A cement with 2 % calcium and 8 oz. of flake was used. The cement scaled at approximatly 15.6 ppg. 173 sacks of cement was used at approximatly 50% excess. I witnessed cement return to surface and the casing was shut in for the cement to set. |
0844346230 | 2017-06-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
0937951802 | 2018-11-07 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
0944768553 | 2015-06-17 | Preliminary Restoration | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Preliminary Restoration is passed |
0957863312 | 2014-06-09 | Production Wells | No Violations | On 6/9/2014. After receiving the approval to produce dated 6/6/2014. Hilcop Energy started turning the above well into production. I was on location to observe this operation. There were various Hilcorp personal on location. Turn on was completed with out incident. Equipment is set up with various safety shut downs. |
0968304020 | 2013-10-29 | Drill / Deepen / Reopen | No Violations | H&P Rig 225 is preparing to move to the 6-H (3409923192) location. No violations were noted at this time. Vacuum trucks are on location vacuuming all the fresh water as they clean the rig. |
0977952919 | 2013-10-22 | Drill / Deepen / Reopen | No Violations | Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. We meet with Bill Mitchell the Drilling Consultant for Hillcorp. At that time Blackhawk was performing the blowout preventor test and casing test. We talked with the personal that was performing the test about the various aspects of the testing |
1026844961 | 2015-09-28 | Production Wells | No Violations | I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time. |
1087210393 | 2014-05-06 | Production Wells | No Violations | I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration can not be passed at this time. |
1091116461 | 2017-01-13 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was 150 psi on the annuals at this time. |
1104067213 | 2015-11-02 | Production Wells | No Violations | I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time. |
1187709409 | 2016-09-30 | Production Wells | No Violations | I performed a follow up inspection to check the pressure between the annuls 13-3/8 and the 9-5/8 casing there was 680 psi. I called Tom Havanek and instructed him to install a relieve valve or to plumb the annuals into the flowline (50 psi). He instructed that he would have his contractor to perform the job. |
1377008220 | 2013-07-20 | Drill / Deepen / Reopen | No Violations | Express Energy Service is on location drilling a 30 conductor hole to a depth of 90 and ran 90 of 20 94# conductor casing. They cemented with 172 sacks of class A cement. They had 13 barrels of cement returned to surface. . Permits are posted. There has been safety meeting. No violations at this time. Kevin Perry covered this job. |
1380737561 | 2013-09-27 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig 18 drilled a 17.5 well bore to a total depth of 900 and ran 900 of 13-3/8 61# J-55 casing. Baker Hughes pumped 170 barrels of water ahead followed by 35 barrels of Gel with Fed Seal and Cello flake follow by 10 barrels of fresh water spacer. They pumped 766 sacks of A+.05S+2CACL+.5BA10 cement. Displaced with 132 barrels of fresh water. Bumped plug floats held. There was 50 barrels of cement returned to surface. Good circulation throughout job. |
1441975737 | 2014-01-31 | Drill / Deepen / Reopen | No Violations | Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time. |
1468088565 | 2014-06-11 | Administrative Inspection | No Violations | I was on location with Geologist Mike McCormac and Geologist Teresa McQuade from the ODNR Columbus Office and also Adam Mullet a production personal from Hilcorp. Adam was explaining how the Gas Production Units ( GPU ) measured the gas and fluids before it went to the central production facility. The production facility is where the gas enters the sales point and the water and oil/condensate is collected. |
1476719963 | 2016-10-14 | Production Wells | No Violations | I performed a follow up inspection. Hilcorp has installed the gage and also installed 3/8 tubing on the 13-3/8 annuals into the flowline at present there is 100 psi. ID signs are posted no noted violation at this time. |
1505739914 | 2014-04-16 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. At this time there is no drilling or stimulations active at this location. There is various clean up operations on gone, removing containment, flowback equipment and tanks. Well is shut-in. |
1684067283 | 2013-11-25 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. H&P Drilling Rig 225 drilled 8.625 to a total depth of 17509 and are now running 5.5 casing. They will call when ready to cement casing. |
1739056821 | 2016-09-09 | Production Wells | No Violations | Northeast Region Supervisor Tom Hill and my self met with Hilcorps Production personnel to discuss the annuals pressure 600 psi on this well. They removed the gage and bled the pressure off. There was no noticeable pressure coming out of the needle valve They installed a new gage and will monitor the pressures. |
1839805134 | 2016-09-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. I noticed that the annuals had 600 psi between the 13-3/8 and the 9-5/8. I called Tom Havanek Operations Manager and told him about the pressure. He set up a meeting for 9/9/2016 at 1:00 PM with his production personnel. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There are also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
2095762228 | 2013-11-19 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. H&P 225 is drilling at a depth of 10396 with oil base mud. There is a vacuume truck on location vacuuming rain water from inside the containment area around the drilling rig. Permits are posted. No violations were noted at this time. |
For data sources see[8]