If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Holmes_County,_Ohio|Holmes]] | | County: [[Holmes_County,_Ohio|Holmes]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Washington Township,_Holmes_County,_Ohio|Washington Township]] |
|- | |- | ||
| Operator Name: [[CENTRAL ENERGY CO INC]] | | Operator Name: [[CENTRAL ENERGY CO INC]] |
Well ID: 34-075-24225 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.64563499,"lon":-82.17827486,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Holmes | |
Municipality: Washington Township | |
Operator Name: CENTRAL ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: KICK D | |
License Status: Final Restoration | |
License Date: 1994-03-10 | |
Spud Date: 1984-03-24 | |
Spud Drilling Contractor: CHRYSTAL ENERGY | |
Final Drill Date: 1984-03-31 | |
Well Total Depth: 600 ft | |
Configuration: Vertical | |
Latitude: 40.645634990 | |
Longitude: -82.17827486 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-11-28 | Issued Date 11/28/83 Expired Date 5/26/84 Acres 0001000 Tool Type RTAF Proposed Formation BEREA Proposed Depth 00600 Proposed Drill Depth 00600 |
Original Spud | 1984-03-24 | |
Completed | 1984-03-31 | |
Reached Total Depth | 1984-03-31 | |
CO | 1984-05-20 | 340 OHIO PURE OIL CORP GeoDate 11/28/83 |
Completion Report Received | 1984-12-07 | |
CO | 1994-02-11 | 496 CENTRAL ENERGY CO INC GeoDate 11/28/83 |
CO | 1994-03-10 | 496 CENTRAL ENERGY CO INC GeoDate 3/10/94 |
COMBINATION WELL | 1994-03-10 | Issued Date 3/10/94 Expired Date 3/10/95 Proposed Purpose OG Was Plug Supervised N Who Superivsed BY CO.Plug and Abandon Date 3/29/94 |
Plugged/Abandoned | 1994-03-29 | |
Construction Permit Expires | 1995-03-10 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 544 | 558 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 28 Qts | 0 | SHOT: 28 QT NITRO |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000PL15422 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
iANGE00070 | 1997-10-21 | Final Restoration | No Violations |
For data sources see[5]