If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]] | | County: [[Tuscarawas_County,_Ohio|Tuscarawas]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Rush Township,_Tuscarawas_County,_Ohio|Rush Township]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-157-23751 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.361435553,"lon":-81.40072767,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Rush Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: ROMIG RALPH H | |
License Status: Producing | |
License Date: 1982-07-13 | |
Spud Date: 1982-09-22 | |
Spud Drilling Contractor: CVAS DRLG | |
Final Drill Date: 1982-09-30 | |
Well Total Depth: 5330 ft | |
Configuration: Vertical | |
Latitude: 40.361435553 | |
Longitude: -81.40072767 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-07-13 | Issued Date 7/13/82 Expired Date 1/1/83 Acres 0040100 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05330 Proposed Drill Depth 05330 |
Original Spud | 1982-09-21 | |
Completed | 1982-09-30 | |
Reached Total Depth | 1982-09-30 | |
CO | 1982-10-15 | 84 EVERFLOW EASTERN PTNS L P GeoDate 7/13/82 |
Completion Report Received | 1982-11-03 | |
Construction Permit Expires | 1983-01-01 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5060 | 5164 | 0 |
2006-09-11 | 5087 | 5126 | 13 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 94920 Gal | 60000 | FRAC: 95MG H2O, 60M SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL3083 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0219767735 | 2019-05-16 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped 11.750 inch diameter casing, 8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and on the casing were open. Production equipment included a steel 210 barrel tank, a horizonal separator, and a chart recorder with a 2x 1 inch orifice plate, within an earthen dike. The earthen dike area was being shared with another wells production equipment. The production report was up to date and proper identification was present. |
For data sources see[9]