X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-129-20259"

m
 
m
Line 11: Line 11:
 
| County: [[Pickaway_County,_Ohio|Pickaway]]
 
| County: [[Pickaway_County,_Ohio|Pickaway]]
 
|-
 
|-
| Municipality: [[Wayne_Township,_Pickaway_County,_Ohio|Wayne Township]]
+
| Municipality: [[Wayne Township,_Pickaway_County,_Ohio|Wayne Township]]
 
|-
 
|-
 
| Operator Name: [[CHUCK HENRY ENERGY LLC]]
 
| Operator Name: [[CHUCK HENRY ENERGY LLC]]

Revision as of 08:19, 15 August 2019

Well Details

Well ID: 34-129-20259
Loading map...
Country: United States
State: Ohio
County: Pickaway
Municipality: Wayne Township
Operator Name: CHUCK HENRY ENERGY LLC
Well Pad ID:
Farm/Lease Name: DELONG-DAVIS UNIT
License Status: Producing
License Date: 2015-07-08
Spud Date: 2016-07-16
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2016-07-16
Well Total Depth: 2360 ft
Configuration: Vertical
Latitude: 39.592466815
Longitude: -83.05963804

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-07-08 Proposed Formations:KNOX, Issued Date:7/8/2015, Expired Date:7/7/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT
Original Spud 2016-07-16
Reached Total Depth 2016-07-16
Completion Report Received 2017-04-03
Change of Owner 2017-06-28 Operator changed from 5755, HOCKING HILLS ENERGY WELL SERV to 9919, CHUCK HENRY ENERGY LLC
Construction Permit Expires 2017-07-07
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-04-12 2329 2360 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-01-15 ACID 15 2067 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 HOCKING HILLS ENERGY AND WELL 0 2098 151
2016 HOCKING HILLS ENERGY AND WELL 0 900 151
2017 HOCKING HILLS ENERGY AND WELL 0 0 0
2018 CHUCK HENRY ENERGY LLC 0 4861 362

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 HOCKING HILLS ENERGY AND WELL Brine 70 151
2016 HOCKING HILLS ENERGY AND WELL Brine 0 151
2017 HOCKING HILLS ENERGY AND WELL Brine 0 0
2018 CHUCK HENRY ENERGY LLC Brine 0 362

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0221271225 2015-07-30 Drill / Deepen / Reopen No Violations Kilbarger rig number 8 has rigged up and began drilling out the cement plug and packer inside the 4.5 casing. A BOP has been used to protect against uncontrolled pressure in the knox unconformity.
0509609996 2015-11-23 Work Over Reconditioning No Violations Kilbarger rig number 8 is changing out the pump on this well. No violations noted.
0555918021 2015-07-22 Drill / Deepen / Reopen No Violations Surface casing cementing. Formation Cementing on site at 1830 hours. Good cement returns, approx. 10 barrels cement returned to mud pit.
0845500244 2019-03-08 Production Wells No Violations My inspection revealed this well consisted of a pumping unit. The valves on the casing wellhead and the tubing wellhead were in the open position. The tank battery consisted of 2-210 barrel tank and 1-100 barrel tank. Legible identification was posted.
1085343311 2015-07-21 Drill / Deepen / Reopen No Violations Kilbarger rig number ran 167 of 9.62 new conductor pipe. Formation Cementing on site to cement the conductor pipe.
1437404731 2015-07-20 Drill / Deepen / Reopen No Violations Kilbarger rig number 1 on site and is mixing mud. They spudded at 1:30 today. No violations noted.
1441042586 2015-08-31 Production Wells No Violations Production well inspection. The well is in production and consists of 2-210 barrel tanks and a pumping unit. The well did not have a legible identification. A employee of Hocking Hills Energy was on site and they put a legible identification on the tank battery.
1782098877 2018-11-29 Preliminary Restoration No Violations My inspection revealed the well meets the requirements for preliminary restoration.
2037718711 2015-12-11 Production Wells No Violations Production well inspection. The well consists of a pumping unit and 2-100 barrel tanks.

For data sources see[9]

References