If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Portage_County,_Ohio|Portage]] | | County: [[Portage_County,_Ohio|Portage]] | ||
|- | |- | ||
− | | Municipality: [[Streetsboro,_Ohio|Streetsboro]] | + | | Municipality: [[Streetsboro City,_Portage_County,_Ohio|Streetsboro City]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-133-23316 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.204055002,"lon":-81.33214975,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Streetsboro City | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: MYERS | |
License Status: Producing | |
License Date: 1985-04-22 | |
Spud Date: 1985-07-18 | |
Spud Drilling Contractor: CVAS DRLG | |
Final Drill Date: 1985-07-21 | |
Well Total Depth: 4289 ft | |
Configuration: Vertical | |
Latitude: 41.204055002 | |
Longitude: -81.33214975 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1984-11-01 | Issued Date 11/1/84 Expired Date 4/30/85 Acres 0042900 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1985-04-22 | 84 EVERFLOW EASTERN PTNS L P GeoDate 4/22/85 |
Oil and Gas | 1985-04-22 | Issued Date 4/22/85 Expired Date 10/19/85 Acres 0042900 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04289 Proposed Drill Depth 04289 |
Original Spud | 1985-07-18 | R.I. 4-27-85 |
Completed | 1985-07-21 | R.I. 4-27-85 |
Reached Total Depth | 1985-07-21 | R.I. 4-27-85 |
CO | 1985-07-29 | 84 EVERFLOW EASTERN PTNS L P GeoDate 11/1/84 |
Completion Report Received | 1985-08-01 | R.I. 4-27-85 |
Construction Permit Expires | 1985-10-19 | R.I. 4-27-85 |
Record Last Modified | 2017-02-15 | R.I. 4-27-85 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4061 | 4142 | 0 |
2006-09-11 | 4099 | 4140 | 2 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 99000 Gal | 60000 | FRAC;H2O,SAND,N2 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL6043 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point |
For data sources see[9]