If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| Province: Manitoba | | Province: Manitoba | ||
|- | |- | ||
− | | Division: [[Division No. | + | | Division: [[Division No. 6,_Manitoba|Division No. 6]] |
|- | |- | ||
− | | Subdivision: [[Wallace-Woodworth,_Division No. | + | | Subdivision: [[Wallace-Woodworth,_Division No. 6,_Manitoba|Wallace-Woodworth]] |
|- | |- | ||
| Operator Name: [[Tundra Oil & Gas Limited]] | | Operator Name: [[Tundra Oil & Gas Limited]] |
Well ID: 100.12-27-010-29W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.86625886,"lon":-101.3258222,"icon":""}]} |
Well Name: Daly Unit No. 11 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2012-01-03 | |
License Date: 2011-12-09 | |
Well Total Depth: 2362 | |
Latitude: 49.86625886 | |
Longitude: -101.3258222 |
For data sources see[1]
Spud Date | Contractor | Rig Number |
---|---|---|
2012-01-03 | CanElson Drilling Inc. | D176 |
For data sources see[2]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2012-01-30 | 959 | 2330 | 0 | N/A | 2015-04-21 |
For data sources see[3]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2012-01-30 | FRAC | ACID | 300 | SAND | 3.3 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 3 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 3 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 3 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 2 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 3 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 3 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-30 | FRAC | ACID | 300 | SAND | 3 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-31 | FRAC | ACID | 300 | SAND | 5 | |
2012-02-01 | FRAC | ACID | 300 | SAND | 3 | |
2012-02-01 | FRAC | ACID | 300 | SAND | 3 | |
2012-02-01 | FRAC | ACID | 300 | SAND | 3 | |
2012-01-30 | FRAC | ACID | 300 | SAND | 3 | |
2012-01-30 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-30 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-30 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-30 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-30 | FRAC | ACID | 300 | SAND | 5 | |
2012-01-30 | FRAC | ACID | 300 | SAND | 5 |
For data sources see[4]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 1,721.40 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 1,400.70 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 699.20 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 523.40 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 462.20 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 153.30 | 0 | 0.00 |
For data sources see[5]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 2,480.10 | 346 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 1,879.70 | 362 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 1,370.50 | 326 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 2,861.40 | 363 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 1,860.60 | 321 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 576.50 | 90 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[5]