If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 113: | Line 113: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 118: | Line 119: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | | + | | style="text-align: right;" | 4,294.28 Bbl |
− | | | + | | REUSE (AT WELL PAD) |
+ | | | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[ROCKDALE MARCELLUS LLC]] | ||
| Other Oil & Gas Wastes (in Barrels) RWC 899 | | Other Oil & Gas Wastes (in Barrels) RWC 899 | ||
| style="text-align: right;" | 86.63 Bbl | | style="text-align: right;" | 86.63 Bbl | ||
Line 130: | Line 133: | ||
| WMGR123NC010 | | WMGR123NC010 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 332.67 Tons |
| LANDFILL | | LANDFILL | ||
| 100955 | | 100955 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | | style="text-align: right;" | | + | | Drill Cuttings (in Tons) RWC 810 |
+ | | style="text-align: right;" | 1,118.63 Tons | ||
| LANDFILL | | LANDFILL | ||
| 301358 | | 301358 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[ROCKDALE MARCELLUS LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 105.00 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
− | | | + | | WMGR119 |
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[ROCKDALE MARCELLUS LLC]] | ||
| Synthetic Liner Materials (in Tons) RWC 806 | | Synthetic Liner Materials (in Tons) RWC 806 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 31.99 Tons |
| LANDFILL | | LANDFILL | ||
| 301358 | | 301358 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[ROCKDALE MARCELLUS LLC]] | ||
| Other Oil & Gas Wastes (in Barrels) RWC 899 | | Other Oil & Gas Wastes (in Barrels) RWC 899 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2,032.50 Bbl |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 76.67 Bbl | | style="text-align: right;" | 76.67 Bbl | ||
Line 226: | Line 175: | ||
| PAS2D215BWAR | | PAS2D215BWAR | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | ||
| style="text-align: right;" | 138.86 Tons | | style="text-align: right;" | 138.86 Tons | ||
Line 244: | Line 182: | ||
| 301358 | | 301358 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid (in Tons) RWC 802 |
+ | | style="text-align: right;" | 72.36 Tons | ||
| LANDFILL | | LANDFILL | ||
| 301358 | | 301358 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid (in Barrels) RWC 802 |
+ | | style="text-align: right;" | 5,382.01 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes (in Barrels) RWC 899 |
+ | | style="text-align: right;" | 198.33 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | Produced Fluid (in | + | | [[ROCKDALE MARCELLUS LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | | + | | style="text-align: right;" | 1,005.00 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
+ | | WMGR123NC022 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Synthetic Liner Materials (in Tons) RWC 806 | | Synthetic Liner Materials (in Tons) RWC 806 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 43.70 Tons |
| LANDFILL | | LANDFILL | ||
| 301358 | | 301358 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Tons) RWC 802 | | Produced Fluid (in Tons) RWC 802 | ||
| style="text-align: right;" | 19.13 Tons | | style="text-align: right;" | 19.13 Tons | ||
Line 304: | Line 224: | ||
| 100955 | | 100955 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[ROCKDALE MARCELLUS LLC]] |
− | | style="text-align: right;" | | + | | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 |
+ | | style="text-align: right;" | 44.25 Tons | ||
| LANDFILL | | LANDFILL | ||
| 301358 | | 301358 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[ROCKDALE MARCELLUS LLC]] | ||
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 23.41 Tons |
| LANDFILL | | LANDFILL | ||
− | | | + | | 100955 |
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[ROCKDALE MARCELLUS LLC]] | ||
| Synthetic Liner Materials (in Tons) RWC 806 | | Synthetic Liner Materials (in Tons) RWC 806 | ||
| style="text-align: right;" | 1.32 Tons | | style="text-align: right;" | 1.32 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100955 | | 100955 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} |
Well ID: 37-117-22002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.573225,"lon":-77.051578,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Liberty Township | |
Operator Name: ROCKDALE MARCELLUS LLC | |
Well Pad ID: 148455 | |
Farm/Lease Name: GUILLAUME UNIT 714 4H | |
License Status: Active | |
Spud Date: 2018-06-12 | |
Permit Date: 2018-05-31 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.573225 | |
Longitude: -77.051578 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | ROCKDALE MARCELLUS LLC | 946,324.00 | 61 | 0.00 | 0 | 0.00 | 0 |
2019 | ROCKDALE MARCELLUS LLC | 1,633,095.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid (in Barrels) RWC 802 | 4,294.28 Bbl | REUSE (AT WELL PAD) | |
2018 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 86.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 332.67 Tons | LANDFILL | 100955 |
2018 | ROCKDALE MARCELLUS LLC | Drill Cuttings (in Tons) RWC 810 | 1,118.63 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid (in Barrels) RWC 802 | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018 | ROCKDALE MARCELLUS LLC | Synthetic Liner Materials (in Tons) RWC 806 | 31.99 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 2,032.50 Bbl | REUSE (AT WELL PAD) | |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid (in Barrels) RWC 802 | 76.67 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 138.86 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid (in Tons) RWC 802 | 72.36 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid (in Barrels) RWC 802 | 5,382.01 Bbl | REUSE (AT WELL PAD) | |
2019 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 198.33 Bbl | REUSE (AT WELL PAD) | |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid (in Barrels) RWC 802 | 1,005.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2019 | ROCKDALE MARCELLUS LLC | Synthetic Liner Materials (in Tons) RWC 806 | 43.70 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid (in Tons) RWC 802 | 19.13 Tons | LANDFILL | 100955 |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 44.25 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 23.41 Tons | LANDFILL | 100955 |
2019 | ROCKDALE MARCELLUS LLC | Synthetic Liner Materials (in Tons) RWC 806 | 1.32 Tons | LANDFILL | 100955 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2748731 | Primary Facility | 2018-06-29 | Routine/Complete Inspection | No Violations Noted | Weather was 75° and sunny at time of inspection. Met with Rockdale Marcellus representative Jimmy Larson on location. Well is a spud conductor. Well has a steel plate welded over with the well number on it. Cellar has some standing water and no bubbling was noted at time of inspection. No violations were noted at time of inspection. |
2750152 | Primary Facility | 2018-07-10 | Drilling/Alteration | No Violations Noted | The weather is 85 Deg. F and sunny at the time of inspection. Routine inspection of Rockdale Marcellus LLC., Guillaume 714 Pad, well # 4H on July 10, 2018.
Currently intermediate casing 9-5/8" cemented at 2022 ft. Verified cement PTRs (surface and intermediate strings), permit, WOC time and driller's log. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Richard Becher, Oil and Gas Inspectors. Rockdale Marcellus LLC. Representative ¿ Jimmy Larson, DSM. |
2752939 | Primary Facility | 2018-07-16 | Routine/Complete Inspection | No Violations Noted | Weather was 88° and sunny at time of inspection. Met with Rockdale Marcellus representative Luke Chesner and Matthew Knight on location. Rig was currently in the process of moving from this well to the 4H. Once drilling was complete the well was loaded with 12 lb. oil based mud and a retrievable plug was set in the intermediate casing. No violations were noted at time of inspection. |
2760473 | Primary Facility | 2018-08-06 | Routine/Complete Inspection | No Violations Noted | Weather was 74 degrees and sunny at time of inspection. Met with Rockdale Marcellus representative Danny Brooks. Well was shut in at time of inspection. Cellar conditions did not appear to have changed from previous inspection. Conducted a walk around inspection of location. No violations noted at time of inspection. |
2762762 | Primary Facility | 2018-08-13 | Routine/Complete Inspection | No Violations Noted | Weather was 66° and raining at time of inspection. Met with Rockdale Marcellus representative Danny Brooks. Rig was in the process of drilling the 8 1/2" hole for the production casing. They were expecting to TD later this evening and were estimating to cement the production casing later on 8/14/2018. Conducted a walk around inspection of location. No violations were noted at time of inspection. |
2763039 | Primary Facility | 2018-08-01 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 8/1/2018.
I entered the site at 10:30 and inspected the stormwater controls along the access road. The area is well vegetated and temporary E&S controls are in the process of being removed. On the well pad, I talked to Mr. Carrasco (rig manager) from Patterson -UTI and we walked the site. At the time of the inspection, the BOP stack was installed on the Guillaume 6H (117-22003) but flow line was not yet connected. The derrick was up but cuttings management/backyard is still being rigged-up. Containment is in good condition and the wooden rig mats are also in good condition. Drilling additives and potential contaminants are stored in containment or have additional individual containment/cover. After walking the site, I talked to Danny Brooks (company man) and discussed the containment, maintenance, and the other two wells planned for the site. Overall, the site is in good condition. No violations noted. |
2765043 | Primary Facility | 2018-08-20 | Routine/Complete Inspection | No Violations Noted | Weather was 66° and cloudy at time of inspection. Met with Rockdale Marcellus representative Jim Tracey. At time of inspection well had been completed to TD. A nightcap was installed on the well and the rig skidded over to the 2H to complete it. Reviewed the cement job log from the production casing and no discrepancies we noted. Conducted a walk around inspection of location. No violations were noted at time of inspection. |
2771414 | Primary Facility | 2018-09-06 | Routine/Complete Inspection | No Violations Noted | Weather was 77° and sunny at time of inspection. Met with Rockdale Marcellus representative Levi Lee on location. Well was shut in at time of inspection. There were no annulus vents plumbed to surface at time of inspection. Crews were on location preparing it for stimulation operations. Conducted a walk around inspection of location. No violations noted at time of inspection. |
2778819 | Primary Facility | 2018-09-24 | Routine/Complete Inspection | No Violations Noted | Weather was 62° and partly sunny at time of inspection. Met with Rockdale Marcellus representative Luke on location. Well was shut in at time of inspection. There were no annulus vents plumbed to surface at time of inspection. Crews were on location preparing it for stimulation operations. Conducted a walk around inspection of location. No violations noted at time of inspection. |
2811838 | Primary Facility | 2018-11-29 | Routine/Complete Inspection | No Violations Noted | On 11/29/18 an inspection was conducted to assess site conditions and to check on the progress of the cleanup of a spill reported on 10/24/18 (CTS# 337795). No Rockdale reps were present upon arrival on location. At the time of the inspection, fracing operations had been completed & the wells were flowing back. A small battery of tanks on secondary containment were present near the well heads. The secondary containment from the frac had already been removed. A large aboveground storage tank (AST) is present on the NE corner of the pad. The tank is double-walled and plastic-lined. The SE corner of the pad was being excavated at the time of the inspection. Adjacent to this area of excavation were multiple roll-off containers containing excavated soil. In another area between the frac tank battery near the well heads & the AST, 2 more roll-off boxes were present. A separate area appeared to have been excavated adjacent to the AST on the NW side. Several puddles were present all over the pad & most but not all w |
For data sources see[6]