X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-20273"

m
m
Line 323: Line 323:
 
|-
 
|-
 
| 2017
 
| 2017
| [[ANADARKO E&P ONSHORE LLC]]
+
| [[ARD OPR LLC]]
 
| style="text-align: right;" | 285,868.03
 
| style="text-align: right;" | 285,868.03
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 359: Line 359:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 364: Line 365:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 78.57 Tons
 
| style="text-align: right;" | 78.57 Tons
Line 370: Line 372:
 
| THR029
 
| THR029
 
|-
 
|-
| 2012-S02
+
| 2012
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 155.04 Bbl
 
| style="text-align: right;" | 155.04 Bbl
Line 376: Line 379:
 
|  
 
|  
 
|-
 
|-
| 2013-S01
+
| 2013
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 264.08 Bbl
+
| style="text-align: right;" | 545.66 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2013-S02
+
| 2014
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 281.58 Bbl
+
| style="text-align: right;" | 417.06 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-S01
+
| 2015
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 231.45 Bbl
+
| style="text-align: right;" | 154.00 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
|  
+
| WMGR119
 
|-
 
|-
| 2014-S02
+
| 2015
| Produced Fluid (in Barrels)
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 185.61 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-S01
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 87.55 Bbl
 
| style="text-align: right;" | 87.55 Bbl
Line 406: Line 407:
 
|  
 
|  
 
|-
 
|-
| 2015-S02
+
| 2016
| Produced Fluid (in Barrels)
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 154.00 Bbl
+
| Produced Fluid (in Barrels) RWC 802
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 149.00 Bbl
| WMGR119
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW005
 
|-
 
|-
| 2016-M09
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 27.51 Bbl
+
| style="text-align: right;" | 20.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2016-M10
+
| 2016
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 24.00 Bbl
+
| style="text-align: right;" | 51.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
| 2016-M11
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 27.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|
 
|-
 
| 2016-M12
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 5.00 Bbl
 
| style="text-align: right;" | 5.00 Bbl
Line 436: Line 435:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2016-M12
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[ANADARKO E&P ONSHORE LLC]]
| style="text-align: right;" | 20.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2016-S01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 149.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW005
 
|-
 
| 2016-S02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 32.00 Bbl
+
| style="text-align: right;" | 59.51 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2017-M02
+
| 2017
 +
| [[ARD OPR LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 25.00 Bbl
+
| style="text-align: right;" | 126.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC010
+
| WMGR123NW005
 
|-
 
|-
| 2017-M04
+
| 2017
 +
| [[ANADARKO E&P ONSHORE LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 25.00 Bbl
+
| style="text-align: right;" | 50.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2017-M05
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 27.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 24.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 26.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 24.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
|-
 
| 2018-M01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 15.76 Bbl
+
| style="text-align: right;" | 63.47 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M04
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 11.83 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 11.51 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 11.24 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M11
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 13.43 Bbl
 
| style="text-align: right;" | 13.43 Bbl
Line 526: Line 470:
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2018-M12
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[ARD OPR LLC]]
| style="text-align: right;" | 13.13 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 13.07 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M03
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 13.00 Bbl
+
| style="text-align: right;" | 26.07 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  

Revision as of 17:16, 21 August 2019

Well Details

Well ID: 37-081-20273
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: McHenry Township
Operator Name: ARD OPR LLC
Well Pad ID: 148062
Farm/Lease Name: COP TRACT 289 C 1014H
License Status: Active
Spud Date: 2010-06-16
Permit Date: 2010-03-19
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.385869
Longitude: -77.511997

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-02-01 2011-02-01 8012.00 4,555,878.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00246000
HAI-OS ACID INHIBITOR Halliburton Energy Services Corrosion Inhibitor Methanol 67-56-1 60.00 0.00032000
Propargyl alcohol 107-19-7 10.00 0.00005000
Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 12.79
CS-39 Halliburton Energy Services Clay Stabilizer Water 7732-18-5 60.00 0.08
Chloride 16887-00-6 30.00 0.04
Proprietary poly electrolyte 40.00 0.05
Proprietary inorganic chemical 20.00 0.02
Acid, Hydrochloric (7.5) Halliburton Energy Services Solvent Hydrochloric acid 7647-01-0 7.50 0.04
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100.00 86.32
GBW-30 BREAKER Halliburton Energy Services Gelling Agent Hemicellulase enzyme 9012-54-8 15.00 0.00001000
Carbohydrates 95.00 0.00008000
LGC-36 UC Halliburton Energy Services Liquid Gel Concentrate Guar gum 9000-30-0 60.00 0.00686000
Naphtha, petroleum, hydrotreated heavy 64742-48-9 60.00 0.00686000
LCA-1 Solvent Halliburton Energy Services Solvent Paraffinic solvent 100.00 0.00216000
BE-9M Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00185000
Methanol 67-56-1 30.00 0.00554000
SP Halliburton Energy Services Gel Breaker Sodium persulfate 7775-27-1 100.00 0.00008000
FDP-S944-09 Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 1,174,553.00 276 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 762,726.00 366 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 706,803.00 362 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 479,085.00 365 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 369,477.00 304 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 337,933.00 366 0.00 0 0.00 0
2017 ARD OPR LLC 285,868.03 365 0.00 0 0.00 0
2018 ARD OPR LLC 252,722.21 364 0.00 0 0.00 0
2019 ARD OPR LLC 57,163.81 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings (in Tons) 78.57 Tons LANDFILL THR029
2012 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 155.04 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 545.66 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 417.06 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 154.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) 87.55 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 149.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 51.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 59.51 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2017 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 126.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ANADARKO E&P ONSHORE LLC Produced Fluid (in Barrels) RWC 802 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 63.47 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 13.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid (in Barrels) RWC 802 26.07 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1920700 Primary Facility 2010-10-18 Routine/Partial Inspection No Violations Noted
1924288 Primary Facility 2010-10-25 Follow-up Inspection No Violations Noted
1939184 Primary Facility 2010-12-22 Routine/Partial Inspection No Violations Noted
1945755 Primary Facility 2011-01-26 Routine/Partial Inspection No Violations Noted
1951175 Primary Facility 2011-02-11 Follow-up Inspection No Violations Noted
1963796 Primary Facility 2011-03-25 Routine/Partial Inspection No Violations Noted
1966019 Primary Facility 2011-04-12 Routine/Partial Inspection No Violations Noted
1977743 Primary Facility 2011-06-03 Follow-up Inspection No Violations Noted
1994524 Primary Facility 2011-08-02 Routine/Partial Inspection No Violations Noted
2026877 Primary Facility 2011-12-06 Routine/Complete Inspection No Violations Noted
2075155 Primary Facility 2012-05-25 Routine/Partial Inspection No Violations Noted Site has achieved 70% veg. cover
2176945 Primary Facility 2013-06-20 Routine/Complete Inspection No Violations Noted
2487030 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted
2797221 Primary Facility 2018-10-30 Routine/Complete Inspection No Violations Noted On October 30, 2018, Department representative Brad Kline conducted a routine site inspection at ARD Operating LLC. COP Tract 289 Pad C. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.

There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 GPU’s and 2 steel vertical production fluids tanks onsite. Both GPUs and production fluid tanks were stationed in secondary containment.

No violations noted.

For data sources see[7]

References