X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-031-25335"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-031-25335
 
| Well ID: 37-031-25335
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.083139, -79.472222 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.083139, -79.472222 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Toby Township,_Clarion_County,_Pennsylvania|Toby Township]]
 
| Municipality: [[Toby Township,_Clarion_County,_Pennsylvania|Toby Township]]
 
|-
 
|-
| Operator Name: [[PENNSYLVANIA MINERAL SVC]]
+
| Operator Name: [[PA MINERAL SVCS LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 09/26/2011
+
| Spud Date: 2011-09-26
 
|-
 
|-
| Permit Date: 1/6/2010
+
| Permit Date: 2010-01-06
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 86:
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[INTERSTATE GAS MKT INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
| style="text-align: right;" |
+
| [[INTERSTATE GAS MKT INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 83: Line 108:
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 151: Line 176:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 156: Line 182:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-0
+
| 2012
 +
| [[INTERSTATE GAS MKT INC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 100.00 Bbl
+
| style="text-align: right;" | 1,130.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095273
+
| PA0095443
 
|-
 
|-
| 2012-0
+
| 2012
 +
| [[INTERSTATE GAS MKT INC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 1,130.00 Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095443
+
| PA0095273
 
|-
 
|-
| 2013-0
+
| 2013
 +
| [[INTERSTATE GAS MKT INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
Line 193: Line 222:
 
| 2007247
 
| 2007247
 
| Primary Facility
 
| Primary Facility
| 09/27/2011
+
| 2011-09-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 200: Line 229:
 
| 2008524
 
| 2008524
 
| Primary Facility
 
| Primary Facility
| 10/03/2011
+
| 2011-10-03
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 207: Line 236:
 
| 2008558
 
| 2008558
 
| Primary Facility
 
| Primary Facility
| 09/30/2011
+
| 2011-09-30
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 214: Line 243:
 
| 2012798
 
| 2012798
 
| Primary Facility
 
| Primary Facility
| 10/18/2011
+
| 2011-10-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 221: Line 250:
 
| 2014012
 
| 2014012
 
| Primary Facility
 
| Primary Facility
| 10/04/2011
+
| 2011-10-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 228: Line 257:
 
| 2014014
 
| 2014014
 
| Primary Facility
 
| Primary Facility
| 10/25/2011
+
| 2011-10-25
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - Viols Req'd
 
| Outstanding Violations - Viols Req'd
Line 235: Line 264:
 
| 2035951
 
| 2035951
 
| Primary Facility
 
| Primary Facility
| 01/11/2012
+
| 2012-01-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 242: Line 271:
 
| 2051295
 
| 2051295
 
| Primary Facility
 
| Primary Facility
| 03/14/2012
+
| 2012-03-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 249: Line 278:
 
| 2102680
 
| 2102680
 
| Primary Facility
 
| Primary Facility
| 09/20/2012
+
| 2012-09-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 275: Line 304:
 
| 623208
 
| 623208
 
| 10/04/2011
 
| 10/04/2011
| 03/14/2012
+
| 2011-10-04
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 283: Line 312:
 
| 623209
 
| 623209
 
| 10/04/2011
 
| 10/04/2011
| 03/14/2012
+
| 2011-10-04
 
| 102.22 - Failure to achieve permanent stabilization of earth disturbance activity.
 
| 102.22 - Failure to achieve permanent stabilization of earth disturbance activity.
 
| Administrative
 
| Administrative
Line 291: Line 320:
 
| 623210
 
| 623210
 
| 10/25/2011
 
| 10/25/2011
| 03/14/2012
+
| 2011-10-25
 
| 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102.
 
| 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102.
 
| Administrative
 
| Administrative
Line 299: Line 328:
 
| 623211
 
| 623211
 
| 10/25/2011
 
| 10/25/2011
| 03/14/2012
+
| 2011-10-25
 
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 
| Administrative
 
| Administrative
Line 321: Line 350:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/15/2013
+
| 2013-08-15
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 329: Line 358:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 08/15/2013
+
| 2013-08-15
| 08/15/2013
+
| 2013-08-15
 
| style="text-align: right;" | $16,620.00
 
| style="text-align: right;" | $16,620.00
 
| style="text-align: right;" | $16,620.00
 
| style="text-align: right;" | $16,620.00
Line 339: Line 368:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/15/2013
+
| 2013-08-15
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 347: Line 376:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 08/15/2013
+
| 2013-08-15
| 08/15/2013
+
| 2013-08-15
 
| style="text-align: right;" | $16,620.00
 
| style="text-align: right;" | $16,620.00
 
| style="text-align: right;" | $16,620.00
 
| style="text-align: right;" | $16,620.00
Line 357: Line 386:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/15/2013
+
| 2013-08-15
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 365: Line 394:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 08/15/2013
+
| 2013-08-15
| 08/15/2013
+
| 2013-08-15
 
| style="text-align: right;" | $16,620.00
 
| style="text-align: right;" | $16,620.00
 
| style="text-align: right;" | $16,620.00
 
| style="text-align: right;" | $16,620.00
Line 377: Line 406:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 19:44, 21 August 2019

Well Details

Well ID: 37-031-25335
Loading map...
Country: United States
State: Pennsylvania
County: Clarion
Municipality: Toby Township
Operator Name: PA MINERAL SVCS LLC
Well Pad ID:
Farm/Lease Name: C & K 91
License Status: Active
Spud Date: 2011-09-26
Permit Date: 2010-01-06
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.083139
Longitude: -79.472222

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 INTERSTATE GAS MKT INC 0.00 0 0.00 0 0.00 0
2011 INTERSTATE GAS MKT INC 0.00 0 0.00 0 0.00 0
2012 INTERSTATE GAS MKT INC 2,066.00 300 0.00 0 0.00 0
2013 INTERSTATE GAS MKT INC 12,763.20 365 0.00 0 0.00 0
2014 INTERSTATE GAS MKT INC 8,407.00 365 0.00 0 0.00 0
2015 INTERSTATE GAS MKT INC 5,750.30 365 0.00 0 0.00 0
2016 INTERSTATE GAS MKT INC 6,241.00 365 0.00 0 0.00 0
2017 INTERSTATE GAS MKT INC 7,821.00 365 0.00 0 0.00 0
2018 INTERSTATE GAS MKT INC 5,949.37 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 INTERSTATE GAS MKT INC Fracing Fluid Waste (in Barrels) 1,130.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012 INTERSTATE GAS MKT INC Fracing Fluid Waste (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 INTERSTATE GAS MKT INC Produced Fluid (in Barrels) 50.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2007247 Primary Facility 2011-09-27 Routine/Complete Inspection No Violations Noted
2008524 Primary Facility 2011-10-03 Drilling/Alteration No Violations Noted
2008558 Primary Facility 2011-09-30 Drilling/Alteration No Violations Noted
2012798 Primary Facility 2011-10-18 Routine/Complete Inspection No Violations Noted
2014012 Primary Facility 2011-10-04 Routine/Complete Inspection Violation(s) Noted
2014014 Primary Facility 2011-10-25 Compliance Evaluation Outstanding Violations - Viols Req'd
2035951 Primary Facility 2012-01-11 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2051295 Primary Facility 2012-03-14 Routine/Complete Inspection No Violations Noted
2102680 Primary Facility 2012-09-20 Routine/Complete Inspection No Violations Noted
2530273 Primary Facility 2016-10-21 Administrative/File Review No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2014012 623208 10/04/2011 2011-10-04 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
2014012 623209 10/04/2011 2011-10-04 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. Administrative
2014014 623210 10/25/2011 2011-10-25 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. Administrative
2014014 623211 10/25/2011 2011-10-25 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
623208 286323 NOV - Notice of Violation Comply/Closed 2013-08-15
623208 300945 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-08-15 2013-08-15 $16,620.00 $16,620.00
623209 286323 NOV - Notice of Violation Comply/Closed 2013-08-15
623209 300945 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-08-15 2013-08-15 $16,620.00 $16,620.00
623211 286323 NOV - Notice of Violation Comply/Closed 2013-08-15
623211 300945 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-08-15 2013-08-15 $16,620.00 $16,620.00

For data sources see[6]

References