If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Knox_County,_Ohio|Knox]] | | County: [[Knox_County,_Ohio|Knox]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Monroe_Township,_Knox_County,_Ohio|Monroe Township]] |
|- | |- | ||
| Operator Name: [[BI JOE DEVELOPMENT INC]] | | Operator Name: [[BI JOE DEVELOPMENT INC]] |
Well ID: 34-083-24225 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.443008648,"lon":-82.40982606,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Monroe Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: GAMBIER DEVELOPMENT INC UNIT | |
License Status: Producing | |
License Date: 2004-07-22 | |
Spud Date: 2005-06-16 | |
Spud Drilling Contractor: PINNACLE DRILLING | |
Final Drill Date: 2005-06-22 | |
Well Total Depth: 4524 ft | |
Configuration: Vertical | |
Latitude: 40.443008648 | |
Longitude: -82.40982606 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2004-07-22 | Proposed Formations:TREMPEALEAU, Issued Date:7/22/2004, Expired Date:7/22/2005 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2005-06-16 | RBDMS Rec |
Completed | 2005-06-22 | RBDMS Rec |
Reached Total Depth | 2005-06-22 | RBDMS Rec |
Construction Permit Expires | 2005-07-22 | RBDMS Rec |
Completion Report Received | 2005-08-25 | RBDMS Rec |
Correction to Well | 2011-07-01 | REDUCED DRILLING UNIT TO 32 ACRES. |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2005-10-26 | 4402 | 4486 | 44 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 3000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2005 | BI JOE DEVELOPMENT INC | 547 | 1776 | 187 |
2006 | BI JOE DEVELOPMENT INC | 1048 | 1697 | 365 |
2007 | BI JOE DEVELOPMENT INC | 816 | 1352 | 365 |
2008 | BI JOE DEVELOPMENT INC | 328 | 824 | 365 |
2009 | BI JOE DEVELOPMENT INC | 307 | 850 | 365 |
2010 | BI JOE DEVELOPMENT INC | 31 | 678 | 365 |
2011 | BI JOE DEVELOPMENT INC | 17 | 655 | 365 |
2012 | BI JOE DEVELOPMENT INC | 237 | 506 | 366 |
2013 | BI JOE DEVELOPMENT INC | 13 | 516 | 365 |
2014 | BI JOE DEVELOPMENT INC | 12 | 323 | 365 |
2015 | BI JOE DEVELOPMENT INC | 36 | 509 | 365 |
2016 | BI JOE DEVELOPMENT INC | 30 | 324 | 365 |
2017 | BI JOE DEVELOPMENT INC | 125 | 318 | 365 |
2018 | BI JOE DEVELOPMENT INC | 116 | 321 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | BI JOE DEVELOPMENT INC | Brine | 220 | 187 |
2006 | BI JOE DEVELOPMENT INC | Brine | 290 | 365 |
2007 | BI JOE DEVELOPMENT INC | Brine | 235 | 365 |
2008 | BI JOE DEVELOPMENT INC | Brine | 499 | 365 |
2009 | BI JOE DEVELOPMENT INC | Brine | 50 | 365 |
2010 | BI JOE DEVELOPMENT INC | Brine | 170 | 365 |
2011 | BI JOE DEVELOPMENT INC | Brine | 200 | 365 |
2012 | BI JOE DEVELOPMENT INC | Brine | 145 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 175 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 140 | 365 |
2015 | BI JOE DEVELOPMENT INC | Brine | 285 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 185 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 230 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1372019433 | 2005-06-23 | Production Wells | No Violations | Drilling is done and well is going to be produced but no pumping unit has been installed yet. Pits are still open and filled with fluid. |
1601481060 | 2013-04-25 | Preliminary Restoration | No Violations | This well is a producing well. |
1767894273 | 2005-07-05 | Production Wells | No Violations | Well will be produced but no pumping unit in place yet. Pits are being filled with dozer. Conductor pipe has void around it. Mentioned it to Joe Cross of BiJoe and he said they would fill in with concrete. |
For data sources see[9]