If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Muskingum_County,_Ohio|Muskingum]] | | County: [[Muskingum_County,_Ohio|Muskingum]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Meigs_Township,_Muskingum_County,_Ohio|Meigs Township]] |
|- | |- | ||
| Operator Name: [[AM-TEK OIL INC]] | | Operator Name: [[AM-TEK OIL INC]] |
Well ID: 34-119-24418 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.780980308,"lon":-81.80937398,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Meigs Township | |
Operator Name: AM-TEK OIL INC | |
Well Pad ID: | |
Farm/Lease Name: WILLISTON OIL & DEVELOPMENT CORP | |
License Status: Producing | |
License Date: 1978-09-27 | |
Spud Date: 1978-09-24 | |
Spud Drilling Contractor: | |
Final Drill Date: 1978-09-28 | |
Well Total Depth: 1521 ft | |
Configuration: Vertical | |
Latitude: 39.780980308 | |
Longitude: -81.80937398 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1978-09-24 | |
Completed | 1978-09-28 | |
Reached Total Depth | 1978-09-28 | |
CO | 1985-01-10 | 412 GEM ENERGY CORP |
Change of Owner | 2006-03-15 | Operator changed from 412, GEM ENERGY CORP to 1, HOPEWELL OIL & GAS |
Change of Owner | 2007-12-06 | Operator changed from 001, HOPEWELL OIL & GAS DEVELOPMENT to 3388, ADAMS JM ROUSTABOUT/PIPE |
Change of Owner | 2010-07-21 | Operator changed from 3388, ADAMS JM ROUSTABOUT/PIPE to 7859, MALLET LUKE-DBA MALLET ENERGY |
Change of Owner | 2017-05-03 | Operator changed from 7859, MALLETT LUKE-DBA MALLET ENERGY to 9651, AM-TEK OIL INC |
Record Last Modified | 2017-05-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 1382 | 1446 | 12 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | HOPEWELL OIL & GAS DEVELOPMENT | 0 | 0 | 365 |
2008 | J M ADAMS ROUSTABOUT PIPE | 0 | 0 | 0 |
2009 | J M ADAMS ROUSTABOUT PIPE | 83 | 10 | 275 |
2010 | MALLETT LUKE-DBA MALLETT ENERG | 94 | 36 | 275 |
2011 | MALLETT LUKE-DBA MALLETT ENERG | 346 | 26 | 365 |
2012 | MALLETT LUKE-DBA MALLETT ENERG | 399 | 105 | 366 |
2013 | MALLETT LUKE-DBA MALLETT ENERG | 298 | 31 | 365 |
2014 | MALLETT LUKE-DBA MALLETT ENERG | 553 | 77 | 365 |
2015 | MALLETT LUKE-DBA MALLETT ENERG | 401 | 48 | 365 |
2016 | MALLETT LUKE-DBA MALLETT ENERG | 220 | 41 | 365 |
2017 | AM-TEK OIL INC | 141 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2008 | J M ADAMS ROUSTABOUT PIPE | Brine | 0 | 0 |
2009 | J M ADAMS ROUSTABOUT PIPE | Brine | 271 | 275 |
2010 | J M ADAMS ROUSTABOUT PIPE | Brine | 35 | 90 |
2011 | MALLETT LUKE-DBA MALLETT ENERG | Brine | 612 | 365 |
2012 | MALLETT LUKE-DBA MALLETT ENERG | Brine | 498 | 366 |
2013 | MALLETT LUKE-DBA MALLETT ENERG | Brine | 10 | 365 |
2014 | MALLETT LUKE-DBA MALLETT ENERG | Brine | 5 | 365 |
2015 | MALLETT LUKE-DBA MALLETT ENERG | Brine | 5 | 365 |
2016 | MALLETT LUKE-DBA MALLETT ENERG | Brine | 0 | 365 |
2017 | AM-TEK OIL INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1446751684 | 2015-11-05 | Production Wells | No Violations | On the day of my inspection I found that the wellhead was equipped with a pumping unit. The motor was intact, the valves were open and the well was pumping at the time of my inspection. The tank battery consisted of four 100 barrel tanks, one vertical separator, one horizontal separator and an earthen dike. Identification was posted at the wellhead and tank battery. I found no leaks or spills. The well was located 57 meters from the GPS coordinates in RBDMS. |
For data sources see[9]