If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Licking_County,_Ohio|Licking]] | | County: [[Licking_County,_Ohio|Licking]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Fallsbury_Township,_Licking_County,_Ohio|Fallsbury Township]] |
|- | |- | ||
| Operator Name: [[KENOIL LLC]] | | Operator Name: [[KENOIL LLC]] |
Well ID: 34-089-26116 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.21178981,"lon":-82.23578099,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Fallsbury Township | |
Operator Name: KENOIL LLC | |
Well Pad ID: | |
Farm/Lease Name: PORTER | |
License Status: Producing | |
License Date: 2012-10-15 | |
Spud Date: 2012-11-03 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2012-11-07 | |
Well Total Depth: 3286 ft | |
Configuration: Vertical | |
Latitude: 40.211789810 | |
Longitude: -82.23578099 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-10-15 | Proposed Formations:CLINTON, Issued Date:10/15/2012, Expired Date:10/15/2014 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2012-11-02 | CORRECTION TO CASING PROGRAM. |
Reached Total Depth | 2012-11-07 | |
Completion Report Received | 2013-02-14 | |
Construction Permit Expires | 2014-10-15 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-02-21 | 3080 | 3120 | 67 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-12-13 | H2O | 15 | 1800 Bbl | 40000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | KENOIL LLC | 0 | 752 | 365 |
2014 | KENOIL LLC | 0 | 558 | 365 |
2015 | KENOIL LLC | 0 | 306 | 365 |
2016 | KENOIL LLC | 0 | 81 | 365 |
2017 | KENOIL LLC | 0 | 145 | 365 |
2018 | KENOIL LLC | 0 | 188 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | KENOIL LLC | Brine | 925 | 365 |
2014 | KENOIL LLC | Brine | 300 | 365 |
2015 | KENOIL LLC | Brine | 130 | 365 |
2016 | KENOIL LLC | Brine | 160 | 365 |
2017 | KENOIL LLC | Brine | 150 | 365 |
2018 | KENOIL LLC | Brine | 60 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0603367476 | 2017-10-26 | Production Wells | No Violations | This inspection was conducted as a status check. The well was equipped with a pumping unit and motor. The tank battery consists of (3) 100 barrel tanks and a separator within an earthen dike. Identification was observed at the well and tank battery. No violations. Time of inspection: 10:00 AM. Weather: 37*F, Sunny |
1339480379 | 2012-11-04 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 8 inch surface casing for Kenoil on Poulson Drillings rotary rig. John w/ Kenoil was on location. Petroset Cementing was contracted to cement the casing. Circulation was established and cement returned to the surface. A cement basket was not used. |
1366827092 | 2012-11-03 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the conductor casing for Kenoil on Poulson Drillings rig. Circulation was established and cement returned to the surface. |
1436380726 | 2013-11-18 | Preliminary Restoration | No Violations | This inspection was conducted as a preliminary restoration status check. The well was equipped with a pumping unit and motor. It was not pumping during inspection. The area around the well has been restored. The tank battery consists of (3) 100 barrel tanks and gas separator inside an earthen dike. Identification was posted at the tank battery and wellhead. Restoration meets ORC 1509.072. |
1666073336 | 2012-11-06 | Drill / Deepen / Reopen | No Violations | PDC drilling during inspection. Depth approximately 2500 feet. No violations during inspection. |
For data sources see[9]