Line 11: Line 11:
 
| County: [[Coshocton_County,_Ohio|Coshocton]]
 
| County: [[Coshocton_County,_Ohio|Coshocton]]
 
|-
 
|-
| Municipality: [[Jackson Township,_Coshocton_County,_Ohio|Jackson Township]]
+
| Municipality: [[Jackson_Township,_Coshocton_County,_Ohio|Jackson Township]]
 
|-
 
|-
 
| Operator Name: [[JOHN  F WILLIAMS OIL FIELD SER]]
 
| Operator Name: [[JOHN  F WILLIAMS OIL FIELD SER]]
Line 33: Line 33:
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: <Latitude>
+
| Latitude: 40.239949304
 
|-
 
|-
 
| Longitude: -81.89844264
 
| Longitude: -81.89844264

Revision as of 13:14, 30 August 2019

Well Details

Well ID: 34-031-27203
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Jackson Township
Operator Name: JOHN F WILLIAMS OIL FIELD SER
Well Pad ID:
Farm/Lease Name: MAGNESS ELEANOR
License Status: Producing
License Date: 2012-08-16
Spud Date: 2012-09-11
Spud Drilling Contractor: MARIC DRILLING CO.
Final Drill Date: 2013-01-12
Well Total Depth: 4046 ft
Configuration: Vertical
Latitude: 40.239949304
Longitude: -81.89844264

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-08-16 Proposed Formations:CLINTON, Issued Date:8/16/2012, Expired Date:8/16/2014 12:00:00 PM, Drilling unit acres:117.26, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2012-08-24 CORRECTION TO CASING PROGRAM.
Reached Total Depth 2013-01-12
Completion Report Received 2013-02-28
Construction Permit Expires 2014-08-16
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-03-04 3970 3978 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-10-29 H2O 15 1050 Bbl 17500 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 JOHN F WILLIAMS OIL FIELD SER 1084 332 365
2014 JOHN F WILLIAMS OIL FIELD SER 2504 151 365
2015 JOHN F WILLIAMS OIL FIELD SER 2273 67 365
2016 JOHN F WILLIAMS OIL FIELD SER 2634 112 365
2017 JOHN F WILLIAMS OIL FIELD SER 2130 108 365
2018 JOHN F WILLIAMS OIL FIELD SER 2068 71 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 JOHN F WILLIAMS OIL FIELD SER Brine 22 365
2014 JOHN F WILLIAMS OIL FIELD SER Brine 0 365
2015 JOHN F WILLIAMS OIL FIELD SER Brine 0 365
2016 JOHN F WILLIAMS OIL FIELD SER Brine 0 365
2017 JOHN F WILLIAMS OIL FIELD SER Brine 0 365
2018 JOHN F WILLIAMS OIL FIELD SER Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0108808592 2012-09-11 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Maric Drilling was drilling on fluid at a depth of 384. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills.
0255013535 2012-09-18 Drill / Deepen / Reopen No Violations On the day of my inspection Maric Drilling ran 4.5 casing to 4033 cemented with 140 sacks class A by Petroset. Good circulation was maintained throughout the job. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills.
0956584276 2012-10-16 Drill / Deepen / Reopen No Violations On the day of my inspection I found that sack cement had been mixed and poured down the annulus of the 8.625 casing and 11 hole to fill it to surface from the bridge depth of approximately 20. The pits were still open and there were no sags or tears in the pit liners.
1186098361 2012-09-12 Drill / Deepen / Reopen No Violations On the day of my inspection Petroset started pumping cement down the annulus of the 8.625 casing and 11 hole. The annulus bridged off within 5 minutes of starting the job. Attempts were made to clear the bridge, but were unsuccessful. Appalachian Well Surveys ran a bond log, which showed that there was good cement bond from 672 to 98. Petroset conducted a pressure test of the casing at 300 psi for 30 minutes. The casing passed the pressure test and Maric Drilling was cleared to continue drilling. They will attempt to cement the remaining 98 of open 8.625 casing at a later stage in well construction.
1346962127 2012-09-06 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the location had been excavated and the pits were dug. No drilling equipment was on location.
1348242902 2012-09-17 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Maric Drilling was drilling on fluid at a depth of 3671. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills.
1349106227 2012-09-24 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the pit were still open. The fluid level was approximately 18 from surface and there were no sags or tears in the pit liners. The well head was shut in with a 4.5 bull plug, and there were no leaks or spills. The drilling rig was no longer on location. Some drilling equipment remained.
1483704917 2012-09-10 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Maric Drilling was rigged up, the pits and flow ditch were lined, and there was new 8.625 casing on the rack. The permit was in the doghouse and there were no leaks or spills. The well was not spudded at the time of my inspection.
1717091810 2012-09-11 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Maric Drilling drilled an 11 surface hole on fluid to 732. They ran 8.625 casing to 672. The hole was circulating with the mud pump when I arrived. Petroset broke circulation, pumped 400 lbs. gel, 100 lbs cotton seed hulls and 260 sack of class A cement. Good circulation was maintained throughout the job and cement was circulated to surface. When Petroset stopped pumping the cement immediately fell down the hole. The height of the cement could not be determined from surface. A collective decision was made to let the cement set overnight and come back in 8 hours to fill from the surface.
1822336479 2013-07-03 Preliminary Restoration No Violations On the day of my inspection I found that the well site was graded out and 90% covered with well established grasses and field vegetation. The leases road was graveled all the way back to the well. The well head was equipped with a pumping unit and connected to a tank battery that consisted of one 210 barrel stock tank, one 100 barrel brine tank, one separator and an earthen dike. Proper identification was posted and there were no leaks or spills. This well site passes preliminary restoration.
2075161272 2012-09-14 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Maric Drilling was drilling on fluid at a depth of 2180. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills.
2114814888 2016-05-23 Production Wells No Violations On the day of my inspection I found that the well was being produced with an electric powered pumping unit. The valves were open on the tubing and casing lines. The gauges showed 25 psi. gas pressure. The tank battery consisted of one 210 barrel steel tank, one 100 barrel steel tank, one vertical separator and meter box. An earthen dike was in place around the production equipment. Identification was posted at the tank battery. I found no leaks or spills at the wellhead or production equipment.

For data sources see[9]

References