If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Ashtabula_County,_Ohio|Ashtabula]] | | County: [[Ashtabula_County,_Ohio|Ashtabula]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Saybrook_Township,_Ashtabula_County,_Ohio|Saybrook Township]] |
|- | |- | ||
| Operator Name: [[TUSSEL CLARENCE JR]] | | Operator Name: [[TUSSEL CLARENCE JR]] |
Well ID: 34-007-24166 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.861569879,"lon":-80.8555964,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashtabula | |
Municipality: Saybrook Township | |
Operator Name: TUSSEL CLARENCE JR | |
Well Pad ID: | |
Farm/Lease Name: UNIVERSAL IMPROVEMENT CO | |
License Status: Producing | |
License Date: 1999-09-24 | |
Spud Date: 1999-09-27 | |
Spud Drilling Contractor: PEP DRLG | |
Final Drill Date: 1999-10-11 | |
Well Total Depth: 5020 ft | |
Configuration: Vertical | |
Latitude: 41.861569879 | |
Longitude: -80.85559640 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1999-09-24 | Proposed Formations:ROSE RUN, Issued Date:9/24/99, Expired Date:9/23/2000 6:00:00 AM, Drilling unit acres:42, Proposed Well Type:OG, Proposed Well Class:EDPW |
Original Spud | 1999-09-27 | RBDMS Rec |
Completed | 1999-10-11 | RBDMS Rec |
Reached Total Depth | 1999-10-11 | RBDMS Rec |
Completion Report Received | 2000-09-11 | RBDMS Rec |
Construction Permit Expires | 2000-09-23 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1999 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2000 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2001 | TUSSEL CLARENCE JR | 0 | 0 | 365 |
2002 | TUSSEL CLARENCE JR | 0 | 0 | 365 |
2003 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2004 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2005 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2011 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2012 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2013 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2014 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2015 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2016 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2017 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
2018 | TUSSEL CLARENCE JR | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1999 | TUSSEL CLARENCE JR | Brine | 1134 | 0 |
2000 | TUSSEL CLARENCE JR | Brine | 54 | 0 |
2001 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
2002 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
2003 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2004 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2005 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2011 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2012 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2013 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2014 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2015 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2016 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2017 | TUSSEL CLARENCE JR | Brine | 0 | 0 |
2018 | TUSSEL CLARENCE JR | Brine | 0 | 0 |