If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Mahoning_County,_Ohio|Mahoning]] | | County: [[Mahoning_County,_Ohio|Mahoning]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Beaver_Township,_Mahoning_County,_Ohio|Beaver Township]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-099-22359 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.975073323,"lon":-80.66575472,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Beaver Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: DANDON INC UNIT | |
License Status: Producing | |
License Date: 1989-10-16 | |
Spud Date: 1989-10-18 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1989-10-25 | |
Well Total Depth: 5902 ft | |
Configuration: Vertical | |
Latitude: 40.975073323 | |
Longitude: -80.66575472 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1989-10-16 | Issued Date 10/16/89 Expired Date 10/16/90 Acres 0040018 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05902 Proposed Drill Depth 05902 |
Original Spud | 1989-10-17 | |
Completed | 1989-10-25 | |
Reached Total Depth | 1989-10-25 | |
CO | 1989-11-27 | 84 EVERFLOW EASTERN PTNS L P GeoDate 10/16/89 |
Completion Report Received | 1989-11-29 | |
Construction Permit Expires | 1990-10-16 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5628 | 5752 | 0 |
2006-09-11 | 5630 | 5708 | 50 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 118000 Gal | 80000 | FRAC:WATER&SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000PL12482 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0350757127 | 2010-08-02 | Production Wells | No Violations | I performed a random field inspection. I GPSd both the tank battery and the wellhead. I continued to walk around both the wellhead and the tank battery. This inspection satisfies 1501:9-9-05. There were no violations at this time. |
1211510040 | 2005-12-22 | Production Wells | No Violations | The tank battery is shared with permit 2222 and consists of 1-100 bbl storage tank, 2-separators and a dike. |
For data sources see[9]