If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 9: | Line 9: | ||
| State: Ohio | | State: Ohio | ||
|- | |- | ||
− | | County: | + | | County: [[Wayne_County,_Ohio|Wayne]] |
|- | |- | ||
− | | Municipality: [[Salt | + | | Municipality: [[Salt Creek_Township,_Wayne_County,_Ohio|Salt Creek Township]] |
|- | |- | ||
| Operator Name: [[RHDK OIL & GAS LLC/DBA RED HIL]] | | Operator Name: [[RHDK OIL & GAS LLC/DBA RED HIL]] |
Well ID: 34-169-24815 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.673186578,"lon":-81.79189045,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Salt Creek Township | |
Operator Name: RHDK OIL & GAS LLC/DBA RED HIL | |
Well Pad ID: | |
Farm/Lease Name: MILLER R | |
License Status: Producing | |
License Date: 1990-11-06 | |
Spud Date: 1990-11-13 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1990-11-20 | |
Well Total Depth: 6417 ft | |
Configuration: Vertical | |
Latitude: 40.673186578 | |
Longitude: -81.79189045 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1990-11-06 | 168 RED HILL DEVELOPMENT GeoDate 11/6/90 |
Oil and Gas | 1990-11-06 | Issued Date 11/6/90 Expired Date 11/6/91 Acres 0082230 Tool Type RTAF Proposed Formation CL/ROSE RUN Proposed Depth 06417 Proposed Drill Depth 06417 |
Original Spud | 1990-11-12 | |
Completed | 1990-11-20 | |
Plugged/Abandoned | 1990-11-20 | |
Reached Total Depth | 1990-11-20 | |
Completion Report Received | 1991-05-28 | |
Construction Permit Expires | 1991-11-06 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3898 | 3978 | 0 |
2006-09-11 | 3938 | 3971 | 6 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 79581 Gal | 0 | 79,581 GAL SLICKWATER FRAC |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000008057 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 6/14/92 INSPECTOR GREGORY, HAROLD DATE 06/1419/92 DATA FROM OLD VAX INFO | |
0050321037 | 2012-12-07 | Production Wells | No Violations | This is a producing swab well. There were no problems noted at the time of the inspection. |
0316049974 | 2013-04-11 | Production Wells | No Violations | This is a producing plunger lift well. No violations noted at this time. |
1260115550 | 2017-06-20 | Production Wells | No Violations | Inspected production well on 06/20/2017. The tank battery consists of 1-210 bbl steel tank, 1-horizontal separator, 1-drip, 1-meter, and 1-meter box, located within an earthen dike; the diked area is located within barbed-wire fencing. Well identification is clearly displayed at the tank battery. The well is a rabbit well, located within barbed-wire fencing. No problems were noted at the time of the inspection. |
2013078151 | 2017-06-20 | Preliminary Restoration | No Violations | Inspected production well on 06/20/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
For data sources see[9]