X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-081-20776"

m
m
Line 11: Line 11:
 
| County: [[Jefferson_County,_Ohio|Jefferson]]
 
| County: [[Jefferson_County,_Ohio|Jefferson]]
 
|-
 
|-
| Municipality: [[Smithfield Township,_Jefferson_County,_Ohio|Smithfield Township]]
+
| Municipality: [[Smithfield_Township,_Jefferson_County,_Ohio|Smithfield Township]]
 
|-
 
|-
 
| Operator Name: [[ASCENT RESOURCES UTICA LLC]]
 
| Operator Name: [[ASCENT RESOURCES UTICA LLC]]
Line 211: Line 211:
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 100
 
|-
 
|-
| Poly(oxy-1,2-ethanediyl),.alpha.-tridecyl-.omega.-hydroxy-,branched
+
| Poly(oxy-1,2-ethanediyl),.alpha.-tridecyl-.omega.-hydroxy-,branche
 +
Poly(oxy-1,2-ethanediyl),.alpha.-tridecyl-.omega.-hydroxy-,branched
 
| 69011-36-5
 
| 69011-36-5
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 5

Revision as of 16:10, 31 August 2019

Well Details

Well ID: 34-081-20776
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Smithfield Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001567
Farm/Lease Name: GENO W SMF JF
License Status: Well Drilled
License Date: 2018-09-25
Spud Date: 2018-08-08
Spud Drilling Contractor: XTREME DRILLING
Final Drill Date: 2018-11-11
Well Total Depth: 24560 ft
Configuration: Horizontal
Latitude: 40.276098854
Longitude: -80.81767374

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-08-03 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:8/3/2018, Expired Date:8/2/2020 12:00:00 PM, Drilling unit acres:83.181, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2018-09-25 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:9/25/2018, Expired Date:9/24/2020 12:00:00 PM, Drilling unit acres:392.09, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-11-11
Record Last Modified 2019-04-02
Correction to Well 2019-04-26 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Construction Permit Expires 2020-09-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/06/2019 02/21/2019 9366 27,688,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Produced Water Operator Base Fluid Water 7732-18-5 100 0.173757 453671
CALCIUM CHLORIDE - FLAKE Halliburton Additive Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.648537 1,693,300.0
Gel 1100 Mountain Supply & Services Additive Listed Below Listed Below 0 0 0
SCALECHEK LP-50 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
FIGHTR EC-3 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-30/70 Halliburton Proppant Listed Below Listed Below 0 0 0
Sobitan, mono-9-octadecenoate, (Z) 1338-43-8 5 0.000748786 1956
Hydrochloric acid 7647-01-0 15 0.093639 244487
Calcium chloride 10043-52-4 100 0.00003830 100
Poly(oxy-1,2-ethanediyl),.alpha.-tridecyl-.omega.-hydroxy-,branche

Poly(oxy-1,2-ethanediyl),.alpha.-tridecyl-.omega.-hydroxy-,branched

69011-36-5 5 0.00150492 3930
Propargyl alcohol 107-19-7 5 0.00002334 61
Potassium chloride 7447-40-7 5 0.00000192 6
Emulsifier 9002-92-0 10 0.00009807 257
Sodium chloride 7647-14-5 30 0.0124312 32458
Ethoxylated alcohol Proprietary 5 0.00152826 3991
Sodium perborate tetrahydrate 10486-00-7 100 0.0015713 4103
Acrylamide polymer Proprietary 30 0.00449272 11731
Ammonium chloride 12125-02-9 5 0.00207174 5410
Hydrotreated light petroleum distillate 64742-47-8 30 0.0259527 67763
Citric acid 77-92-9 60 0.00202014 5275
Methanol 67-56-1 100 0.00709693 18531
Modified thiourea polymer Proprietary 30 0.000140021 366
Sodium sulfate 7757-82-6 0.1 0.00000001 1
Phosphate of a Diamine, Sodium Salt Proprietary 30 0.0066302 17312
Polymer Not assigned 68 0.000666884 1742
pH Buffer 8055-55-8 15 0.000147107 385
Sodium nitrate 7631-99-4 60 0.0155989 40729
Polyoxyalkylene Proprietary 5 0.000748786 1956
Sodium persulfate 7775-27-1 100 0.00000938 25
Crystalline silica, quartz 14808-60-7 100 10.884 28,417,600.0
9-Octadecenamide,n,n-bis-2(hydroxy-ethyl)-,(Z) 93-83-4 5 0.00207174 5410
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00207174 5410
Strontium chloride 10476-85-4 5 0.00000192 6
SAND-COMMON WHITE - 100 MESH Halliburton Proppant Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 88.1769 230,226,000.0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
LD-2950 MultiChem Friction Reducer Listed Below Listed Below 0 0 0
FDP-S1296-17 Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
LD-2850 MultiChem Friction Reducer Listed Below Listed Below 0 0 0
SP BREAKER Halliburton Breaker Listed Below Listed Below 0 0 0
MC MX 8-4743 MultiChem Biocide Listed Below Listed Below 0 0 0
OptiKleen-WF(TM) Halliburton Concentrate Listed Below Listed Below 0 0 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0166966929 2019-03-12 Completion Testing No Violations The inspection revealed that the well is currently awaiting drill-out operations. The surface annulus pressure is at 0 psi and the intermediate annulus pressure is at 700 psi.
0328775064 2018-10-26 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Akita 803 (formerly Xtreme) drilling a 12.25 inch diameter hole on air. Current depth is 7540 feet. Estimated total depth of this section is around 8600 feet. Company man Matt Miller believes they should be cementing the two stage 9.625 inch diameter casing, l-80, 40#/ft on Sunday. Well bore is not making noticable quantities of gas or water.
0424182573 2018-08-09 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Precision Rathole had augered a 36 inch diameter hole to a depth of 102 feet. Well was spudded 8/8/18.
0427512320 2018-10-30 Casing String Witnessed No Violations On the day of my inspection I witnessed the intermediate casing cement job. Akita 803 (formerly Xtreme) drilled a 12.25 inch diameter open hole to a depth of 8584 feet. Previous casing set and cemented was 13.375 inch diameter surface casing to a depth of 1461 feet. Wyoming Casing ran 8583 feet of 9.625 inch diameter casing, l-80, 40 lbs/foot. Casing was centralized every joint. Shoe track is 88 feet long. Schlumberger was onsite with 534 sacks of class A lead cement and 742 class A tail cement. Lead cement weighed with mudscale at 13.5 ppg and yield of 1.67. 35 excess ran in open hole. Cement displaced with 645 barrels. 40 barrels of 13 ppg mudpush spacer pumped ahead of cement. Open DV tool and circulate. No barrels of spacer or cement to surface on first stage
0563230404 2019-01-29 Completion Testing No Violations On the day of my inspection I witnessed a Halliburton frac crew on location. Stage 33 was the last stage completed on this well. Plug was set at 18827, with bottom perfs at 18816 and top perfs at 18501. Intermediate annular pressure was 600.
0826695610 2019-01-16 Completion Testing No Violations On the day of my inspection I found a Halliburton frac crew on lcoation, They are tied into all three wells of the pad (1, 3, and 5). Stage 18 on this well was just perforated. Plug was set at 21467, with bottom perfs at 21455 and top perfs at 21360. Stage design is 350000 lbs of sand. Intermediate annular pressure is 450.
1119819736 2019-01-22 Completion Testing No Violations On the day of my inspection I witnessed a Halliburton frac crew on location. Wireline set stage 22 plug at 20763, with bottom perfs at 20762 and top perfs at 20611. They are currently pumping an injection test on the 1H well. The design stage was 350000 lbs of sand but it sanded off after 223180 lbs of sand. Break down pressure was 8781 at 15 barrels per minute (BPM). Max rate was 78 bpm and max pressure was 12368. Average rate was 70 bpm and average pressure was 10095. They pumped 2500 gallons of 7.5% HCl on the frac. On the injection text they pumped 2000 gallons of 7.5% HCL. Intermediate annular pressure is 372.
1496064694 2019-02-13 Completion Testing No Violations The day of inspection revealed that Halliburton service company has fraced 66 stages and ran wireline to set 67 stage plug at 12,843 feet. The intermediate casing annulus pressure is at 700 psi and the surface annulus pressure is at 0 psi.
1535348690 2018-08-27 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1471 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 1465 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with a 4 foot stick up. Casing was centralized with 13 centralizers. Shoe track is 43 feet long. CJ/Otex was onsite with 1535 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 40% excess ran in open hole. Cement displaced with 216 barrels of fresh water. 35barrels of gel and 10 barrels of water pumped ahead of cement. 55 barrels of cement returned to surface, and floats held with 1 barrel back.

For data sources see[4]

References