X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-013-20785"

m
m
Line 11: Line 11:
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
|-
 
|-
| Municipality: [[Washington Township,_Belmont_County,_Ohio|Washington Township]]
+
| Municipality: [[Washington_Township,_Belmont_County,_Ohio|Washington Township]]
 
|-
 
|-
 
| Operator Name: [[XTO ENERGY INC.]]
 
| Operator Name: [[XTO ENERGY INC.]]

Revision as of 17:29, 31 August 2019

Well Details

Well ID: 34-013-20785
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: XTO ENERGY INC.
Well Pad ID: US-OH-001051
Farm/Lease Name: PAVICH UNIT
License Status: Producing
License Date: 2015-11-04
Spud Date: 2015-05-14
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-07-18
Well Total Depth: 17327 ft
Configuration: Horizontal
Latitude: 39.862552362
Longitude: -80.92186967

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-10 Proposed Formations:POINT PLEASANT, Issued Date:6/10/2014, Expired Date:6/9/2016 12:00:00 PM, Drilling unit acres:615.076, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2015-07-17 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Reached Total Depth 2015-07-18
Correction to Well 2015-08-28 UPDATE TO SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
APP 2015-11-04 Proposed Formations:POINT PLEASANT, Issued Date:11/4/2015, Expired Date:11/3/2017 12:00:00 PM, Drilling unit acres:182.352, Proposed Well Type:OG, Proposed Well Class:EDPW
Completion Report Received 2016-10-05
Record Last Modified 2017-10-23
Construction Permit Expires 2017-11-03

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/04/2016 02/23/2016 10361 12,828,500.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Clay Stabilizer, Cla-Chek G Shrieve Clay Stabilizer Listed Below
Hydrochloric Acid (15%) Axiall Acidizing
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Listed Below
Sand (Proppant) Universal Proppant Listed Below
Hydrochloric Acid 7647-01-0 15 0.12603 152963
Ammonium Acetate 631-61-8 13 0.00876 10629
Water 7732-18-5 85 1.3475 1,635,460.0
Alcohols, Ethoxylated 68551-12-2 5 0.00337 4088
Hydrochloric Acid 7647-01-0 15 0.05945 72152
Titanium Oxide 13463-67-7 0.1 0.01008 12238
Ethoxylated Alcohol 68002-97-1 35 0.00048 582
Short Chained Glycol Ether 112-34-5 60 0.00082 998
Choline Chloride 67-48-1 75 0.01771 21495
Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.02021 24529
Polyethylene Glycol 25322-68-3 50 0.00508 6165
Triethanolamine Tri(Phosphate Ester), Sodium 68171-29-9 30 0.00567 6885
Ethylene Glycol 107-21-1 30 0.00567 6885
Methanol 67-56-1 5 0.00007000 83
Guar Gum 9000-30-0 95 0.00458 5563
Alcohols, Ethoxylated 68439-50-9 5 0.00337 4088
Hydrochloric Acid 7647-01-0 15 0.05231 63494
Water 7732-18-5 30 0.00305 3699
2,2,-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.00203 2466
Formaldehyde 50-00-0 1 0.00001000 17
Thiourea 62-56-6 1 0.00001000 17
Aluminum Oxide 1344-28-1 0.8 0.08067 97906
Alcohols, Ethoxylated 68002-97-1 5 0.00337 4088
Water 7732-18-5 15 0.00354 4299
Crystalline Silica (quartz) 14808-60-7 99.9 10.0734 12,226,100.0
Ammonium Persulfate 7727-54-0 100 0.00006000 75
Acetophenone 98-86-2 1 0.00001000 17
Iron Oxide 1309-37-1 0.1 0.01008 12238
Unigel 5F Universal Viscosifier Listed Below
K-BAC 1020 WST Biocide Listed Below
Water XTO Carrier/Base Fluid 7732-18-5 88.2049
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Listed Below
Hydrochloric Acid (15%) Jones Hamilton Acidizing
AP Breaker United Initiators Gel Breaker Listed Below
Hydrochloric Acid (15%) PVS Acidizing Listed Below
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Listed Below

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-02-23 H2O 0 9246 Bbl 337300 Universal Well Services Inc. STAGE 32/32

48 SHOTS

2016-02-04 H2O 0 9279 Bbl 379700 Universal Well Services Inc. STAGES 1/32

48 SHOTS STAGES 2-31 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 XTO ENERGY INC. 1599170 0 153
2017 XTO ENERGY INC. 2910176 0 352
2018 XTO ENERGY INC. 903944 0 224
2019 XTO ENERGY INC. 176945 0 81

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 XTO ENERGY INC. Brine 27599 153
2017 XTO ENERGY INC. Brine 35440 352
2018 XTO ENERGY INC. Brine 12787 224
2019 XTO ENERGY INC. Brine 14643 81

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0184970528 2015-07-06 Drill / Deepen / Reopen No Violations Patterson Rig 294 has reached total depth. They will be running and cementing their 9.625 casing to a depth of 8894.
0560923131 2015-05-14 Casing String Witnessed No Violations On the date of inspection I am on site to witness the cementing of the conductor pipe. I was informed by XTO consultant Paul Hahn that Express Energy Services had drilled a 36 inch diameter hole to a depth of 100 feet. Express set 30 inch diameter, 126lbs/ft conductor pipe on bottom. Express pumped 275sk of Class A cement, 15.6ppg, 1.18 yield, 2% CaCl2, and 0.50lbs/sk of flo-seal. Express displaced with 75bbl of fresh water. 20bbl of cement returned to surface and stayed at surface while I was on site.
0596813359 2016-02-01 Preliminary Restoration No Violations On this day this site appeared to be in satisfactory condition. Erosion and sediment controls are in place and functioning properly. Preliminary Restoration for this site has passed.
1275629000 2018-08-01 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a four-string casing design, 5.5-inch diameter production casing and 2.875 inch diameter tubing that appeared to be open flowing with no artificial lift technology. Annular pressure monitoring was in place on both the 13.325-inch diameter surface casing and the 9.625-inch diameter deep intermediate casing, pressures were monitored with transducers with no ability to read pressures at the well head. Both casings had bleed down lines ran to the production fluid tanks, at the time of my inspection the 13.375-inch diameter casing was open flowing into tanks through a choke manifold. Production equipment included a Gas Processing Unit, that was inside of containment. There were also 4- 400-barrel production fluid tanks inside containment. Production fluid tanks were all shared with 34013207850000. A 500 barrel frack tank was on location and no longer hooked up to the wells. Identification tags were present, and production was up to date. No violations were found at the time of my inspection.
1332129054 2019-02-25 Production Wells No Violations Status check inspection found 4 wells total on the well pad with all 4 wells now in production. The said well is equipped with a lower A and upper B section with annular pressure monitoring in place on each well. The well is producing off a production tree. (2) Production facilities are present on the pad with the facility associated with the said well being equipped with (4) steel 400 barrel capacity tanks situated inside a polymer lined steel containment dike area. No perimeter earthen berm is present around the pad. Identification is posted on the well head. The lease road and well pad surface are stone construction and in good repair.
1434111902 2015-06-07 Casing String Witnessed No Violations
1562684165 2016-01-27 Completion Testing No Violations I received a call from Stan Lower of XTO. He informed me that the toe prep was now finished on this location and he would be continuing with completion operations.
1666467594 2017-10-31 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains four 400-barrel production fluid holding tanks. Production records for this well are current to 2017 within RBDMS.

For data sources see[9]

References