If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Pickaway_County,_Ohio|Pickaway]] | | County: [[Pickaway_County,_Ohio|Pickaway]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Jackson_Township,_Pickaway_County,_Ohio|Jackson Township]] |
|- | |- | ||
| Operator Name: [[MARKSMEN ENERGY USA INC]] | | Operator Name: [[MARKSMEN ENERGY USA INC]] |
Well ID: 34-129-20243 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.617647105,"lon":-83.04139149,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Pickaway | |
Municipality: Jackson Township | |
Operator Name: MARKSMEN ENERGY USA INC | |
Well Pad ID: | |
Farm/Lease Name: Bj-78 | |
License Status: Producing | |
License Date: 2014-06-03 | |
Spud Date: 2014-09-23 | |
Spud Drilling Contractor: G & L DRILLING | |
Final Drill Date: 2014-09-27 | |
Well Total Depth: 2500 ft | |
Configuration: Vertical | |
Latitude: 39.617647105 | |
Longitude: -83.04139149 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-06-03 | Proposed Formations:TRENTON, BLACK RIVER, TREMPEALEAU, Issued Date:6/3/2014, Expired Date:6/2/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-09-27 | |
Completion Report Received | 2014-11-26 | |
Construction Permit Expires | 2016-06-02 | |
Change of Owner | 2017-01-04 | Operator changed from 6227, HOUGHTON INVESTMENTS LLC to 9491, MARKSMEN ENERGY USA INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-11-28 | 2412 | 2416 | 13 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-10-06 | ACID | 15 | 420 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HOUGHTON INVESTMENTS LLC | 0 | 318 | 56 |
2015 | HOUGHTON INVESTMENTS LLC | 0 | 893 | 56 |
2016 | HOUGHTON INVESTMENTS LLC | 0 | 689 | 56 |
2017 | MARKSMEN ENERGY USA INC | 0 | 0 | 0 |
2018 | MARKSMEN ENERGY USA INC | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HOUGHTON INVESTMENTS LLC | Brine | 7904 | 56 |
2015 | HOUGHTON INVESTMENTS LLC | Brine | 0 | 56 |
2016 | HOUGHTON INVESTMENTS LLC | Brine | 0 | 56 |
2017 | MARKSMEN ENERGY USA INC | Brine | 0 | 0 |
2018 | MARKSMEN ENERGY USA INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0036970593 | 2019-01-14 | Production Wells | No Violations | My inspection revealed this well does not have an accurate identifiction. I spoke with well tender Mr. Bob Atha who said the identification would be corrected by 1.15.19. |
0610573863 | 2014-09-23 | Drill / Deepen / Reopen | No Violations | - On site for drilling progress, Rig moved on location 9/22/2014
- Spudded 9/23/14 depth 140 feet. |
0695668318 | 2014-12-04 | Preliminary Restoration | No Violations | - On site for Preliminary Restoration, all drilling equipment has been removed. Pits have been filled in and the area graded back into agricultural farm ground.
- Tank battery consist of two 210 barrel fiberglass tanks, earthen dike is constructed lined with plastic and is covered with crushed aggregates, dike is free of debris and water. - Well has an electric motor Miller pump install on well head, operation during inspection. - No ID posted at tanks or well, met with operator and will post as soon as possible. |
1079086622 | 2018-12-26 | Production Wells | No Violations | My inspection revealed this well consists of a wellhead with an electric pump attached to the wellhead. This well is not connected to a tank battery. The well is not capable of production. The identification is not accurate. The identification lists Houghton Investment as the owner of the well. The owner of the well shall place a legible identification at the wellhead. |
1411512961 | 2014-09-23 | Drill / Deepen / Reopen | No Violations | - On site for conductor casing cementing
- G&L Drill contractor, Formation Cementing doing cementing - - Good circulation when pumping cement |
1411658213 | 2014-09-25 | Casing String Witnessed | No Violations | - On site for surface casing cementing.
- - One joint of casing threads stripped, call Tech Star to deliver new replacement casing, 2 centralizers used - Formation Cementing Inc. for cementing job. Good circulation when pumping, 120 Sks of cement |
1548354835 | 2019-01-24 | Production Wells | No Violations | My inspection of this well revealed the well now has a accurate and legible identification. This satisfies the compliance notice. |
1784823950 | 2014-09-30 | Drill / Deepen / Reopen | No Violations | - Well was TD 9/27/2014
- - GPS well N 39.61771 W 083.02354 acc. 8 - Pits are still open; most of the water has been pumped out and hauled off site. |
For data sources see[9]