X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-21775"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-21775
 
| Well ID: 37-125-21775
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.194194, -80.369333 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.194194, -80.369333 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: JOSEPH P. BIGHAM 026
 
| Farm/Lease Name: JOSEPH P. BIGHAM 026
 
|-
 
|-
| License Status: Plugged OG Well
+
| License Status: Plugged and Abandoned
 
|-
 
|-
 
| Spud Date: 1995-01-11
 
| Spud Date: 1995-01-11
 
|-
 
|-
 
| Permit Date: 1994-10-05
 
| Permit Date: 1994-10-05
 +
|-
 +
| Well Type: INJECTION
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.194194
 
| Latitude: 40.194194
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1994-10-05
 +
| New Permit Application
 +
|-
 +
| 1995-01-11
 +
| Performed Spud Operation
 +
|-
 +
| 1995-01-17
 +
| Drilling Completion
 +
|-
 +
| 1995-04-13
 +
| Perforation
 +
|-
 +
| 1995-04-13
 +
| Performed Stimulation 
 +
|-
 +
| 1996-03-25
 +
| NEWLY DRILLED
 +
|-
 +
| 2016-12-14
 +
| Begin Plugging
 +
|-
 +
| 2017-01-04
 +
| Finished Plugging
 +
|-
 +
| 2019-03-05
 +
| Fully Plugged
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 74: Line 116:
 
|}-->
 
|}-->
  
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 1995-04-13
 +
| style="text-align: right;" |
 +
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 131: Line 196:
 
|-
 
|-
 
| 2001
 
| 2001
| [[EAST RESOURCES INC]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 140: Line 205:
 
|-
 
|-
 
| 2002
 
| 2002
| [[EAST RESOURCES INC]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 149: Line 214:
 
|-
 
|-
 
| 2003
 
| 2003
| [[EAST RESOURCES INC]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 158: Line 223:
 
|-
 
|-
 
| 2005
 
| 2005
| [[EAST RESOURCES INC]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 167: Line 232:
 
|-
 
|-
 
| 2006
 
| 2006
| [[EAST RESOURCES INC]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 176: Line 241:
 
|-
 
|-
 
| 2007
 
| 2007
| [[EAST RESOURCES INC]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 185: Line 250:
 
|-
 
|-
 
| 2008
 
| 2008
| [[EAST RESOURCES INC]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0

Revision as of 06:04, 15 May 2020

Well Details

Well ID: 37-125-21775
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Blaine Township
Operator Name: DALLAS ENERGY LLC
Well Pad ID:
Farm/Lease Name: JOSEPH P. BIGHAM 026
License Status: Plugged and Abandoned
Spud Date: 1995-01-11
Permit Date: 1994-10-05
Well Type: INJECTION
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.194194
Longitude: -80.369333

For data sources see[1][2][3]

Well History

Date Event
1994-10-05 New Permit Application
1995-01-11 Performed Spud Operation
1995-01-17 Drilling Completion
1995-04-13 Perforation
1995-04-13 Performed Stimulation
1996-03-25 NEWLY DRILLED
2016-12-14 Begin Plugging
2017-01-04 Finished Plugging
2019-03-05 Fully Plugged

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
1995-04-13 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1996 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1997 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1998 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1999 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
2000 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
2001 0.00 0 0.00 0 0.00 0
2002 0.00 0 0.00 0 0.00 0
2003 0.00 0 0.00 0 0.00 0
2005 0.00 0 0.00 0 0.00 0
2006 0.00 0 0.00 0 0.00 0
2007 0.00 0 0.00 0 0.00 0
2008 0.00 0 0.00 0 0.00 0
2010 EAST RESOURCES MGMT LLC 0.00 0 0.00 0 0.00 0
2011 SWEPI LP 0.00 0 0.00 0 0.00 0
2012 SWEPI LP 0.00 0 0.00 0 0.00 0
2013 SWEPI LP 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 0.00 0 0.00 0 0.00 0
2015 SWEPI LP 0.00 0 0.00 0 0.00 0
2016 SWEPI LP 0.00 0 0.00 0 0.00 0
2017 SWEPI LP 0.00 0 0.00 0 0.00 0

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2543866 Primary Facility 2016-12-07 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Visited site before plugging operations. Moderately sloping pasture.
2547578 Primary Facility 2016-12-19 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ pumped bottom hole cement plug from 2560'-1560' (calculated), 76 sacks of cement. WOC. Tagged TOC @ 1880'. Laying down cement string.
2549533 Primary Facility 2017-01-04 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ has begun rigging down after tagging final cement plug @ 25 feet. Will top off cement to surface.
2602887 Primary Facility 2017-06-05 Plugging(Includes Plugged/Mined Through) In Compliance with Policy The delayed reclamation of site (per landowner request) by ConServ is completed - mulched & seeded.
2608913 Primary Facility 2017-01-24 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Per landowner request, ConServ will not be reclaiming the site until better weather in the spring. All equipment has been removed. E&S controls are in place and the fence has been replaced.
2608914 Primary Facility 2017-03-28 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Site remains to be reclaimed due to landowner's request to wait for dry weather.
765629 Primary Facility 1994-10-17 Routine/Complete Inspection No Violations Noted TO BE PLUGGED; E&S OK
765839 Primary Facility 1994-11-08 Drilling/Alteration No Violations Noted AT 92'; E&S, PITS OK

For data sources see[7]

References