If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 310: | Line 310: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Wells]] |
Well ID: 37-003-21285 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.513248,"lon":-79.715066,"icon":""}]} |
Operator Name: PENNECO OIL CO INC | |
First Permit Date: 1991-08-14 | |
Last Permit Date: 1991-08-14 | |
Spud Date: 1991-10-18 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.513248 | |
Longitude: -79.715066 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 6299.0 | 365.0 | 0.0 | 0.0 | 17.21 | 365.0 |
2012-0 | 2846.0 | 183.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 5790.0 | 365.0 | 0.0 | 0.0 | 64.28 | 365.0 |
2010-0 | 6471.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 5772.0 | 365.0 | 0.0 | 0.0 | 94.0 | 365.0 |
2008-0 | 2581.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2007-0 | 3914.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2006-0 | 4498.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2005-0 | 5694.0 | 365.0 | 0.0 | 0.0 | 54.8 | 365.0 |
2004-0 | 6457.0 | 365.0 | 0.0 | 0.0 | 74.97 | 365.0 |
2003-0 | 7384.0 | 365.0 | 0.0 | 0.0 | 43.0 | 365.0 |
2002-0 | 8143.0 | 365.0 | 0.0 | 0.0 | 55.93 | 365.0 |
2001-0 | 8259.0 | 366.0 | 0.0 | 0.0 | 67.0 | 366.0 |
2000-0 | 9313.0 | 365.0 | 0.0 | 0.0 | 55.23 | 365.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | PRODUCED FLUID | 15.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
214289 | 1992-02-05 | Violation(s) Noted | ACCESS ROAD UNSTABLE;DRILLED | 95614 |
214376 | 1992-03-04 | Violation(s) Noted | RD UNSTABLE-NOV SENT | 96389 |
214422 | 1992-04-01 | Violation(s) Noted | ROAD UNSTABLE-NOV SENT | 96444 |
214483 | 1992-04-30 | Violation(s) Noted | ROAD UNSTABLE-NOV SENT | 96977 |
214611 | 1992-06-02 | No Violations Noted | E&S OK | |
214664 | 1992-06-25 | No Violations Noted | DISCUSSING CORRECTIONS | |
214713 | 1992-07-15 | No Violations Noted | ROAD STABLE | |
214915 | 1992-08-26 | No Violations Noted | E&S, TANKS OK | |
215799 | 1994-03-02 | No Violations Noted | E&S OK; TWO TANKS | |
220037 | 1998-03-11 | No Violations Noted | E&S ADEQUATE | |
2001755 | 2011-08-16 | No Violations Noted | THE WELL HAS DUMP AND TWO TANKS. THE ANULUS IS OPEN.
THE SITE IS RESTORED. ACCESS STONED AND GATED. |
|
2054219 | 2012-02-29 | No Violations Noted | THIS IS A WELL MAINTAINED, PRODUCING GAS WELL. THE ANULUS IS OPEN.
THE SITE IS RESTORED. |
|
2081761 | 2012-07-03 | No Violations Noted | John Ley WQS SWRO was on site to conduct a site inspection. The site sign was properly displayed and the E&S plan was on site. The Erosion and Sediment Pollution Control Program Manual, pg. 30 states "Rock filters are not required where roadway surface is stabilized, ditches are provided with protective liners, and cut banks are stabilized."
The attached pictures show that none of the banks along the access road have been stabilized. At a minimum, the banks should be stabilized (i.e. seeded and mulched) to help prevent erosion of the ditches themselves and excess sedimentation. In addition to the road banks needing stabilized by seeding and mulching, the entire site (banks and fill) needs to be stabilized. The picture showing the staining on the pit sidewalls, shows that at one time there was less than the required 2 feet of freeboard, as required by the regulations. The photo shows there is now the 2' of freeboard, but this 2' of freeboard should always be maintained, at all times. |
|
2116690 | 2012-10-22 | No Violations Noted | WELL MAINTAINED WELL WITH TWO TANKS. THE SITE IS RESTORED. | |
2167322 | 2013-05-13 | Allegheny | Plum Boro | No Violations Noted |