Well ID: 37-003-22104 | |
Operator Name: PENNECO OIL CO INC | |
First Permit Date: 2010-01-27 | |
Last Permit Date: 2010-01-27 | |
Spud Date: 2010-03-01 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.491491 | |
Longitude: -79.715644 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 1682.0 | 365.0 | 0.0 | 0.0 | 25.33 | 365.0 |
2012-0 | 3625.0 | 366.0 | 0.0 | 0.0 | 291.63 | 366.0 |
2011-0 | 3603.0 | 365.0 | 0.0 | 0.0 | 245.21 | 365.0 |
2010-0 | 1862.0 | 245.0 | 0.0 | 0.0 | 286.68 | 245.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 75.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
2010-0 | FRACING FLUID WASTE | 740.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD013826847 | MCCUTCHEON ENTERPRISE | APOLLO | PA |
2010-0 | PRODUCED FLUID | 50.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 75.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1869584 | 2010-03-08 | No Violations Noted | 3379'. SITE, PIT, E&S, AND ACCESS, OK. | |
1869586 | 2010-03-03 | No Violations Noted | HILL DRILLING AT 807'. | |
1882819 | 2010-04-02 | No Violations Noted | WELL COMPLETE. EQUIPTMENT WORKING TO RESTORE SITE. | |
1882866 | 2010-04-15 | No Violations Noted | SITE GRADED AND DIKES ARE CONSTRUCTED FOR TANKS. ACCESS AND E&S OK. | |
1884484 | 2010-04-30 | No Violations Noted | TANKS ARE SET, AND THE SITE IS RESTORED. | |
1927774 | 2010-10-05 | No Violations Noted | COMBO OIL AND GAS WELL. TANKS ARE DIKED. ALL EQUIPTMENT FENCED. | |
1983141 | 2011-05-18 | No Violations Noted | OIL & GAS WELL. ALL EQUIPT FENCED AND LOCKED.
SITE IS RESTORED. |
|
1984906 | 2011-06-01 | No Violations Noted | On June 1st , 2010 I conducted a routine inspection of the above site. The well was in production. The site was restored. The access road was in good condition. A well tag was secured to the well. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of the inspection. The site was well vegetated | |
2116549 | 2012-10-25 | No Violations Noted | PRODUCING OIL AND GAS WELL. TANKS ARE DIKED AND THE SITE IS RESTORED.ALL EQUIPTMENT IS FENCED AND LOCKED. |