X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0505111206022"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0505111206022
 
| Well ID: 0505111206022
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.299373, -115.481103 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.299373, -115.481103 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/06-12-050-11W5/2
 
| Location: 02/06-12-050-11W5/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 02/06-12-050-11 W5/02
 
| Location Alias 2: 02/06-12-050-11 W5/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 050
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 11
 +
|-
 +
| Section: 12
 
|-
 
|-
 
| County/Municipality: [[Brazeau County,_Alberta|Brazeau County]]
 
| County/Municipality: [[Brazeau County,_Alberta|Brazeau County]]
Line 17: Line 27:
 
| Well Name: KEYERA PEMBINA 6-12-50-11
 
| Well Name: KEYERA PEMBINA 6-12-50-11
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Keyera Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0073756
 
| License Number: 0073756
Line 29: Line 39:
 
| Final Drill Date: 1979-03-11
 
| Final Drill Date: 1979-03-11
 
|-
 
|-
| Well Total Depth: 2876 m
+
| Well Total Depth: 2876.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.299373
 
| Surface Hole Latitude: 53.299373
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1979-01-03
 +
| Obtained License
 +
|-
 +
| 1979-03-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1979-03-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1979-03-11
 +
| Finished Drilling
 +
|-
 +
| 1979-03-11
 +
| Well Log Performed
 +
|-
 +
| 1979-03-11
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1979-03-14
 +
| Production Casing Operation Performed
 +
|-
 +
| 1979-04-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-04-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-04-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-04-06
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-04-06
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-04-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-04-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-04-07
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-04-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-07-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-07-18
 +
| Well Began Production
 +
|-
 +
| 1981-07-18
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1981-07-18
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1982-03-03
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1982-03-03
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1982-05-15
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1982-05-18
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1982-05-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-05-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1982-05-19
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1982-05-19
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1982-05-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-05-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1985-08-16
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1985-08-16
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1985-08-16
 +
| Plug Back Performed
 +
|-
 +
| 1985-08-22
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1985-08-22
 +
| Plug Back Performed
 +
|-
 +
| 1985-08-22
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1985-08-22
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1992-03-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1992-03-24
 +
| Perforation Treatment Performed - Chemical Squeeze
 +
|-
 +
| 1998-08-11
 +
| Well Log Performed
 +
|-
 +
| 1998-08-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-08-12
 +
| Well Log Performed
 +
|-
 +
| 1998-08-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 228:
 
| 1979-04-03
 
| 1979-04-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2785
+
| style="text-align: right;" | 2785.00
| style="text-align: right;" | 2790
+
| style="text-align: right;" | 2790.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1979-04-05
 
| 1979-04-05
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2785
+
| style="text-align: right;" | 2785.00
| style="text-align: right;" | 2790
+
| style="text-align: right;" | 2790.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-04-05
 
| 1979-04-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2730
+
| style="text-align: right;" | 2730.00
| style="text-align: right;" | 2731
+
| style="text-align: right;" | 2731.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1979-04-06
 
| 1979-04-06
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2730
+
| style="text-align: right;" | 2730.00
| style="text-align: right;" | 2731
+
| style="text-align: right;" | 2731.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-04-06
 
| 1979-04-06
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2730
+
| style="text-align: right;" | 2730.00
| style="text-align: right;" | 2731
+
| style="text-align: right;" | 2731.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-04-06
 
| 1979-04-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2694
+
| style="text-align: right;" | 2694.00
| style="text-align: right;" | 2695
+
| style="text-align: right;" | 2695.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1979-04-06
 
| 1979-04-06
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2694
+
| style="text-align: right;" | 2694.00
| style="text-align: right;" | 2695
+
| style="text-align: right;" | 2695.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-04-07
 
| 1979-04-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2694
+
| style="text-align: right;" | 2694.00
| style="text-align: right;" | 2695
+
| style="text-align: right;" | 2695.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-04-07
 
| 1979-04-07
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2694
+
| style="text-align: right;" | 2694.00
| style="text-align: right;" | 2695
+
| style="text-align: right;" | 2695.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-04-12
 
| 1979-04-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2746
+
| style="text-align: right;" | 2746.00
| style="text-align: right;" | 2752
+
| style="text-align: right;" | 2752.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1981-07-18
 
| 1981-07-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2700
+
| style="text-align: right;" | 2700.00
| style="text-align: right;" | 2706
+
| style="text-align: right;" | 2706.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1982-05-15
 
| 1982-05-15
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2700
+
| style="text-align: right;" | 2700.00
| style="text-align: right;" | 2706
+
| style="text-align: right;" | 2706.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-05-18
 
| 1982-05-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2700
+
| style="text-align: right;" | 2700.00
| style="text-align: right;" | 2706
+
| style="text-align: right;" | 2706.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1982-05-18
 
| 1982-05-18
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2700
+
| style="text-align: right;" | 2700.00
| style="text-align: right;" | 2706
+
| style="text-align: right;" | 2706.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-05-19
 
| 1982-05-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2700
+
| style="text-align: right;" | 2700.00
| style="text-align: right;" | 2706
+
| style="text-align: right;" | 2706.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-05-24
 
| 1982-05-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2716
+
| style="text-align: right;" | 2716.00
| style="text-align: right;" | 2724.3
+
| style="text-align: right;" | 2724.30
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1982-05-25
 
| 1982-05-25
| Fracture  
+
| Fracture
| style="text-align: right;" | 2700
+
| style="text-align: right;" | 2700.00
| style="text-align: right;" | 2724.3
+
| style="text-align: right;" | 2724.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985-08-16
 
| 1985-08-16
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2700
+
| style="text-align: right;" | 2700.00
| style="text-align: right;" | 2724.3
+
| style="text-align: right;" | 2724.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985-08-16
 
| 1985-08-16
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2716
+
| style="text-align: right;" | 2716.00
| style="text-align: right;" | 2724.3
+
| style="text-align: right;" | 2724.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985-08-22
 
| 1985-08-22
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2700
+
| style="text-align: right;" | 2700.00
| style="text-align: right;" | 2706
+
| style="text-align: right;" | 2706.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-03-24
 
| 1992-03-24
| Chemical Squeeze  
+
| Chemical Squeeze
| style="text-align: right;" | 2746
+
| style="text-align: right;" | 2746.00
| style="text-align: right;" | 2752
+
| style="text-align: right;" | 2752.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-03-24
 
| 1992-03-24
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2746
+
| style="text-align: right;" | 2746.00
| style="text-align: right;" | 2752
+
| style="text-align: right;" | 2752.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-08-12
 
| 1998-08-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2737
+
| style="text-align: right;" | 2737.00
| style="text-align: right;" | 2741
+
| style="text-align: right;" | 2741.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1998-08-13
 
| 1998-08-13
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2737
+
| style="text-align: right;" | 2737.00
| style="text-align: right;" | 2741
+
| style="text-align: right;" | 2741.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 220: Line 374:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 253: Line 421:
 
| 1981
 
| 1981
 
| style="text-align: right;" | 77
 
| style="text-align: right;" | 77
| style="text-align: right;" | 56.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 259: Line 427:
 
| 1982
 
| 1982
 
| style="text-align: right;" | 1645
 
| style="text-align: right;" | 1645
| style="text-align: right;" | 895.9
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 265: Line 433:
 
| 1983
 
| 1983
 
| style="text-align: right;" | 4020
 
| style="text-align: right;" | 4020
| style="text-align: right;" | 138.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 271: Line 439:
 
| 1984
 
| 1984
 
| style="text-align: right;" | 5402
 
| style="text-align: right;" | 5402
| style="text-align: right;" | 14.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 277: Line 445:
 
| 1985
 
| 1985
 
| style="text-align: right;" | 373
 
| style="text-align: right;" | 373
| style="text-align: right;" | 2.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 117.9
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 285: Line 453:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 17:17, 12 July 2020

Well Details

Well ID: 0505111206022
Loading map...
Location: 02/06-12-050-11W5/2
Location Alias: 02/06-12-50-11 W5M
Location Alias 2: 02/06-12-050-11 W5/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 11
Section: 12
County/Municipality: Brazeau County
Well Name: KEYERA PEMBINA 6-12-50-11
Operator Name: Keyera Energy Ltd.
License Number: 0073756
License Date: 1979-01-03
License Status: Issued
Spud Date: 1979-01-17
Final Drill Date: 1979-03-11
Well Total Depth: 2876.00 m
Surface Hole Latitude: 53.299373
Surface Hole Longitude: -115.481103

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-03 Obtained License
1979-03-02 Drill Stem Test Performed
1979-03-03 Drill Stem Test Performed
1979-03-11 Finished Drilling
1979-03-11 Well Log Performed
1979-03-11 Well Mode changed to Drilled and Cased
1979-03-14 Production Casing Operation Performed
1979-04-03 Perforation Treatment Performed - Jet Perforation
1979-04-05 Perforation Treatment Performed - Cement Squeeze
1979-04-05 Perforation Treatment Performed - Jet Perforation
1979-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-06 Perforation Treatment Performed - Cement Squeeze
1979-04-06 Perforation Treatment Performed - Jet Perforation
1979-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-07 Perforation Treatment Performed - Cement Squeeze
1979-04-12 Perforation Treatment Performed - Jet Perforation
1981-07-18 Perforation Treatment Performed - Jet Perforation
1981-07-18 Well Began Production
1981-07-18 Well Fluid changed to Crude Oil
1981-07-18 Well Mode changed to Flowing
1982-03-03 Well Fluid changed to Crude Oil
1982-03-03 Well Mode changed to Suspended
1982-05-15 Perforation Treatment Performed - Cement Squeeze
1982-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-18 Perforation Treatment Performed - Jet Perforation
1982-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-19 Well Fluid changed to Crude Oil
1982-05-19 Well Mode changed to Flowing
1982-05-24 Perforation Treatment Performed - Jet Perforation
1982-05-25 Perforation Treatment Performed - Fractured
1985-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-16 Perforation Treatment Performed - Cement Squeeze
1985-08-16 Plug Back Performed
1985-08-22 Perforation Treatment Performed - Cement Squeeze
1985-08-22 Plug Back Performed
1985-08-22 Well Fluid changed to Crude Oil
1985-08-22 Well Mode changed to Abandoned Zone
1992-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-24 Perforation Treatment Performed - Chemical Squeeze
1998-08-11 Well Log Performed
1998-08-12 Perforation Treatment Performed - Jet Perforation
1998-08-12 Well Log Performed
1998-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-04-03 Perforation 2785.00 2790.00 3
1979-04-05 Cement Squeeze 2785.00 2790.00 0
1979-04-05 Perforation 2730.00 2731.00 3
1979-04-06 Acid Treatment 2730.00 2731.00 0
1979-04-06 Cement Squeeze 2730.00 2731.00 0
1979-04-06 Perforation 2694.00 2695.00 3
1979-04-06 Acid Treatment 2694.00 2695.00 0
1979-04-07 Acid Treatment 2694.00 2695.00 0
1979-04-07 Cement Squeeze 2694.00 2695.00 0
1979-04-12 Perforation 2746.00 2752.00 3
1981-07-18 Perforation 2700.00 2706.00 3
1982-05-15 Cement Squeeze 2700.00 2706.00 0
1982-05-18 Perforation 2700.00 2706.00 13
1982-05-18 Acid Treatment 2700.00 2706.00 0
1982-05-19 Acid Treatment 2700.00 2706.00 0
1982-05-24 Perforation 2716.00 2724.30 3
1982-05-25 Fracture 2700.00 2724.30 0
1985-08-16 Acid Treatment 2700.00 2724.30 0
1985-08-16 Cement Squeeze 2716.00 2724.30 0
1985-08-22 Cement Squeeze 2700.00 2706.00 0
1992-03-24 Chemical Squeeze 2746.00 2752.00 0
1992-03-24 Acid Treatment 2746.00 2752.00 0
1998-08-12 Perforation 2737.00 2741.00 14
1998-08-13 Acid Treatment 2737.00 2741.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 77 0.0 0.0 0.0
1982 1645 0.0 0.0 0.0
1983 4020 0.0 0.0 0.0
1984 5402 0.0 0.0 0.0
1985 373 0.0 0.0 0.0

For data sources see[5]

References