X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-36632

Well Details

Well ID: 37-063-36632
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2009-08-11
Last Permit Date: 2010-07-22
Spud Date: 2010-08-02
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.445685
Longitude: -79.158432

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 7222.0 334.0 0.0 0.0 0.0 0.0
2012-0 8235.0 333.0 0.0 0.0 0.0 0.0
2011-0 14466.0 334.0 0.0 0.0 0.0 0.0
2010-0 4712.0 122.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 35.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2010-0 PRODUCED FLUID 50.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2010-0 DRILLING FLUID WASTE 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2010-0 FRACING FLUID WASTE 1600.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2011-0 PRODUCED FLUID 50.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2012-0 PRODUCED FLUID 35.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2013-0 PRODUCED FLUID 30.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1902528 2010-08-03 No Violations Noted According to records, well permit granted on 8/11/09 and was completed to depth of 4815 ft. Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit aligned with 20 mil plastic and security fence. No freeboard issue. US Energy is contracted. Conductor pipe (13 7/8¿) set at 40 ft (sand). Water detected at 70 ft and 615 ft. Stratigraphy consisted of coal, ss and sh. Surface casing (8 7/8) set at 1574 ft. Universal present to cement surface casing. Pressure at 800 psi, 4.94 bbl flow rate, density at 8.36 dh consist throughout cementing. A total of 290 sks Class A cement was used. Plug down at 9:48 am. No signs of gas leak from around well and equipment.


1903845 2010-08-05 No Violations Noted According to records, well permit granted on 8/11/09 to depth of 4815 ft. Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit aligned with 20 mil plastic and security fence. No freeboard issue. US Energy is contracted. Conductor pipe (13 7/8¿) set at 40 ft (sand). Water detected at 70 ft and 615 ft. Stratigraphy consisted of coal, ss and sh. Surface casing (8 7/8) set at 1574 ft with total of 290 sks Class A. Current depth of 3500 ft. No signs of gas leak from around well and equipment.
1905465 2010-08-11 No Violations Noted At the time on inspection, site was properly signed with E&S plan available. Well drilled, not set for production. Filter fence installed down gradient from pad. One fenced drill pit located onsite appears structurally sound. Over 2ft of lined freeboard observed. Recommend that operator rock line ditchs surrounding pit and pad in order to reduce the potential or accelerated erosion during heavy rain events. Access road stable. No accelerated erosion or sedimentation or industrial waste issues were noted in relation to well site or access road at this time.
1950702 2011-02-04 No Violations Noted At the time of inspection, site Id sign and ES plan present. Well drilled and in production. Brine tank appears sound.

Observe smoking coming out of well production equipment, IMMEDIATELY called Mark Hopkins of Kriebel whom call the well tender. Mark later confirmed, well tender stated it was an over heated heater releasing steam and it was being addressed. Temporary bmp¿s in place, site not yet permanently restored. No accelerated erosion or sedimentation issues noted with site or access road. Access road and site snow covered.

2026109 2011-12-13 No Violations Noted At the time of inspection, well drilled (spud 8/02/10 ;drilling completed 8/09/10), equipped, and in production. Well tag present. Well site permanetly restored with adequate vegetation and rock. No accelerated erosion or sedimentation issues noted. One brine tank, appears structurally sound, located onsite and surrounded by vegetative dike. Access road stable. All temporary bmp's have been removed. No violations noted at time of this inspection.

References