If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-063-36427 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.449632,"lon":-79.118394,"icon":""}]} |
| Operator Name: PENN VIEW EXPLORATION CORP | |
| First Permit Date: 2009-02-12 | |
| Last Permit Date: 2009-02-12 | |
| Spud Date: 2009-03-04 | |
| Unconventional: No | |
| Horizontal: No | |
| Violations: None | |
| Latitude: 40.449632 | |
| Longitude: -79.118394 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2013-0 | 18248.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2012-0 | 23395.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-0 | 23414.19 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2010-0 | 30927.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
|---|---|---|---|---|
| 1833976 | 2009-10-06 | No Violations Noted | Based on record, permit was approved on 2/12/09. Well installed on 3/3/09 to depth of 4535 ft. Report submitted and approved on 4/28/09. Well completed with 8¿ pipe reduced to 4 ¿pipe reduced to 2¿ production pipe and 3 shut off valves. Production equipment consists of heater, separator (125 psi), 100 bbl brine tank (< 10 bbl of fluid) and dual phase data logger. At the time of inspection, no IW and E&S issues at the site. No signs of fluid or gas leakage around well head |