If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24272 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.46,"lon":-82.42,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Monroe Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: COLEMAN UNIT | |
License Status: Final Restoration | |
License Date: 2017-07-11 | |
Spud Date: 2006-07-01 | |
Spud Drilling Contractor: PINNACLE DRILLING | |
Final Drill Date: 2006-07-24 | |
Well Total Depth: 4747.00 ft | |
Configuration: Vertical | |
Latitude: 40.460000 | |
Longitude: -82.420000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-05-08 | Proposed Formations:TREMPEALEAU, Issued Date:5/8/2006, Expired Date:5/8/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2006-07-01 | RBDMS Rec GMM UPDATD PLUG STATUS PER PLUG REPORT |
Completed | 2006-07-24 | RBDMS Rec GMM UPDATD PLUG STATUS PER PLUG REPORT |
Reached Total Depth | 2006-07-24 | RBDMS Rec GMM UPDATD PLUG STATUS PER PLUG REPORT |
Completion Report Received | 2006-09-20 | RBDMS Rec GMM UPDATD PLUG STATUS PER PLUG REPORT |
APP | 2017-07-11 | Proposed Formations:TREMPEALEAU DOLOMITE, Issued Date:7/11/2017, Expired Date:7/11/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2017-07-28 | RBDMS Rec GMM UPDATD PLUG STATUS PER PLUG REPORT |
Record Last Modified | 2019-06-05 | RBDMS Rec GMM UPDATD PLUG STATUS PER PLUG REPORT |
Construction Permit Expires | 2019-07-11 | RBDMS Rec GMM UPDATD PLUG STATUS PER PLUG REPORT |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-12-14 | 4569 | 4656 | 46 |
4569 | 4656 | 46 | |
4569 | 4656 | 46 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 3000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2006 | BI JOE DEVELOPMENT INC | 3831.00 | 167.00 | 114 |
2007 | BI JOE DEVELOPMENT INC | 4031.00 | 919.00 | 365 |
2008 | BI JOE DEVELOPMENT INC | 649.00 | 646.00 | 365 |
2009 | BI JOE DEVELOPMENT INC | 194.00 | 486.00 | 365 |
2010 | BI JOE DEVELOPMENT INC | 220.00 | 379.00 | 365 |
2011 | BI JOE DEVELOPMENT INC | 34.00 | 188.00 | 365 |
2012 | BI JOE DEVELOPMENT INC | 0.00 | 225.00 | 366 |
2013 | BI JOE DEVELOPMENT INC | 0.00 | 137.00 | 365 |
2014 | BI JOE DEVELOPMENT INC | 0.00 | 170.00 | 365 |
2016 | BI JOE DEVELOPMENT INC | 0.00 | 86.00 | 365 |
2017 | BI JOE DEVELOPMENT INC | 0.00 | 156.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | BI JOE DEVELOPMENT INC | Brine | 831 | 114 |
2007 | BI JOE DEVELOPMENT INC | Brine | 1610 | 365 |
2008 | BI JOE DEVELOPMENT INC | Brine | 631 | 365 |
2009 | BI JOE DEVELOPMENT INC | Brine | 994 | 365 |
2010 | BI JOE DEVELOPMENT INC | Brine | 636 | 365 |
2011 | BI JOE DEVELOPMENT INC | Brine | 375 | 365 |
2012 | BI JOE DEVELOPMENT INC | Brine | 465 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 890 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 685 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 365 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 255 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1364530605 | 2017-8-1 0:00:0 | PB | No Violations | |
-1396248656 | 2006-7-6 0:00:0 | DD | No Violations | |
-16850 | 2017-7-26 0:00: | PB | No Violations | 2.00 |
-193973849 | 2017-7-6 0:00:0 | PW | No Violations | |
0000016850 | 2017-07-26 | Plug / Plug Back | No Violations | Witnessed bottom plug with Mark McCombs. |
0193973849 | 2017-07-06 | Production Wells | No Violations | This well has been permitted to be plugged this inspection is to establish the location and get a good GPS reading before it is plugged. There are no issues to note with this well. |
1153832887 | 2006-07-24 | Drill / Deepen / Reopen | No Violations | Rig still on site. PTO was broken and is being replaced. |
1158694638 | 2006-09-19 | Production Wells | No Violations | Well producing- good gas pressure at well head. Tanks have been set. |
1185192796 | 2007-07-23 | Production Wells | No Violations | Well is producing today. Tank battery looks good. |
1364530605 | 2017-08-01 | Plug / Plug Back | No Violations | Plugging operations have been completed and the owner is in the process of removing surface equipment and beginning restoration of the site. |
1396248656 | 2006-07-06 | Drill / Deepen / Reopen | No Violations | Witnessed surface casing cement job. |
1453305574 | 2018-1-29 0:00: | FR | No Violations | |
1494633431 | 2006-09-19 | Preliminary Restoration | No Violations | Pits filled. Area has been graded and seeded. Grass is coming up. |
1501084228 | 2017-07-26 | Plug / Plug Back | No Violations | Plugging operations have began with Bakerwell on this well today. They set a 400 foot bottom hole plug.Tom Zacharyasz was on site to assist me with plugging operations. Petroset Cementing Services Inc. was on site for cementing. |
For data sources see[9]