If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24409 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.45,"lon":-82.41,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Monroe Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: PETERS UNIT | |
License Status: Producing | |
License Date: 2008-09-08 | |
Spud Date: 2008-10-17 | |
Spud Drilling Contractor: LAND & SHORE DRILLING, LTD | |
Final Drill Date: 2008-10-21 | |
Well Total Depth: 2707.00 ft | |
Configuration: Vertical | |
Latitude: 40.450000 | |
Longitude: -82.410000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-09-08 | Proposed Formations:CLINTON, Issued Date:9/8/2008, Expired Date:9/8/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-10-21 | |
Completion Report Received | 2009-01-30 | |
Construction Permit Expires | 2009-09-08 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-03-06 | 2572 | 2591 | 25 |
2572 | 2591 | 25 | |
2572 | 2591 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 28830 Gal | 27500 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2009 | BI JOE DEVELOPMENT INC | 19556.00 | 0.00 | 365 |
2010 | BI JOE DEVELOPMENT INC | 11651.00 | 0.00 | 365 |
2011 | BI JOE DEVELOPMENT INC | 6928.00 | 0.00 | 365 |
2012 | BI JOE DEVELOPMENT INC | 5024.00 | 0.00 | 366 |
2013 | BI JOE DEVELOPMENT INC | 3641.00 | 0.00 | 365 |
2014 | BI JOE DEVELOPMENT INC | 3386.00 | 47.00 | 365 |
2015 | BI JOE DEVELOPMENT INC | 2700.00 | 0.00 | 365 |
2016 | BI JOE DEVELOPMENT INC | 2499.00 | 0.00 | 365 |
2017 | BI JOE DEVELOPMENT INC | 2413.00 | 0.00 | 365 |
2018 | BI JOE DEVELOPMENT INC | 1780.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | BI JOE DEVELOPMENT INC | Brine | 80 | 365 |
2010 | BI JOE DEVELOPMENT INC | Brine | 130 | 365 |
2011 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2012 | BI JOE DEVELOPMENT INC | Brine | 0 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 30 | 365 |
2015 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1691130250 | 2013-3-27 0:00: | PL | No Violations | |
-2034153918 | 2008-10-20 0:00 | DD | No Violations | |
1691130250 | 2013-03-27 | Preliminary Restoration | No Violations | I inspected this well today and found no violations and the well is in production. PRD passed |
2034153918 | 2008-10-20 | Drill / Deepen / Reopen | No Violations | Picked up cement tickets from surface job that took place 10/18/08. Drilling is currently at 1960 ft.Spoke with rig crew while on site. Pits are in and lined. |
For data sources see[9]