If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24425 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.45,"lon":-82.35,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Howard Township | |
Operator Name: STACH ENTERPRISES LLC | |
Well Pad ID: | |
Farm/Lease Name: ZOLLARS | |
License Status: Final Restoration | |
License Date: 2012-09-26 | |
Spud Date: 2009-03-26 | |
Spud Drilling Contractor: B & J DRLG | |
Final Drill Date: 2009-07-02 | |
Well Total Depth: 2783.00 ft | |
Configuration: Vertical | |
Latitude: 40.450000 | |
Longitude: -82.350000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-12-17 | Proposed Formations:CLINTON, Issued Date:12/17/2008, Expired Date:12/17/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-07-02 | |
Completion Report Received | 2009-12-23 | |
Change of Owner | 2011-12-12 | Operator changed from 8455, DEEP HOLE OIL & GAS LLC to 8901, STACH ENTERPRISES LLC |
APP | 2012-09-26 | Proposed Formations:, Issued Date:9/26/2012, Expired Date:9/26/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2012-12-07 | |
Construction Permit Expires | 2014-09-26 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1300 Bbl | 17000 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | DEEP HOLE OIL & GAS LLC | 4373.00 | 0.00 | 184 |
2010 | DEEP HOLE OIL & GAS LLC | 2951.00 | 0.00 | 365 |
2011 | DEEP HOLE OIL & GAS LLC | 2046.00 | 0.00 | 304 |
2012 | STACH ENTERPRISES LLC | 1684.00 | 0.00 | 366 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | DEEP HOLE OIL & GAS LLC | Brine | 0 | 184 |
2010 | DEEP HOLE OIL & GAS LLC | Brine | 0 | 365 |
2011 | DEEP HOLE OIL & GAS LLC | Brine | 0 | 304 |
2012 | STACH ENTERPRISES LLC | Brine | 75 | 366 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-220161674 | 2014-8-13 0:00: | FR | No Violations | |
0220161674 | 2014-08-13 | Final Restoration | No Violations | All plugging and production equiptment has been removed from well site. Vegetation has been restored. Previous well site currently exists within a bean field. Final restoration passes. |
1356545924 | 2012-12-07 | Plug / Plug Back | No Violations | Today I witnessed plugging operations on this well for Stach Enterprises. Maram Energy was contracted by Stach Enterprises to plug this well. Doug Lyons was on location for Maram. A pre-cast concrete plug was placed on the rip at 2094 feet. I witnessed clay washed in on top of the pre-cast plug to the surface. |
1924213498 | 2012-12-07 | Plug / Plug Back | No Violations | I witnessed plugging operations today for Stach Enterprises. Maram Energy was contracted to plug this well with clay. Doug with Maram Energy was on location. The 4.5 inch casing was shot off at 2,094 feet. A concrete pre-cast plug was placed on top of the rip. I witnessed clay washed in on top of the pre-cast plug to the surface. |
For data sources see[8]