If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-167-29609 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.59,"lon":-81.39,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Washington | |
Municipality: Salem Township | |
Operator Name: GENESIS RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: BONAR C/MM | |
License Status: Producing | |
License Date: 2006-07-13 | |
Spud Date: 2006-08-17 | |
Spud Drilling Contractor: CENTURY WELL SERVICES,INC | |
Final Drill Date: 2006-08-25 | |
Well Total Depth: 2370.00 ft | |
Configuration: Vertical | |
Latitude: 39.590000 | |
Longitude: -81.390000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-07-13 | Proposed Formations:BEREA-GORDON, Issued Date:7/13/2006, Expired Date:7/13/2007 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2006-08-05 | DRILLING COMPLETION DATE ERRONEOUSLY REPORTED AS 08/05/06, WHICH WOULD HAVE BEEN 12 DAYS BEFORE THE SPUD DATE. THE COMPLETION DATE WAS REVISED TO 8/25/06, WHICH IS THE DATE THE OPEN HOLE LOGS WERE RUN. GM |
Original Spud | 2006-08-17 | DRILLING COMPLETION DATE ERRONEOUSLY REPORTED AS 08/05/06, WHICH WOULD HAVE BEEN 12 DAYS BEFORE THE SPUD DATE. THE COMPLETION DATE WAS REVISED TO 8/25/06, WHICH IS THE DATE THE OPEN HOLE LOGS WERE RUN. GM |
Reached Total Depth | 2006-08-25 | DRILLING COMPLETION DATE ERRONEOUSLY REPORTED AS 08/05/06, WHICH WOULD HAVE BEEN 12 DAYS BEFORE THE SPUD DATE. THE COMPLETION DATE WAS REVISED TO 8/25/06, WHICH IS THE DATE THE OPEN HOLE LOGS WERE RUN. GM |
Completion Report Received | 2007-05-15 | DRILLING COMPLETION DATE ERRONEOUSLY REPORTED AS 08/05/06, WHICH WOULD HAVE BEEN 12 DAYS BEFORE THE SPUD DATE. THE COMPLETION DATE WAS REVISED TO 8/25/06, WHICH IS THE DATE THE OPEN HOLE LOGS WERE RUN. GM |
Construction Permit Expires | 2007-07-13 | DRILLING COMPLETION DATE ERRONEOUSLY REPORTED AS 08/05/06, WHICH WOULD HAVE BEEN 12 DAYS BEFORE THE SPUD DATE. THE COMPLETION DATE WAS REVISED TO 8/25/06, WHICH IS THE DATE THE OPEN HOLE LOGS WERE RUN. GM |
Change of Owner | 2015-07-10 | Operator changed from 6288, ALLIANCE PETROLEUM CORPORATION to 9086, GENESIS RESOURCES LLC |
Record Last Modified | 2015-09-24 | DRILLING COMPLETION DATE ERRONEOUSLY REPORTED AS 08/05/06, WHICH WOULD HAVE BEEN 12 DAYS BEFORE THE SPUD DATE. THE COMPLETION DATE WAS REVISED TO 8/25/06, WHICH IS THE DATE THE OPEN HOLE LOGS WERE RUN. GM |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-08-29 | 1852 | 1914 | 12 |
2007-08-29 | 1756 | 1761 | 16 |
1756 | 1761 | 16 | |
1852 | 1914 | 12 | |
1988 | 2014 | 10 | |
2126 | 2159 | 20 | |
1756 | 1761 | 16 | |
2007-08-29 | 2126 | 2159 | 20 |
2007-08-29 | 1988 | 2014 | 10 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 600 Bbl | 10000 | BEREA, GANTZ, THIRTY-FOOT, & GORDON WERE FRACED AS PART OF SAME OPERATION. GM |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | ALLIANCE PETROLEUM CORPORATION | 3877.00 | 0.00 | 365 |
2008 | ALLIANCE PETROLEUM CORPORATION | 9039.00 | 96.00 | 365 |
2009 | ALLIANCE PETROLEUM CORPORATION | 6328.00 | 78.00 | 365 |
2010 | ALLIANCE PETROLEUM CORPORATION | 4466.00 | 52.00 | 365 |
2011 | ALLIANCE PETROLEUM CORPORATION | 3745.00 | 0.00 | 365 |
2012 | ALLIANCE PETROLEUM CORPORATION | 3059.00 | 141.00 | 366 |
2013 | ALLIANCE PETROLEUM CORPORATION | 3281.00 | 78.00 | 365 |
2014 | ALLIANCE PETROLEUM CORPORATION | 2726.00 | 47.00 | 365 |
2015 | GENESIS RESOURCES LLC | 1117.00 | 20.00 | 184 |
2016 | GENESIS RESOURCES LLC | 2524.00 | 19.00 | 298 |
2017 | GENESIS RESOURCES LLC | 1498.00 | 27.00 | 301 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2008 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2009 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2010 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2011 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2012 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 366 |
2013 | ALLIANCE PETROLEUM CORPORATION | Brine | 2 | 365 |
2014 | ALLIANCE PETROLEUM CORPORATION | Brine | 1 | 365 |
2015 | GENESIS RESOURCES LLC | Brine | 0 | 184 |
2016 | GENESIS RESOURCES LLC | Brine | 0 | 298 |
2017 | GENESIS RESOURCES LLC | Brine | 0 | 301 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0540520397 | 2008-06-16 | Preliminary Restoration | No Violations | Inspection this day found well with jack producing, current chart in meter, central tank pad, good IDs but faded, good dike. Location has been reclaimed but lease raod needs work - talked to Marty and he will work it and put water bars with reclaiming other wells in the area which will be very soon. |
540520397 | 2008-6-16 0:00: | PL | No Violations |
For data sources see[9]