If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-167-29758 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.56,"lon":-81.58,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Washington | |
Municipality: Adams Township | |
Operator Name: PDC ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: MASON | |
License Status: Not Drilled | |
License Date: 2015-08-25 | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.560000 | |
Longitude: -81.580000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-08-25 | Proposed Formations:POINT PLEASANT, Issued Date:8/25/2015, Expired Date:8/24/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Construction Permit Expires | 2017-08-24 | |
Record Last Modified | 2018-11-01 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0119952161 | 2015-09-30 | Drill / Deepen / Reopen | No Violations | On location to check status of drive pipe/conductor drilling for this well. Upon arrival, HAD Drilling Contractors had just reached competent rock at 97. I witnessed the welding of the final 20 joint of 30 drive pipe and the drilling of the pipe into the ground to 117. HADs rig will now move to P#29760. |
119952161 | 2015-9-30 0:00: | DD | No Violations | 2.50 |
1444136087 | 2015-10-05 | Drill / Deepen / Reopen | No Violations | Upon inspection, it was observed that HAD Drilling Contractors rig is now moved off of this hole and is sitting beside it. I spoke with Mr. Don Kreager of PDC and he stated that 118 of 30 drive pipe was set and that competent bedrock was encountered at 95. The rig will remain on the location until PDC decides how they want the mouse holes to be set and grouted. |
1787538982 | 2015-09-28 | Drill / Deepen / Reopen | No Violations | HAD Drilling Contractors is rigged up over the cellar for this well and will commence 30 drive pipe/conductor drilling operations on 9/29/2015. |
For data sources see[3]