If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-029-21773 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.7,"lon":-80.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Columbiana | |
Municipality: Franklin Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000644 | |
Farm/Lease Name: HRUBY FARMS 10-14-4 | |
License Status: Producing | |
License Date: 2013-04-24 | |
Spud Date: 2013-05-01 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-05-11 | |
Well Total Depth: 14285.00 ft | |
Configuration: Horizontal | |
Latitude: 40.700000 | |
Longitude: -80.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-02-15 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:2/15/2013, Expired Date:2/15/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2013-04-24 | Proposed Formations:POINT PLEASANT, Issued Date:4/24/2013, Expired Date:4/24/2015 12:00:00 PM, Drilling unit acres:172.63, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-05-11 | |
Correction to Well | 2013-09-06 | CORRECTION TO TARGET INFORMATION (FOOTAGE & X, Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 154.90 ACRES. |
Completion Report Received | 2014-05-05 | |
Construction Permit Expires | 2015-04-24 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-05-07 | 8223 | 14080 | 770 |
8223 | 14080 | 770 | |
8223 | 14080 | 770 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/11/2013 | 11/14/2013 | 7905 | 5,839,470.0 | 403204 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | PTLCS226 | PERFORMANCE TECHNOLOGIES | KCl Substitute | No Hazardous Components | NONE | 0 | 0 | 0 |
PTLMP136 | PERFORMANCE TECHNOLOGIES | Acid | Water | 007732-18-5 | 85 | 0.84887 | 0 | |
Hydrochloric Acid | 007647-01-0 | 15 | 0.1498 | 0 | ||||
Northern White Sand | PERFORMANCE TECHNOLOGIES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 11.4877 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.25377 | 0 | |
100 Mesh Sand | PERFORMANCE TECHNOLOGIES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 1.22532 | 0 | |
PTLBW112 | PERFORMANCE TECHNOLOGIES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00413 | 0 | |
PTLSI372 | PERFORMANCE TECHNOLOGIES | Scale Inhibitor | No Hazardous Components | NONE | 0 | 0 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 85.7192 | 0 | |
EC6111A | NALCO | Anti-Bacterial Agent | Water | 007732-18-5 | 0 | 0.04226 | 0 | |
Glutaraldehyde (Pentanediol) | 000111-30-8 | 30 | 0.0123 | 0 | ||||
PTLAI171, PTLBW112, PTLCS226, PTLFR200, PTLGL240, PTLSI372 | PERFORMANCE TECHNOLOGIES | Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, KCl Substitute, Scale Inhibitor | Choline Chloride | 000067-48-1 | 0 | 0.10317 | 0 | |
Proprietary Oxyalkylated Fatty Acid Derivative | TRADE SECRET | 0 | 0.08805 | 0 | ||||
Guar Gum | 009000-30-0 | 0 | 0.08375 | 0 | ||||
Proprietary Clay | TRADE SECRET | 0 | 0.08375 | 0 | ||||
Proprietary Substituted Fatty Acid Ester | TRADE SECRET | 0 | 0.08805 | 0 | ||||
Proprietary Methanol | TRADE SECRET | 0 | 0.00067 | 0 | ||||
Tetrasodium Ethylenediaminetetraacetate | 000064-02-8 | 0 | 0.08805 | 0 | ||||
Copper Sulfate | 007758-98-7 | 0 | 0.00099 | 0 | ||||
Diethylene Glycol | 000111-46-6 | 0 | 0.00067 | 0 | ||||
Water | 007732-18-5 | 0 | 0.21072 | 0 | ||||
2-Ethylhexanol | 000104-76-7 | 0 | 0.00067 | 0 | ||||
Proprietary Vinyl Copolymer | TRADE SECRET | 0 | 0.08994 | 0 | ||||
Proprietary Surfactant | TRADE SECRET | 0 | 0.08375 | 0 | ||||
Proprietary Polycarboxylic Acid Polymer | TRADE SECRET | 0 | 0.01883 | 0 | ||||
Proprietary Alkylene Oxide Block Polymer | TRADE SECRET | 0 | 0.00067 | 0 | ||||
Sodium Chloride | 007647-14-5 | 0 | 0.08805 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 0 | 0.00103 | 0 | ||||
Proprietary Aliphatic Alcohol | TRADE SECRET | 0 | 0.08805 | 0 | ||||
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 0 | 0.08375 | 0 | ||||
PTLCA102 | PERFORMANCE TECHNOLOGIES | Cross Linker | Proprietary Inorganic Salt | TRADE SECRET | 30 | 0.00055 | 0 | |
Sodium Hydroxide | 001310-73-2 | 60 | 0.0011 | 0 | ||||
Proprietary Alkyl Alcohol | TRADE SECRET | 60 | 0.0011 | 0 | ||||
PTLAI171 | PERFORMANCE TECHNOLOGIES | Corrosion Inhibitor | Dimethyl Formamide | 000068-12-2 | 10 | 0.00017 | 0 | |
Proprietary Aromatic Aldehyde | TRADE SECRET | 10 | 0.00017 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 30 | 0.0005 | 0 | ||||
Isopropanol (Isopropyl Alcohol, Propan-2-ol) | 000067-63-0 | 60 | 0.00101 | 0 | ||||
Proprietary Organic Amine Resin Salt | TRADE SECRET | 30 | 0.0005 | 0 | ||||
Proprietary Quaternary Ammonium Compound | TRADE SECRET | 10 | 0.00017 | 0 | ||||
PTLFR200 | PERFORMANCE TECHNOLOGIES | Friction Reducer | Proprietary Aliphatic Hydrocarbon | TRADE SECRET | 30 | 0.02591 | 0 | |
Proprietary Oxyalkylated Alcohol | TRADE SECRET | 5 | 0.00432 | 0 | ||||
PTLGL240 | PERFORMANCE TECHNOLOGIES | Gelling Agent | No Hazardous Components | NONE | 0 | 0 | 0 | |
PTLIS352 | PERFORMANCE TECHNOLOGIES | Iron Control Agent | Citric Acid | 000077-92-9 | 100 | 0.00053 | 0 | |
PTLBW102 | PERFORMANCE TECHNOLOGIES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00017 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-11-13 | H2O | 15 | 6124 Bbl | 330120 | Performance Technologies | STAGE 15
35 SHOTS |
0 | 0 | 0 | ||||
2013-11-11 | H2O | 15 | 6264 Bbl | 331120 | Performance Technologies | STAGE 1
35 SHOTS |
2013-11-13 | H2O | 15 | 5762 Bbl | 320287 | Performance Technologies | STAGE 16
35 SHOTS |
2013-11-17 | H2O | 15 | 6131 Bbl | 330820 | Performance Technologies | STAGE 20
35 SHOTS |
2013-11-12 | H2O | 15 | 5036 Bbl | 330860 | Performance Technologies | STAGE 9
35 SHOTS |
2013-11-12 | H2O | 15 | 5674 Bbl | 327900 | Performance Technologies | STAGE 8
35 SHOTS |
2013-11-18 | H2O | 15 | 5753 Bbl | 327420 | Performance Technologies | STAGE 21
35 SHOTS |
2013-11-13 | H2O | 15 | 6118 Bbl | 330460 | Performance Technologies | STAGE 13
35 SHOTS |
2013-11-14 | H2O | 15 | 5922 Bbl | 320812 | Performance Technologies | STAGE 17
35 SHOTS |
2013-11-11 | H2O | 15 | 6328 Bbl | 331720 | Performance Technologies | STAGE 2
35 SHOTS |
2013-11-13 | H2O | 15 | 6183 Bbl | 329800 | Performance Technologies | STAGE 14
35 SHOTS |
2013-11-11 | H2O | 15 | 5838 Bbl | 300420 | Performance Technologies | STAGE 4
35 SHOTS |
2013-11-13 | H2O | 15 | 7247 Bbl | 324520 | Performance Technologies | STAGE 11
35 SHOTS |
2013-11-12 | H2O | 15 | 6693 Bbl | 328900 | Performance Technologies | STAGE 7
35 SHOTS |
2013-11-15 | H2O | 15 | 5760 Bbl | 329940 | Performance Technologies | STAGE 18
35 SHOTS |
2013-11-11 | H2O | 15 | 5180 Bbl | 329020 | Performance Technologies | STAGE 5
35 SHOTS |
2013-11-12 | H2O | 15 | 6179 Bbl | 329500 | Performance Technologies | STAGE 10
35 SHOTS |
2013-11-12 | H2O | 15 | 6371 Bbl | 329780 | Performance Technologies | STAGE 6
35 SHOTS |
2013-11-18 | H2O | 15 | 5857 Bbl | 331260 | Performance Technologies | STAGE 22
35 SHOTS |
2013-11-13 | H2O | 15 | 6075 Bbl | 329480 | Performance Technologies | STAGE 12
35 SHOTS |
2013-11-11 | H2O | 15 | 6229 Bbl | 329480 | Performance Technologies | STAGE 3
35 SHOTS |
2013-11-16 | H2O | 15 | 5978 Bbl | 328000 | Performance Technologies | STAGE 19
35 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 55813 | 449 | 18 |
2014 | CHESAPEAKE EXPLORATION LLC | 1267538 | 2071 | 364 |
2015 | CHESAPEAKE EXPLORATION LLC | 677311 | 180 | 304 |
2016 | CHESAPEAKE EXPLORATION LLC | 546351 | 91 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 408474 | 78 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 335160 | 113 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 74280 | 38 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 4625 | 18 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 7669 | 364 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 2797 | 304 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2281 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1675 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1402 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 757 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1582137025 | 2013-2-19 0:00: | SC | No Violations | |
-453066128 | 2017-8-21 0:00: | PW | No Violations | 0.50 |
-589339259 | 2013-4-19 0:00: | DD | No Violations | |
0128696456 | 2016-03-29 | Production Wells | No Violations | I was on location for a status check. My inspection found the access road gate locked and the
access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #8H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the tank battery. The equipment on the pad consists of the following: 6 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 1 - Gas processing units (GPU) 1 - Vertical separator 1 - Sand separator 1 - Thermal electric generator 1 - Producing well Site fenced and man doors locked |
0263677733 | 2013-05-04 | Drill / Deepen / Reopen | No Violations | |
0453066128 | 2017-08-21 | Production Wells | No Violations | The purpose of my inspection was to conduct a status check on well#2-1773. The lease road and well pad remained in good repair. The topsoil stockpile remained stable. A locked chain link fence was constructed around the facility. No signs of vandalism were present. A stable earthen berm was present outside of the fenced perimeter. Correct identification was present. The well cellar contained fresh water near free board. No leaks were detected. The 9.625 annular pressure gauge indicated 2.5 psi. The 5.5 annular pressure gauge indicated 390 psi. The well was flowing during the inspection. The 5.5 production casing was equipped with a plunger lift assembly. Production equipment on the pad consisted of (1) sand knockout and GPU, one (1) hydrate inhibitor tank, one (1) meter run, one (1) thermal generator and three (3) 400 bbl produced water and three (3) 400 bbl condensate tanks inside steel containment. The containment was lined with an impervious liner and was holding fresh water. No violations were observed during this inspection. |
0507093736 | 2017-01-30 | Production Wells | No Violations | The purpose for my inspection was to conduct a status check on well #2-1773-00-00. RBDMS indicates the operator is current with reporting production. The lease entrance is marked with a sign board containing signs reporting required well identification and emergency response information. The lease road was stable and drivable. No signs of erosion were observed adjacent to the road traveling to the pad. An earthen dike perimeter is erected around the well pad. A chain link fence with barbed wire top is constructed around the pad to prevent unauthorized entry. An Emergency Shut Down (ESD) button was adjacent to the main entrance gate. The main entry gate and escape doors positioned around the perimeter were found to be closed and locked. The soil stockpile was stabilized with well- |
0557797908 | 2013-03-26 | Surface Facility Construction | No Violations | I stopped at the site to check on the pad construction. Construction of the access road and pad were in progress. Considerable work remains for completion. |
0589339259 | 2013-04-19 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the conductor casing. Express Energy Services drilled a 26 diameter hole to 118. Express installed 118 of 20 OD casing. During drilling, water was encountered at an approximate depth of 30. Express Energy Services was the cementing contractor. The cement was mudscaled at 15.5 pounds per gallon (ppg), and adjusted to 15.6 ppg. Express pumped 51.49 bbls of cement slurry at 15.6 ppg. The cement was displaced with 39.07 bbls of water. Cement returns to surface were observed. An estimated 10 bbls of cement returned to surface. Displacement was completed at 4:11pm. |
128696456 | 2016-3-29 0:00: | PW | No Violations | |
1367333622 | 2013-01-09 | Surface Facility Construction | No Violations | I went to the site and conducted a pre-construction site inspection with Cody Theimer, Chesapeake Field Representative. |
1369077696 | 2013-05-13 | Drill / Deepen / Reopen | No Violations
-based mud used to drill and condition the hole, a lead cement slurry followed by a tail cement slurry were pumped. The lead cement was mudscaled at 13.5 pounds per gallon (ppg). Schlumberger pumped 335 bbls of lead cement at 13.5 ppg. Schlumberger then pumped 352 bbls of tail cement at 15.0 ppg. The plug was dropped and displaced with 317.5 bbls of water as measured by tanks. The plug bumped the float collar at 5:10am on 05/13/2013. Pressure at plug bump was 2511 psi. Pressure was raised to 3120 psi, and held for 5 minutes. Pressure held. The float held when the pressure was released, and 3.5 bbls of water bled back. An estimated 11 bbls of the 60 bbl Mudpush spacer returned to surface. | |
1391632252 | 2014-02-04 | Preliminary Restoration | No Violations
-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Along the interior of the chain link fence there is a site drain installed. Outlets are located at the south and west ends of the pad. Inside the fence, there is an earthen berm, with well-established ground cover. The soil stockpile is well stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary restoration is complete and approved. | |
1582137025 | 2013-02-19 | Surface Facility Construction | No Violations | I stopped at the site to check on the pad construction. Construction had not yet begun. Pipeline construction was in progress in the area. |
1627754975 | 2013-05-01 | Drill / Deepen / Reopen | No Violations | I went to the site and had a pre-spud meeting with drilling consultant Chuck Butler regarding the drilling of the borehole for the surface casing. The rig will provide a copy of the open hole log, both paper and electronic. The mud loggers will also provide their determination of the top and bottom of the Big Injun Sandstone. It is anticipated that the rig will begin drilling within an hour or so. |
1808334388 | 2013-05-02 | Drill / Deepen / Reopen | No Violations | |
263677733 | 2013-5-4 0:00:0 | DD | No Violations | |
507093736 | 2017-1-30 0:00: | PW | No Violations | 1.60 |
557797908 | 2013-3-26 0:00: | SC | No Violations |
For data sources see[10]