X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-029-21799

Well Details

Well ID: 34-029-21799
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Salem Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000737
Farm/Lease Name: MANGUS 3-15-3
License Status: Producing
License Date: 2013-06-07
Spud Date: 2013-06-15
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-06-28
Well Total Depth: 14129.00 ft
Configuration: Horizontal
Latitude: 40.890000
Longitude: -80.790000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-17 Proposed Formations:TRENTON BLACK RIVER, Issued Date:4/17/2013, Expired Date:4/17/2015 12:00:00 PM, Drilling unit acres:8.82, Proposed Well Type:OG, Proposed Well Class:STRT
Correction to Well 2013-05-03 CORRECTION TO CASING PROGRAM
APP 2013-06-07 Proposed Formations:POINT PLEASANT, Issued Date:6/7/2013, Expired Date:6/7/2015 12:00:00 PM, Drilling unit acres:159.53, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-06-14 CORRECTION TO TARGET FOOTAGE
Correction to Well 2013-06-21 CORRECTION TO CASING PROGRAM
Reached Total Depth 2013-06-28
Correction to Well 2013-09-06 CORRECTION TO TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 144.05 ACRES.
Correction to Well 2014-01-10 CHANGE IN TAKE-POINT INFORMATION (COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 144.79 ACRES.
Construction Permit Expires 2015-06-07
Completion Report Received 2015-10-27
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-08-13 8542 13927 732
8542 13927 732
8542 13927 732

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/07/2013 12/14/2013 7604 5,373,140.0 357671

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 86.6222 0
A264, B244, B317, J218, J475, J580,

J609, J610, L058, S001, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, KCl Substitute, Scale Inhibitor, Acid, Proppant - Natural Diammonium peroxidisulphate 7727-54-0 0.01 0.00139 0
Sodium hydroxide 1310-73-2 0 0 0
Potassium borate 1332-77-0 0.11 0.01461 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0
Potassium hydroxide 1310-58-3 0.04 0.0054 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0 0
Trisodium ortho phosphate 7601-54-9 0.01 0.00074 0
Sodium erythorbate 6381-77-7 0.01 0.00078 0
Prop-2-yn-1-ol 107-19-7 0 0.00009000 0
Sodium sulfate 7757-82-6 0.04 0.00498 0
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen

phosphate), sodium salt

68171-29-9 0.01 0.00169 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00001000 0
Octamethylcyclotetrasiloxane 556-67-2 0 0 0
Guar gum 9000-30-0 0.43 0.05617 0
Fatty acids, tall-oil 61790-12-3 0 0.00033 0
Glutaraldehyde 111-30-8 0.04 0.00584 0
poly(tetrafluoroethylene) 9002-84-0 0 0 0
Hydrogen chloride 7647-01-0 1.33 0.17373 0
Ethane-1,2-diol 107-21-1 0 0.00021 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00003000 0
Ammonium sulfate 7783-20-2 0.09 0.01153 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.00013 0
Calcium chloride 10043-52-4 0.08 0.01073 0
Potassium chloride 7447-40-7 0 0.00063 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00028 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.09 0.0122 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0.01 0.00131 0
Alkenes, C>10 a- 64743-02-8 0 0.00006000 0
Glycerol 56-81-5 0.04 0.00477 0
Dimethyl siloxanes and silicones 63148-62-9 0 0.00001000 0
Methanol 67-56-1 0 0.00046 0
Sodium chloride 7647-14-5 0 0.00019 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00021 0
Crystalline silica 14808-60-7 97.68 12.7455 0
Non-crystalline silica 7631-86-9 0 0.00027 0
Urea 57-13-6 0.01 0.0008 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-12-14 H2O 0 3434 Bbl 315440 Schlumberger STAGE 21/21

35 SHOTS

2013-12-07 H2O 0 5236 Bbl 314220 Schlumberger STAGE 1/21

35 SHOTS STAGES 2-20 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC 357150 12812 133
2016 CHESAPEAKE EXPLORATION LLC 397892 4777 366
2017 CHESAPEAKE EXPLORATION LLC 251538 2300 365
2018 CHESAPEAKE EXPLORATION LLC 198365 1568 365
2019 CHESAPEAKE EXPLORATION LLC 43685 494 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC Brine 4646 133
2016 CHESAPEAKE EXPLORATION LLC Brine 3458 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1602 365
2018 CHESAPEAKE EXPLORATION LLC Brine 1261 365
2019 CHESAPEAKE EXPLORATION LLC Brine 689 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-111819665 2012-11-16 0:00 SC No Violations
-1495425853 2013-6-24 0:00: DD No Violations
-1720279817 2017-2-9 0:00:0 PW No Violations 1.70
-1728459954 2013-6-29 0:00: CS No Violations
-1874562523 2016-3-3 0:00:0 PL No Violations 1.00
-794507285 2017-8-9 0:00:0 PW No Violations 0.70
0111819665 2012-11-16 Surface Facility Construction No Violations I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
0323961220 2013-06-05 Casing String Witnessed No Violations
0649678905 2013-06-06 Drill / Deepen / Reopen No Violations I was on location to check the status of the mine string being drilled on this location with an auger rig. A 30 conductor was set to 60 and they expected the mine void to be hit around 115 below the surface. The auger rig will drill the mine string and set 20 welded casing into the mine void. I had to leave the location for a surface cement job before I could witness the job.
0794507285 2017-08-09 Production Wells No Violations The purpose of my inspection was to conduct a status check on well #2-1799. The lease road and well pad remained in good repair. The topsoil stockpile remained stable. A locked chain link fence was constructed around the facility. No signs of vandalism were present. A stable earthen berm was present outside of the fenced perimeter. Correct identification was present. The well cellar was backfilled with gravel. No leaks were detected. The 9.625 annular pressure gauge indicated 0 psi. The 5.5 annular pressure gauge indicated 200 psi. The well was flowing during the inspection. The 5.5 production casing was equipped with a plunger lift assembly. Production equipment on the pad consisted of (1) sand knockout and GPU, one (1) hydrate inhibitor tank, one (1) meter run and three (3) 400 bbl produced water and three (3) 400 bbl condensate tanks inside steel containment. The containment was lined with an impervious liner and was holding fresh water. No violations were observed during this inspection.
1372683018 2013-06-18 Casing String Witnessed No Violations
1495425853 2013-06-24 Drill / Deepen / Reopen No Violations
1707697631 2016-02-19 Production Wells No Violations I was on location for a status check. My inspection found the access road gate locked and the

access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #1H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the tank battery. The equipment on the pad consists of the following: 6 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 1 - Gas processing units (GPU) 1 - Vertical separator 1 - Sand separators 1 - Thermal electric generator 1 - Compressor 1 - Producing wells Site fenced and man doors locked

1720279817 2017-02-09 Production Wells No Violations The purpose for my inspection was to conduct a status check on well #2-1799-00-
1724587061 2013-06-07 Casing String Witnessed No Violations

--Tex Pumping LLC was the cementing contractor. There was good fluid circulation throughout the cementing operation. The cement was mudscaled at 15.8 pounds per gallon (ppg). O-Tex adjusted the cement density, and pumped 79 bbls of cement slurry at 15.6 ppg. An estimated 10 bbls of cement returned to surface, and were mudscaled at 15.5 ppg. The cement was displaced with 59 bbls of water. Displacement was completed at 12:57am on 06/08/2013. Approximately 10 of cement were left inside the casing. The valve on the top of the casing was shut in.

1728459954 2013-06-29 Casing String Witnessed No Violations

-based mud used to drill and condition the hole, a lead cement followed by a tail cement were pumped. The lead and tail slurries were mudscaled, and Schlumberger pumped 273 bbls of lead cement at 13.5 pounds per gallon (ppg), and 333 bbls of tail cement at 15.0 ppg. The plug was dropped and displaced with 307 bbls of water as measured by pump truck tanks. The plug bumped the float collar at 9:32pm on 06/29/2013. The plug landing pressure was 2204 psi, and it was raised to 2786 psi and held for 5 minutes. Pressure held. The float held when the pressure was released, and 3 bbls of water bled back.

1874562523 2016-03-03 Preliminary Restoration No Violations I was on location for a status check. My inspection found the access road gate locked and the access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #1H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the tank battery.

The equipment on the pad consists of the following: 6 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 1 - Gas processing unit (GPU) 1 - Sand separator 1 - Thermal electric generator 1 - Heat treater

1 - Vertical separator 1 - Producing well Site fenced and man doors locked

2014370236 2013-06-15 Casing String Witnessed No Violations
323961220 2013-6-5 0:00:0 CS No Violations
649678905 2013-6-6 0:00:0 DD No Violations 1.50

For data sources see[10]

References